-
Warrina North and Warrina South. Joint third partial relinquishment report, for the period 23/9/1996 to 22/9/2001.
Exploration for iron oxide-hosted gold and base metals over a wide area spreading NW-SE, north-east from Coober Pedy and near Lake Cadibarrawirracanna, was initially by review of historical data and interpretation of airborne geophysical data. A...-
Document
-
Gilles Downs. Progress reports to licence expiry/renewal (as part of a larger area), for the period 12/3/1979 to 11/3/1981.
Ongoing diamond exploration by Stockdale over the PORT AUGUSTA 1:250,000 mapsheet area has concentrated on country to the east and south-east of Lake Gilles, where some microdiamonds and kimberlitic indicator minerals were discovered during the period...-
Document
Published: 18 Mar 1981
-
RB 2006/00021 Tectonics of the southeastern Gawler Craton, South Australia: A field guide to the Palaeoproterozoic gneisses of Corny Point, Yorke Peninsula
This field guide presents an introduction to the geology and tectonics of the south-eastern Gawler Craton, particularly as observed at the Corny Point locality. Topics covered include the detrital zircon age distributions within the Corny Point...-
Document
Published: 01 Dec 2006
-
RB 2017/00046 Koongawa Grey dimension stone deposit geological investigations: evaluation of gneiss on ML 6426 for use as dimension stone.
The Resource Assessment and Advice (RAA) team of the Geological Survey of South Australia (GSSA) was approached by John Chesini of Chesini House Pty Ltd to provide feedback as to the suitability of stone within Mining Lease (ML) 6426 for the purpose...-
Document
Published: 01 Feb 2018
-
Tumby Bay. Progress and final reports for the period 20/11/1969 to 19/11/1971.
Exploration conducted primarily for base metals, over an area extending for 5-50 km north of Port Lincoln, has consisted of reconnaissance and detailed stream sediment surveys followed by soil and rock chip sampling, plus limited geological mapping....-
Document
-
Venus Bay. Annual reports and final report to licence full surrender, for the period 27/7/1994 to 21/12/1998.
Diamonds and base and precious metal exploration undertaken north-east of Port Kenny on western Eyre Peninsula comprised loam sampling for kimberlite indicator minerals, RC drilling (7 vertical holes, total 470 m), plus bedrock petrological, heavy...-
Document
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
Data release - as updated [made at SA Director of Mines’ discretion] : Pernatty [Station]. Annual reports for the period 29/11/2005 to 28/11/2009.
An area centred approximately 110 km north of Port Augusta, covering part of the Pernatty Ridge plateau on the south-western side of Lake Torrens, approximately 145 km south-east of the Olympic Dam mine, was taken up to explore for possible economic...-
Document
Published: 24 May 2010
-
Francis Swamp and Margaret Creek (part of the Billa Kalina G2 Diamond Project). Data release made upon the full surrender of subsequent licences: annual reports and combined annual reports to licences' joint renewal, 13/10/2000 to 12/10/2005.
Exploration for possible commercial diamond deposits has been carried out along a portion of the G2 gravity lineament located immediately south of William Creek and the southern Peake and Denison Ranges, looking for inferred diamondiferous kimberlite...-
Document
Published: 06 Jun 2007
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-14, Pernatty Lagoon area (eastern Gawler Craton) IOCG mineral prospects. Project final report.
PACE proposal DPY3-14 aimed to discover a new iron oxide - associated copper-gold (IOCG) mineralised magmatic centre, similar to the Olympic Dam setting, within the eastern margin of the Gawler Craton. The Pernatty Lagoon project is located less than...-
Document
Published: 20 Sep 2006
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 2012