-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Lake Gregory. Final report at licence full surrender, for the period 13/5/2016 to 9/3/2017.
A licence area covering a large salt lake (Lake Gregory) of the Cenozoic Lake Eyre Basin, and the underlying Mesozoic Eromanga Basin sediments situated to the north of the uranium-rich Mount Babbage and Mount Painter inliers, ~120 km north-east of...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Welbourn Hill. Progress reports and final report to licence expiry/full surrender, for the period 11/4/1991 to 10/4/1993.
Exploration for possible buried Olympic Dam (Cu-Au-U) style mineralisation, undertaken in the Welbourn Hill area by Newmont Australia Limited through its subsidiary Newcrest Mining, initially comprised the acquisition of ground magnetic, gravity and...-
Document
-
RB 00803 Assessment of the hydrogeology of the southern Frome Embayment with particular respect to possible exploitation of uranium deposits.
A study of the hydrogeology of the southern Frome Embayment has been carried out to assess any possible effects upon groundwater of exploitation of uranium deposits in the area. Water quality in Tertiary palaeonchannel aquifers is unacceptable for...-
Document
Published: 31 Dec 1899
-
RB 00800 Honeymoon Deposit Uranium Leaching Project. Proposed programme for aquifer testing and groundwater pollution control.
Report gives proposals for drilling and aquifer testing investigations of the local ground water system, to establish hydraulic property baseline values prior to in-situ leaching trial tests, and outlines a series of recommended monitoring procedures...-
Document
Published: 31 Dec 1899
-
Strangways [Springs]. Annual report plus final report to licence expiry/full surrender, for the period 7/1/2011 to 6/1/2013.
An area extending along the Marree - William Creek - Oodnadatta Track, some distance to the west of Lake Eyre South and centred 140 km north of Olympic Dam, has been explored for possible economic buried Mesozoic sandstone-hosted (Kazakhstan style)...-
Document
-
RB 2003/00021 Musgrave Province - Geological summary and exploration history.
The Musgrave Province is largely incorporated within the Anangu Pitjantjatjara Lands and includes cratonic crystalline middle Proterozoic basement rocks of the Musgrave Province proper, as well as mantling younger sedimentary rock successions...-
Document
Published: 01 Nov 2003
-
Curnamona (part of the Siccus JV Project). Annual reports and final report to licence surrender, for the period 4/8/1997 to 7/11/2001.
Sedimentary uranium orebodies within Tertiary palaeochannels were the target of exploration in the area of the Siccus River, south of Lake Frome. Extensive research into available open file past exploration data allowed the identification of both...-
Document
-
Bingelly (part of the Bingelly JV Project). Annual reports and final report to licence surrender, for the period 30/3/1998 to 5/7/2001.
Sedimentary uranium in Tertiary palaeochannels was the target of exploration in an area 90 km east of Lake Frome, adjacent to the NSW border. Work included research and compilation of open file drilling data, compilation of structural contour maps,...-
Document
-
Lake Elder (part of Lake Elder Project). Partial surrender report for the period 21/8/1997 to 20/8/1999.
Interpretation of historical drilling data indicates that an area of the Frome Embayment located 50 km east of Lake Frome is shallowly underlain by basement, and so is unlikely to contain significant palaeochannels hosting sedimentary uranium.-
Document
-
Curnamona, Frome Downs, Billeroo Creek and Mulyungarie (the Curnamona Uranium JV Project). Joint annual reports and final report to licences' joint surrender, for the period 20/2/1997 to 19/2/2002.
Exploration for sedimentary uranium in Tertiary palaeochannels was carried out on four partly contiguous licences located immediately south and east of Lake Frome. Research of historic data, including an evaluation of the results from 309 existing...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 2013
-
Mount Clarence (part of the Coober Pedy Project). Joint annual reports, annual reports and final report to licence full surrender, for the period 23/8/2010 to 10/12/2015.
An area centred ~40 km north-west of Coober Pedy, and lying in the northern part of the Gawler Craton near the centre of the Mabel Creek Ridge crustal element and to the north of the east-trending Karari Fault Zone, has been explored for possible...-
Document
Published: 18 Dec 2015
-
Galaxy Tank (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 22/3/2006 to 10/5/2013.
Tasman Resources' ("Tasman") Central Gawler Project tenement acreage, originally comprising seven exploration licences ELs 3339 to 3345, was initially applied for on the basis of perceived prospectivity for diamonds: however, following Tasman's...-
Document
Published: 16 Jul 2013
-
Mundowdna, Wilpoorinna, Dalarinna Hill and Calcutta (the Marree Project). Combined annual reports plus final reports to licences' respective expiry or surrender, for the period 21/6/2006 to 29/5/2014.
The Marree Project consists of four adjacent exploration licences, ELs 3574, 3577, 3578 and 3579, which together cover 3909 square km. Work performed on the project was governed by the Eromanga Basin joint venture agreement made between Eromanga...-
Document
Published: 30 May 2014