-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
RB 49/00001 Supplementary gravity traverses over Bungalow aeromagnetic anomaly near Cowell, Eyre Peninsula.
Supplementary gravimeter traverses have been run over the strong Bungalow aeromagnetic anomaly to further define it. Earlier in the year a percussion drilling programme was carried out over the same area. In the light of both sets of results it is...-
Document
Published: 03 Jul 1959
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Carnding. Data release made in lieu of submitting a second partial relinquishment report at licence expiry/renewal : progress reports and annual reports for the period 29/9/1994 to 16/1/2005.
Renewed brownfields gold exploration in an area situated 20-40 km north and west of the Tarcoola Goldfield, previously held in part by the licensee as EL 1848, was prompted by the May 1995 success of the Samantha/Resolute/Dominion corporate joint...-
Document
Published: 28 Jul 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-45, Old Well and New Well shear-associated gold mineral prospects. Project final report.
The Yarlbrinda and Yerda Shear Zones of the central Gawler Craton, partly present within EL 3107 in the Tarcoola-Glenloth-Lake Harris region, were the target for a number of mineral exploratory drillholes put down there by by licence farminee Minotaur...-
Document
-
Data release - as updated : Lake Gilles (part of the East Eyre [Peninsula] Project). Annual reports to licence expiry/full surrender, for the period 22/12/2005 to 28/11/2016.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. The subject area...-
Document
Published: 11 Jan 1917
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-55, Glenloth Goldfield mineral prospects. Project final report.
Historical workings at the Glenloth Goldfield were the target for 10 exploratory RC drillholes put down by Minotaur Exploration during May-June 2006 as a PACE Initiative Year 3 project. Their accepted proposal was to drill a series of RC percussion...-
Document
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 1912
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Midgee. Annual reports to licence expiry/full surrender, for the period 10/12/2009 to 9/12/2014.
A small area centred ~60 km south-west of Whyalla and ~37 km north-northeast of Cowell, which lay along the fault scarp at the edge of the western Spencer Gulf coastal plain, has been explored for both primary and secondary uranium deposits. Targets...-
Document
Published: 14 Jan 1915
-
Data release [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 17/10/2003 to 19/2/2010.
Paleoproterozoic metasediments of the Hutchison Group, and Lincoln Complex granitoids, were the targets of exploration for gold, base metals, and granite dimension stone in an area 40 km south of Kimba. In reporting year 3 for EL 2858, no field work...-
Document
Published: 04 Mar 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Cudyea. Progress reports for the period 14/2/89 to 13/11/90.
TARGET: Archaean greenstone-hosted gold, hypothermal iron and base metals, and Olympic Dam style mineralisation within an area located about 170 km north-west of Tarcoola. EXPLORATION: Regional and follow-up soil sampling (253 samples), geological...-
Document
Published: 07 Dec 1990
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 1919
-
Barney Bore. Annual reports and final report to licence full surrender, for the period 23/7/2013 to 8/3/2018.
An area located approximately 65 km south of Oodnadatta, on the Boorthanna Plain near Peake Creek, was taken up to explore for iron oxide copper gold (IOCG) or similar style mineralisation which might be hosted by basement Proterozoic rocks on the...-
Document
Published: 04 Apr 1918