-
Parndana. Annual reports and final report to licence expiry/full surrender, for the period 27/10/2006 to 26/10/2008.
Exploration for possible economic stratiform/syngenetic base metal deposits and/or structurally controlled epithermal/hydrothermal gold and uranium occurrences within Lower Cambrian metasediments over the central section of Kangaroo Island included...-
Document
Published: 22 Apr 1909
-
Myponga, Yankalilla and Delamere (the Fleurieu Peninsula Project). Joint second annual report, plus final report to licences' joint full surrender, for the period 18/10/2013 to 24/9/2015.
After the granting by DSD of joint reporting status for the three licences comprising FMG's Fleurieu Peninsula IOCG exploration project, the licensee commenced formal Native Title negotiations with claimant group representatives of the Kaurna People...-
Document
Published: 13 Nov 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2006 to 28/8/2012.
Twelve licence areas owned and operated by Gold Fields Australasia (GFA), comprising two subareas respectively located approximately 50 km east of Burra and 15 km south-east of the Benda Range, on the eastern edge of the Adelaide Fold Belt, are being...-
Document
Published: 29 Sep 1912
-
The Adelaide Hills Project (now including the former Fleurieu Project tenements). Annual reports for the period 1/10/2013 to 30/11/2018 plus expiry/full surrender reports to 7/10/2023.
During the twelfth, 2013-2014 project year, work on the now combined licence holdings of the Terramin Group focussed on prospect evaluation done at Bird-in-Hand (environmental and hydrological studies), Wheal Barton and Golden Slope, plus the ongoing...-
Document
-
Angaston. Progress reports and final report to licence expiry/full surrender, for the period 11/12/1981 to 10/12/1984.
As part of a base metal exploration programme looking for possible stratabound or exhalative/hydrothermal deposits in Cambrian metasediments, which was undertaken approximately 75 km north-east of Adelaide, stream sediment sampling along the base of...-
Document
Published: 07 Mar 1985
-
Data release - as updated [made at SA Director of Mines' discretion] : Langhorne Creek, Bremer, Hartley and Currency Creek (the Fleurieu Project). Joint annual reports for the period 1/10/2008 to 30/9/2013.
In the sixth year of the project, the principal activity was the drilling of two inclined diamond holes for 633.5 m during October 2008 to investigate a possible northern buried extension of the known Rankine Trend mineralisation on EL 3641 ground...-
Document
-
Data release - as updated : Florieton. Annual reports to the commencement of project licences' joint reporting, plus final report to licence full surrender, for the period 5/11/2007 to 18/2/2015.
During initial exploration of the Florieton area, located approximately 40 km south-east of Burra, the compilation and reprocessing of available gravity and magnetic data were used to interpret the bedrock geology hidden under a widespread 150-200 m...-
Document