-
TEISA Coober Pedy Drilling Project.
There is no abstract created for this record-
Document
-
Hanns Hill. Progress reports for the period 19/1/81 to 6/12/82.
Follow up to stream sediment sampling near Oodnadatta in the Mount Dutton area suggests that anomalous nickel, chromium and cobalt values are associated with ironstone, and anomalous niobium with geodes. No kimberlites were discovered.-
Document
Published: 01 Jan 1982
-
Mount Robinson. Progress reports for the period 19/1/81 to 6/12/82.
Stream sediment sampling southeast of Oodnadatta in the Mount Kingston area revealed no significant anomalies. Rare pyrope was identified in some samples, but no kimberlite were discovered.-
Document
Published: 01 Jan 1982
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Eaglehawk Dam (part of the Woodmurra Project). Combined first annual/final report to licence expiry/full surrender, for the period 25/11/2015 to 24/11/2016.
An area centred ~70 km south-east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-09 - Margaret Dam, southern margin, Peake and Denison Inliers, kimberlite diamond prospect. Drilling project final report.
Monax Alliance's Margaret Dam Project is located on their EL 5347 Francis Creek, which is centred approximately 40 km south of William Creek in northern South Australia. The initial project work done for licence operator Monax Mining by geophysical...-
Document
-
Wintinna. Annual report for the period 8/8/97 to 7/8/98.
Reinterpretation of existing aeromagnetic and gravity data from an area 70 km northwest of Oodnadatta indicated moderate potential for basement mineralisation and kimberlitic intrusions.-
Document
Published: 10 Aug 1998
-
Algebuckina. Annual reports to licence expiry/full surrender, for the period 3/8/2008 to 28/9/2014.
The only field work undertaken by Red Metal during its final six years of tenure of EL 3226/4307 Algebuckina was the assaying in 2011 of 88 soil and rock chip samples which it had collected from the vicinity of historically reported surface copper...-
Document
Published: 01 Oct 1914
-
Francis Swamp. Combined first and second annual reports/final report to licence expiry/full surrender, for the period 9/10/2013 to 8/10/2015.
An area believed to cover the concealed southern margin of the Peake and Denison Domain of the Northern Gawler Craton was taken up by the Monax-Antofagasta copper exploration consortium to explore for possible buried economic iron-oxide associated...-
Document
Published: 24 Nov 1915
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Umbum. Second partial surrender report, for the period 30/7/1985 to 29/1/1987.
As part of a regional search for possible economic base and precious metal mineralisation that may be present within buried Proterozoic basement rocks, work completed within the now relinquished portions of the licence consisted initially of the...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 1921
-
Todmorden (part of the Mount Sarah Project). Final report to licence expiry/full surrender, for the period 8/3/2018 to 7/3/2020.
An area located immediately west of Mount Alice on Todmorden Station has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo to Mesoproterozoic rocks like those hosting IOCG deposits...-
Document
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917