Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
RB 93/00004 Tarcoola - Tallaringa bedrock drilling 1991. Summary.
Archaean and Early and Middle Proterozoic rocks of the north-western Gawler Craton have features which suggest good prospectivity for base metals, precious metals and other commodities. However, outcrop is poor and there has been relatively little...-
Document
Published: 01 Feb 1993
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 1 of 2 - a very long abstract is split between these two parts].
Exploration of a long-held tenement package in the northern Gawler Craton was directed primarily at gold and also at platinum group metals, in specific work programmes executed under separate early joint venture arrangements made with Gawler Gold and...-
Document
Published: 10 Jan 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-56, northern Olympic Domain: Sloane Hill silver and IOCG mineral prospect. Project final report.
A PACE Initiative Year 4 subsidised drilling project carried out on Mount Eba Station, in an area located approximately 30 km south of the Prominent Hill mine, initially targeted a wide above background silver geochemical anomaly returned by sampling...-
Document
Published: 18 Dec 1907
-
Aurora Tank. Annual reports and final report to licence expiry/full surrender, for the period 26/3/1998 to 3/8/2006.
Exploration for Challenger - style vein gold deposits within concealed Archaean basement has been carried out in two licence subareas located on the northern part of the Commonwealth Hill pastoral lease, under a joint venture between the principal...-
Document
Published: 31 Jul 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 2 of 2 - a very long abstract is split between these two parts].
Abstract (Continued from Part 1): Because of the presence of the highest gold concentration at the eastern end of the Target 14 aircore drill traverse, potential remains for delineating further mineralisation at this locality. In addition, the...-
Document
Published: 10 Jan 1907
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Moreenia. Annual reports and final report to licence full surrender, for the period 6/3/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments and soils targeted possible Thompson Belt type ultramafic-hosted nickel-copper and precious metal mineralisation that may have been intruded within a sequence of Lower Proterozoic Hutchison...-
Document
-
Koppio. Annual reports and final report to licence full surrender, for the period 6/1/1995 to 7/4/1997.
Geochemical sampling of ferruginous lag, stream sediments, BLEG soils, and rock chips, targeted possible Thompson Belt - type nickel-copper and precious metal mineralisation hosted by Lower Proterozoic Hutchison Group metasediments in an area 40 km...-
Document
-
Poochera. Annual reports to licence full surrender, for the period 8/1/1996 to 15/1/2000.
As part of a search for structurally related Ernest Henry - style Cu-Au mineralisation and other possible polymetallic deposits, analysis of aeromagnetic data obtained from an area 60-100 km east to north-east of Streaky Bay indicated the presence of...-
Document
-
Unalla Hill, Moonaree and South Lake Gairdner (Lake Gairdner Project). Annual and final reports for the period 25/10/96 to 24/10/99.
Exploration targeted Olympic Dam style mineralisation associated with Hiltaba Suite intrusives and Gawler Range Volcanics at the southern end of Lake Gairdner, between Mount Ive and Moonaree. Sampling of poorly developed calcrete together with rock...-
Document
Published: 02 Dec 1998