Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial surrender: Southern Gold gold exploration JV - specific annual reports 6/2/2006 to 30/6/2009. [Index Part 2 of 2].
After the Southern Gold joint venture agreement was signed in February 2006, that company as JV operator performed a due diligence review of Dominion Mining's exploration data, did some orientation soil calcrete and biogeochemical sampling at Typhoon...-
Document
Published: 02 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-46, Coober Pedy Ridge southern margin (Robin Rise Project) IOCG mineral prospects. Project final report.
The approved PACE Initiative Theme 2 drilling proposal DPY3-46 was specifically designed to test for haematite-dominant iron oxide - associated copper-gold (IOCG) mineralisation in an area of the northern Gawler Craton where little past exploration...-
Document
Published: 07 May 1907
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Sandstone Outstation. Annual reports to licence expiry/full surrender, for the period 22/11/1996 to 17/1/2006.
A collection of eight land parcels recently relinquished from the Resolute Resources / Dominion Mining JV EL 2018, and covering 215 square km in an area located approximately 110 km south-west of Coober Pedy, was taken up by a new consortium intending...-
Document
Published: 28 Feb 1906
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
McDouall Peak. Partial surrender reports, for the period 8/10/2012 to 7/10/2020.
Within a licence area which is centred ~100 km south-southeast of Coober Pedy, holder Quasar Resources’ primary exploration target is concealed basement-hosted IOCG style mineralisation similar to that existing at the Prominent Hill and Carrapateena...-
Document
Published: 02 May 1918
-
Bulgunnia Station (part of the Titan Base-Precious Metals Project). First annual report, plus final report to licence full surrender, for the period 10/4/2015 to 18/10/2016.
An area centred ~120 km south-west of Coober Pedy has been explored for possible economic buried gold and base metals mineralisation that may have formed within Proterozoic and older basement rocks. Mostly these are covered by the younger Jurassic...-
Document
Published: 15 Nov 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Isthmus. Annual reports for the period 19/4/2010 to 18/4/2013.
An attenuated NE trending licence area consisting of five separate small sub-blocks centred approximately 130 km north-west of Tarcoola is being explored for possible economic buried Challenger style gold deposits and for other base and precious...-
Document
Published: 03 Jul 1913
-
Mount Igy. Annual reports submitted until the commencement of licence joint reporting for the Tallaringa JV ELs, for the period 18/1/2006 to 17/1/2009.
An area centred ~150 km WSW of Coober Pedy has been explored for possible buried economic sandstone-hosted secondary uranium deposits which might have formed within northeastwards-draining tributaries of the Tertiary Tallaringa Palaeochannel. Another,...-
Document
Published: 23 Apr 1909
-
Carnes Homestead (part of the Woomera Project). Information status at licence surrender, for the period 31/8/2012 to 11/2/2016: no work performed.
There is no abstract created for this record-
Document
-
Lyons [Siding] (part of the Woomera Project). Information status at licence surrender, for the period 31/8/2012 to 11/2/2016: no work performed.
There is no abstract created for this record-
Document
-
Malbooma [Siding] (part of the Woomera Project). Information status at licence surrender, for the period 31/8/2012 to 11/2/2016: no work performed.
There is no abstract created for this record-
Document
-
Coober Pedy Project. Annual reports, joint annual reports, and final reports at individual licences' full surrender, for the period 4/4/2011 to 3/4/2015.
Five separate areas located in the northern Gawler Craton adjacent to the Mount Woods Domain, which to date have received only minor attention from mineral explorers and so have had limited drilling done, have been explored for possible buried...-
Document
Published: 15 Apr 1915
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Lake Woorong. First partial surrender report, for the period 8/6/2012 to 7/6/2015.
An area centred about 80 km south-west of Coober Pedy is being explored for possible economic buried coal seams in Permian strata and for economic iron ore deposits or massive sulphide base metal mineralisation (copper, nickel) that may have formed...-
Document
-
Data release - as updated : Tallaringa South-east - National Trig Point area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 29/11/2012 to 28/11/2020.
Since late November 2012, a number of areas in the northern central Gawler Craton and eastern Musgrave Province have been taken up by Woomera Exploration Limited (WEX), an unlisted public company, for the purpose of minerals exploration. Within the...-
Document
Published: 01 Feb 1921