-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Report on the mineral potential of the Lake Everard (SE) prospect, SML 529.
There is no abstract created for this record-
Document
Published: 01 Jan 1971
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 2018
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019
-
Data release - as updated : Mount Nott. Annual reports to licence expiry/full surrender, for the period 17/1/2012 to 16/1/2019.
An area located ~100 km north-west of Kimba, on the southern margin of the Gawler Ranges, is being explored by Investigator Resources for a variety of styles and types of precious and base metal epithermal mineralisation that may have formed in...-
Document
Published: 26 Mar 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 2018
-
Data release [made at SA Director of Mines’ discretion] : Waddikee. Annual reports to licence expiry/renewal, for the period 24/5/2005 to 23/5/2010.
An area centred ~20 km south-southwest of Kimba is being explored for possible buried Tanami style orogenic lode gold and also for Mount Isa / Broken Hill style base metals mineralisation, which could occur within reactive chemical and pelitic...-
Document
Published: 10 Aug 2010
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 2019