-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 1921
-
Data release - as updated [made at SA Director of Mines' discretion] : The North-western Murray Basin Project. Joint annual reports for the period 29/8/2006 to 28/8/2012.
Twelve licence areas owned and operated by Gold Fields Australasia (GFA), comprising two subareas respectively located approximately 50 km east of Burra and 15 km south-east of the Benda Range, on the eastern edge of the Adelaide Fold Belt, are being...-
Document
Published: 29 Sep 1912
-
Manna Hill. Progress report to licence expiry/full surrender, for the period 21/10/1971 to 20/10/1972.
To test interesting VLF EM anomalies that had been recorded over some of the Manna Hill Goldfield workings in May 1971, under Elvire's tenure of a prior SML 479, two vertical percussion holes for a combined total penetration of 375 feet were drilled,...-
Document
-
Granville - Oladdie area. Progress reports and final report to licence expiry/full surrender, for the period 16/4/1970 to 15/4/1971.
Continuing investigation of the stratabound copper and manganese potential of the Granville district consisted of stream sediment sampling, ground magnetic traverses over an atypically aligned aeromagnetic anomaly, and shallow percussion drilling of...-
Document
-
Price. Progress reports to licence expiry/renewal, for the period 24/2/1975 to 23/2/1977.
In continuing regional exploration conducted over north-eastern Yorke Peninsula, further reconnaissance stratigraphic drilling and wireline geophysical logging (in 3 vertical rotary percussion holes totalling 373 m) was carried out in May 1976 to test...-
Document
-
Eurelia - Carrieton area. Progress reports to licence expiry/renewal for the period 27/5/1974 to 26/5/1976.
Continuing exploration for economic stratiform copper occurrences in the Carrieton area has involved considerable further drilling (69 rotary drag bit holes for a total of 2864 m, 19 percussion / precollar cased holes for a total of 2381 m, and 6...-
Document
-
ExpNotes PARACHILNA (v2): Explanatory Notes PARACHILNA (second edition, 1999)
The PARACHILNA map area (31 to 32°S, 138 to 139.5°E) occupies the central Flinders Ranges which are made up of folded, mostly marine sedimentary Neoproterozoic and Cambrian rocks of the Adelaide Geosyncline, and adjoining plains underlain by Cainozoic...-
Document
-
SP 008 Mineral Resources of the Adelaide Geosyncline
This publication has been compiled from a display prepared for the launch of SADME Bulletin 53, held at the Australian Mineral Foundation on 7 December 1987. The importance and diversity of commodities found in the Geosyncline are highlighted in the...-
Document
-
Methuen Hill. Annual reports and final report to licence expiry/full surrender, for the period 4/3/2005 to 3/3/2010.
Exploration of a small licence area located east of Nackara township has targeted possible buried economic stratabound copper deposits in altered Adelaidean metasediments, and also any Telfer-style gold occurrences in these same rocks. Over about half...-
Document
Published: 13 Jun 1912
-
Data release [made at SA Director of Mines’ discretion] : Teetulpa Goldfield. Combined annual, annual and progress reports, plus related technical consultants' reports, submitted until licence renewal/re-issue, for the period 24/11/1995 to 14/11/2006.
An area surrounding and extending to the south of the Teetulpa Goldfield, which is centred about 60 km west of Olary and 31 km north of Yunta, was taken up primarily to try to find the source for the significant (>100,000 ounces so far recovered)...-
Document
Published: 05 Jun 1906
-
Anabama North. Data release made at licence expiry/renewal : annual reports submitted until the commencement of the Anabama JV Project licences' joint reporting, for the period 11/1/2001 to 30/4/2008.
An area centred ~50 km south-east of Manna Hill township on the Barrier Highway has been taken up to explore for possible economic buried epithermal, VHMS style copper-gold or other base and precious metal mineralisation which could have formed within...-
Document
Published: 11 Nov 1908
-
Data release [made at SA Director of Mines' discretion] : Burra Hill (part of the Burra South Project). Annual reports submitted until the commencement of project licences' joint reporting, for the period 1/5/2006 to 30/4/2009.
Within a small licence area centred about 15 km south-south-east of Burra township in the northern Mount Lofty Ranges, Copper Range initially targeted near-surface copper oxide mineralisation associated with an altered and brecciated contact zone...-
Document
-
Mongolata. Third partial surrender report, for the period 13/2/2004 to 9/3/2014.
Exploration for copper and gold mineralisation within a now wholly relinquished 213 square km licence eastern sub-block, located 18-30 km north-east of Burra, has utilised geochemical and geophysical methods to assess the potential of buried...-
Document
-
Prince Alfred mine. Progress reports and annual reports to licence full surrender, for the period 9/4/1998 to 24/6/2001.
Exploration in an area around the historic Prince Alfred mine consisted mainly of detailed geological mapping and compilation of data derived from comprehensive literature searches, together with processing and interpretation of available geophysical...-
Document
Published: 16 Jun 1901
-
Mount Denison (part of the BHP Billiton - Rio Tinto - Phelps Dodge' Peake and Denison Joint Venture Project). First partial surrender report, for the period 12/7/1993 to 16/9/2003.
Exploration carried out over the northern Peake and Denison Ranges since 1993 has targeted possible large-scale Proterozoic iron oxide associated copper-gold (IOCG) deposits considered to have formed in stratigraphic/structural settings similar to...-
Document
-
Anabama Hill. Progress reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1970.
After its initial stream sediment sampling and rock chip sampling had revealed that significant base metal anomalism (Mo to 600 ppm and Cu to 300 ppm) exists on and near granitic rock outcrops at Anabama Hill, Asarco undertook detailed 1:1200 scale...-
Document
-
RB 2021/00016 Delamerian Orogen mineral potential mapping : the Cu-Mo-Au mineral system. Interim report.
A mineral systems analysis for Cu-Mo-Au in the Delamerian Orogen has been conducted to assess the orogen's potential for containing this type of mineral occurrence. A conceptual model was delineated, and prospectivity maps were created. These maps can...-
Document
Published: 01 Nov 2021