-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Waddikee Rocks and Corrobinnie (part of the Eyre Peninsula Project). Joint second and sixth respectively partial surrenders report, for the overall period 17/10/1996 to 11/7/2016.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling,...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Sheringa. Annual reports for the period 16/12/2006 to 31/3/2019.
No field work was done on the subject renewed EL 5455 during Years 11 through 15. Geophysical data were further assessed with a view to selecting possible future drill targets.-
Document
-
Caralue. Information status at licence surrender, for the period 1/12/2014 to 24/12/2015: no work performed.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 5/3/2010 to 4/3/2019.
No field work took place on EL 4231 during 2010-2011. Activities undertaken by Lymex during the reporting period have comprised reviewing all past calcrete sampling geochemical data in conjunction with continuing compilation of other relevant...-
Document
-
Data release - as updated : Brooker (part of the Brimpton Lake Project). Annual reports to licence expiry/full surrender, for the period 12/6/2003 to 24/8/2018.
Exploration Licence 3096 “Brooker” covering an area of 682 square km lies east of Elliston on the Eyre Peninsula in South Australia. It is one of three adjacent tenements that form the “Brimpton Lake Project”; the other two are EL 2662 (initially...-
Document
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Warramboo (part of the Eyre Peninsula Project). Diamond exploration farminee's final report for the period July 1997 to 31/10/1998.
Investigations of the likely diamond potential of a part of the central Eyre Peninsula were conducted under a farm-in joint venture agreement which was in place for about fifteen months. Work comprised the collection of six drill cuttings bulk...-
Document
-
Data release [made at SA Director of Mines' discretion] : Thurlga. First annual report for the period 28/11/2014 to 27/11/2015.
A large area of the southern Gawler Ranges comprising two separate sub-blocks has been taken up to allow Menninnie Metals to conduct further regional exploration to try to delineate structurally controlled hydrothermal Ag-Zn-Pb and epithermal...-
Document
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Coulta. Progress reports and annual report to licence expiry/full surrender for the period 23/2/1978 to 22/3/1979.
Exploration for possible economic vein-style primary uranium deposits hosted within basement rocks in a licence area located 55 km west-northwest of Port Lincoln has consisted of detailed (1:10,000 scale) geological mapping over a 650 square km area,...-
Document
-
ComRev 008 Iron Ore in South Australia 2000
The iron-rich rocks of South Australia have been classified into six deposit types - residual, chemical sedimentary iron formations, Fe-skarn and, of lesser significance, hydrothermal, clastic and magmatic. Production has been overwhelmingly from...-
Document
-
ComRev 016 Iron Ore opportunities in South Australia 2014 (historical reference only)
A 2016 summary of iron ore opportunities within South Australia. Each mine, deposit or prospect has detailed resource information and a snap-shot of the associated companies at that time.-
Document
-
ComRev 015 The South Australian Resources Sector 2016 (historical reference only)
Gold: Gold mineralisation is widespread in South Australia and occurs in most geological provinces Copper: Many of the deposits in South Australia’s copper provinces are covered by a sequence of younger rocks that have effectively hidden many large...-
Document