Preliminary evaluation of in situ leaching on MTA [Minad-Teton Australia's] uranium deposits in the Lake Frome area, SA.
In-situ leaching of a uranium orebody can only be successful if the deposit meets a number of essential criteria. These criteria are: 1. The ore occurs in a generally porous and permeable horizontal bed underlain and overlain by impermeable strata;...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Continuous solvent extraction studies.
Work carried out at Amdel and at the Colorado School of Mines' Research Institute has indicated that both a two solvent system (EHPA and TBP or DBBP) and a three solvent system (EHPA, DBBP and Alamine 336) of cationic exchangers are satisfactory for...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
SADM/Amdel Project MP 1/1/172: In situ leaching of uranium (Honeymoon deposit, Frome Embayment). [Results of analytical, mineralogical and metallurgical testwork performed on diamond drill core samples]. Progress reports 1-6, May 1975 to November 1976.
At the request of Mines Administration and of the South Australian Mines Department, Amdel has undertaken a project designed to obtain data on the in situ leaching potential of the uranium ore in the Honeymoon deposit, located in the Lake Frome region...-
Document
Published: 05 Nov 1976
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated : Security Dam. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
A small licence area located ~30 km north of Cockburn has been being explored for possible economic shallowly buried sedimentary roll front style uranium mineralisation that may have formed within inferred Tertiary fluvial channel sands of the...-
Document
Published: 10 Oct 1917
-
Lake Frome [part of the Paralana Plains Uranium Project joint venture area]. Progress reports and technical reports to licence surrender/re-issue over a different area, for the period 22/4/1971 to 21/4/1973.
Exploration on SML 564 has consisted of a continuation of deep rotary mud open hole, plug and core drilling plus washing-out of existing, older Petromin "P...w" series drillholes to allow new generation downhole geophysical logging, aimed at further...-
Document
-
Honeymoon "in situ" leach tests.
The major aim of this project is to develop a method of leaching a range of ore types in the Honeymoon deposit using the push-pull technique. For alkaline leaching, reagent conditions were based on laboratory bottle roll studies and data from the...-
Document
-
Honeymoon uranium : a summary of the proposed in-situ leach mining operation.
This report discusses technical aspects of the Honeymoon uranium deposit and the proposed in-situ leach mining method intended for extracting about 3000 tonnes of contained U3O8. Economic forecasts and mine development plans are presented as a way of...-
Document
-
Paralana Creek and Four Mile Creek [part of the Paralana Plains Joint Venture area]. Progress reports for the period 15/4/1968 to 14/4/1971.
A licence area covering the flat alluvial Paralana Plains extending out eastwards from the northern Flinders Ranges was taken up by the the consortium of Exoil NL, Petromin NL and Transoil NL to explore for possible economic buried occurrences of...-
Document
-
Soil and groundwater investigation, Beverley prospect, SML 564. Report on Stage I feasibility study.
The Stage 1 feasibility study carried out during February-May, 1973 has included regional groundwater studies, pumping tests, logging and laboratory tests on drill cores, slope stability analyses, preliminary design of pit slopes and dewatering...-
Document
Published: 31 May 1973
-
Report on Honeymoon deposit coring programme, June 1975 - South Eagle portion of EL 132, SA.
This report summarises the drilling and coring operations conducted during June and July 1975 to obtain representative core samples of the Honeymoon sedimentary uranium deposit. The work was carried out to determine uranium content, associated...-
Document
Published: 21 Oct 1975
-
Preliminary [mining] feasibility study [for the] Lake Frome uranium orebodies. Final report.
Report presents the results of a preliminary study of the commercial feasibility of producing yellowcake from the Beverley sedimentary uranium deposit located near Lake Frome. All of the available drillhole data for this deposit was examined and...-
Document
-
The Curnamona North Project. Joint annual reports and joint final report to the majority of licences' joint full surrender, for the period 16/7/2007 to 29/10/2015. EL 5322 final report to 15/7/2017.
A large, 3370 square km area of the Strzelecki Desert lying over and to the south-east of Lake Callabonna, and extending as far as the SA-NSW State Border, is being explored for possible economic buried sedimentary uranium mineralisation thought to...-
Document
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona Project (uranium exploration spinoff). Joint annual reports for the period 1/1/2009 to 31/12/2011.
During the fifth year of the Curnamona - Uranium Project JV, during the 2009 calendar year, Curnamona Energy drilled a total of 124 holes for an aggregate depth of 11,777 m on EL 4262 (including RL 123). The drilling tested “blanket sands” at Oban...-
Document