-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
RB 86/00005 Mineral production statistics. Six months period ended 30/6/1985.
There is no abstract created for this record-
Document
Published: 01 Jan 1986
-
RB 93/00017 Physical properties of South Australian building stones.
A program of testing of physical properties of South Australian building stones has been carried out on 30 samples representing: - Seven granite samples from four localities - One marble sample - Thirteen slate and flagstone samples from nine...-
Document
Published: 01 Mar 1993
-
RB 96/00011 Assessment of the Tertiary sand aquifer, County Musgrave Proclaimed Wells Area, Eyre Peninsula.
The groundwater resources of the Tertiary sand aquifer in the County Musgrave Proclaimed Wells Area (PWA) have been reviewed in order to assess the potential for their use to augment groundwater currently extracted from the unconfined Quaternary...-
Document
Published: 01 Apr 1996
-
RB 98/00025 Hydrochemistry of groundwaters in the South Australian-Victorian Designated Area - Groundwater Border Agreement Act.
Hydrochemical data from a total of 165 bores along the 40 kilometre wide strip of the South Australian - Victorian Border Designated Area were used to provide a spatial, and temporal, hydrochemical framework of the groundwaters from the three main...-
Document
Published: 01 Jun 1998
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-01, Central Eyre Peninsula (Karkarook area) Mesoproterozoic unconformity - style sedimentary uranium mineral prospects. Project interim and final reports.
Investigation of the potential of a known surface radiometrically-anomalous area 20 km west-southwest of Cleve to contain unconformity - style uranium mineralisation, inferred to occur at and just above the subsurface stratigraphic contact of...-
Document
Published: 31 Mar 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
Hawker. Final report at licence expiry/full surrender for the period 2/7/2007 to 1/7/2009.
Copper Range has targeted several different styles of base metal mineralisation within the Chace Range district. Initially its focus was on sediment (sandstone)- hosted copper deposits, with exploration being confined to reconnaissance field visits to...-
Document
Published: 22 Jun 1909
-
Hawker. First partial surrender report for the period 2/7/2007 to 1/7/2008.
Exploration of the outcropping Proterozoic/Cambrian stratigraphic boundary in the Chace Range region of the southern Flinders Ranges, in one licence subarea taken out close to Hawker and another a short distance to the north-east, targeted possible...-
Document
Published: 18 Dec 1908
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Data release - as updated [made at SA Director of Mines’ discretion] : Arkaroola. Annual reports for the period 5/12/2008 to 3/12/2015.
During the 2008-2009 licence year, most of the new work done consisted of appraisal rotary mud drilling at Four Mile East (112 holes for 24,460 m) and Four Mile West (113 holes for 19,120 m), with the addition of one NQ diamond cored hole (AKC093) for...-
Document
Published: 20 Jan 1916
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-06 - Intercept Hill, Stuart Shelf, Mesoproterozoic IOCGU mineral prospects. Drilling project final report.
EL 5372 Intercept Hill is centrally located in the world class Olympic Dam Iron Oxide Cu-Au-U Province, at the centre of a cluster of iron oxide copper occurrences including Emmie Bluff, Oak Dam and Winjabbie. The Intercept Hill area has available...-
Document
Published: 19 Jan 1916
-
Natural building stones of South Australia. Progress reports 1 to 14 for the period July 1975 to September 1989.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
A preliminary assessment of the Four Mile uranium prospect.
In June 2005, Lindsay Curtis was engaged by Quasar Resources and Alliance Development to prepare an expert preliminary report on the prospectivity of the so-called "Beverley 4-Mile" sedimentary uranium mineralisation occurrence, which the joint...-
Document