-
Arcoona. First partial surrender report, for the period 30/7/2019 to 25/7/2022.
The licence area is located immediately south and east of Woomera along the eastern margin of the Gawler Craton, within the prospective Olympic Dam IOCG Province. The area is considered prospective for deep IOCG mineralisation, as well as for...-
Document
Published: 23 Sep 2022
-
EL 6354 - Warnes area. EL 6354 Annual technical reports for the period ending 24/06/2024.
Exploration Licence 6354 “Bendigo” covers an area of 490 square km and is located on the eastern Adelaide Fold Belt on the margins of the Murray Basin north-northeast of Burra. The area is considered prospective for both copper and gold with historic...-
Document
Published: 02 Jul 2024
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 2001
-
Manguri (part of the Mount Woods Joint Venture Project). Second partial surrender report for the period 13/12/1999 to 13/3/2006.
Within the relinquished licence area, no geophysical anomalies were recognised within deeply buried Proterozoic basement that might represent possible craton margin magmatic nickel or IOCG type exploration targets. A review of previous exploration...-
Document
Published: 04 Oct 2006
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-56, northern Olympic Domain: Sloane Hill silver and IOCG mineral prospect. Project final report.
A PACE Initiative Year 4 subsidised drilling project carried out on Mount Eba Station, in an area located approximately 30 km south of the Prominent Hill mine, initially targeted a wide above background silver geochemical anomaly returned by sampling...-
Document
Published: 18 Dec 2007
-
Thurlga. Information status at licence surrender, for the period 24/10/2012 to 17/10/2013 : no work performed.
There is no abstract created for this record-
Document
Published: 06 Dec 2013
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 2019
-
Iron Baron. First partial surrender report at licence renewal, for the period 4/4/2011 to 3/4/2018.
An attenuated licence area centred ~80 km south-west of Port Augusta is being explored for possible buried IOCG-U mineralisation and shear-hosted uranium deposits that may be associated with parts of the Roopena Fault and the Kalinjala Mylonite Zone....-
Document
Published: 31 Jul 2018
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 2010
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 2018
-
Lake Gilles district (the Barna Joint Venture). Annual reports to licence full surrender, for the period 15/3/1993 to 12/7/2000.
Exploration of mainly buried Proterozoic metasedimentary bedrock for possible Broken Hill type Pb-Zn-Ag mineralisation and for Olympic Dam type Cu-Au mineralisation has been performed over two separate areas located 25 km north-east and 50 km east of...-
Document
Published: 11 Aug 2000
-
Cultana. Annual reports to licence expiry/full surrender, for the period 13/9/2012 to 12/9/2017.
An area centred ~50 km south-west of Port Augusta has been explored for possible economic buried VHMS or porphyry style copper mineralisation and for primary uranium mineralisation hosted by basement rocks within this part of the southern portion of...-
Document
Published: 28 Nov 2017
-
Wompinie (part of the Drew Hill Joint Venture Project). Progress and annual reports plus final report to licence expiry/full surrender, for the period 24/11/1995 to 5/12/2008.
Exploration for Kalkaroo or Portia style copper-gold deposits, and for Broken Hill type stratiform lead-zinc-silver deposits, both possibly formed within the Palaeoproterozoic basement intrusive rocks and high grade metasediments in an area lying...-
Document
Published: 14 May 2009
-
Central Gawler Gold Province Prospect Scale. Final report, Project ADI RD03-419 [Accelerated Discovery Initiative Round 3, 2022]. CSAMT and Loupe TEM Survey Method Assessment Report, February 2023.
Lady Alice Mines was successful in receiving funding in the third round of The Accelerated Discovery Initiative (ADI). This funding was provided to allow for the assessment of Controlled Source Audio-Magnetotellurics (CSAMT) and Loupe TEM ground...-
Document
Published: 28 Feb 2023
-
Tarcoola. Final report, Exploration Drilling and Geophysical Component. Project ADI RD02-300 [Accelerated Discovery Initiative Round 2, 2022].
The final report for the Accelerated Discovery Initiative Round 2 is reported in two parts: a geophysical component and an exploration drilling component. Barton Gold Holdings Ltd (Barton), through its wholly own subsidiary Tarcoola 2 Pty Ltd,...-
Document
Published: 31 Aug 2022
-
Winnininnie (part of the Manna Hill Project). Final report at licence expiry/full surrender, for the period 19/4/2013 to 18/4/2015.
A small area centred ~14 km north-east of Yunta that straddles the Barrier Highway has been explored for possible economic vein-style and structurally controlled gold which may have formed within Adelaidean bedrock sediments. During the 2013-2014...-
Document
Published: 02 Jul 2015
-
Data release [made at SA Director of Mines' discretion] : Algebuckina. Annual reports for the period 3/8/2004 to 2/8/2008.
An area surrounding the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, is being explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 20 Oct 2008
-
Baratta. Annual reports plus final report to licence full surrender, for the period 27/4/2010 to 20/6/2014.
A small, 61 square km area centred ~40 km east-southeast of Hawker and ~60 km north-west of Yunta has been explored for possible buried primary and secondary process formed, structurally controlled gold occurrences, as well as for diapir-related...-
Document
Published: 20 Jun 2014
-
Commonwealth Hill. Annual reports to licence expiry/non-renewal, for the period 9/8/2012 to 8/8/2017.
An area centred ~20 km north of the Challenger gold mine has been explored for possible buried primary Challenger type basement gold lodes and also for secondary roll-front style uranium mineralisation that may be hosted in buried Tertiary fluvial...-
Document
Published: 14 Nov 2015
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 2021