Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
RB 81/00002 Petrographic descriptions of Willyama Complex rocks and Umberatana Group metasediments, northern Outalpa Inlier, Olary Province.
Petrology of 174 rocks indicate that 5 deformation phases (D1 - D5) are present within this dominantly schistose domain. Describes many samples which contain gneissosity, schistosity or crenulation.-
Document
Published: 01 Aug 1980
-
RB 77/00056 Willyama Complex excursion, 27th March to 7th April, 1977.
There is no abstract created for this record-
Document
Published: 01 Jan 1977
-
RB 82/00056 Interpretation of regional geophysical data in the Olary region, South Australia.
Gravity and detailed aeromagnetic data, as summarised in the Metallic Exploration Index Series for CURNAMONA and OLARY, are interpreted. Other detailed geophysical and geological work is incorporated. The interpretation aims to define the areal...-
Document
Published: 01 Sep 1986
-
Outalpa Hill. Data release made upon the full surrender of a subsequent licence : progress reports to licence expiry, for the period 15/7/1988 to 8/8/1994.
Exploration for possible economic gold occurrences in an area surrounding Outalpa Hill in the Olary Ranges, 25 km north of Manna Hill township, has been conducted initially by a private prospecting syndicate with the assistance of industry...-
Document
-
Macdonald Hill. Progress and final reports for the period 8/5/84 to 20/3/85.
The exploration target in an area located 20 km east-northeast of Olary was economic gold mineralization within Early Proterozoic ironstone and pyritic lode horizons. Drilling results and samples from previous work in the Green and Gold and Wilkins...-
Document
-
Weekeroo Hill. Progress reports and final report to licence full surrender, for the period 18/4/1974 to 21/12/1974.
In a search for possible economic epithermal / stratiform / metamorphic base metals and gold within the Weekeroo Inlier, detailed geological mapping, rock chip sampling and an office evaluation of previous exploration were carried out for the Weekeroo...-
Document
-
Peaked Hill [formerly Trinity mine area]. Progress reports and final report to licence expiry/full surrender, for the period 27/7/1981 to 26/7/1983.
Ongoing exploratory RAB bedrock drilling of 302 shallow holes totalling 1919 m, over an area located approximately 40 km south-east of Olary, has shown that the Pegline Dam prospect is not base metal mineralised, and that the source of an IP anomaly...-
Document
-
Macdonald Hill. Progress reports for the period 24/2/84 to 23/2/86.
Exploration was undertaken north north-east of Olary for possible near-surface gold associated with Early Proterozoic quartz - magnetite - pyrite lode horizons, and with Adelaidean fluvial tillites and siltstones of the Umberatana Group. It included...-
Document
-
Report on diamond drilling programme at Dome Rock copper prospect, SA.
Exploratory diamond drilling (3 holes, total 2061 feet) of good geochemical/IP anomalies lying along strike under the old Dome Rock copper mine workings failed to encounter economic copper or other mineralisation, with narrow (2-3 feet wide) and...-
Document
-
Ethiudna Hill. Progress, partial surrender and final reports to licence expiry for the period 1/11/1974 to 31/10/1975.
Exploration for possible economic stratabound / stratiform copper deposits in an area of the central Olary Province has targeted existing prospects where recent previous work had only addressed the uranium potential. Inco's investigation of...-
Document
-
ExpNotes OLARY: Explanatory Notes OLARY
There is no abstract created for this record-