Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
RB 36/00077 Leigh Creek Coalfield. North Field, Lobe C.
Coal has been proved at Lobe C to a depth of 220 feet of overburden in an arcuate area along the southern and western margins of the basin. Within the suggested open cut area the coal seam averages 35 feet in thickness, has a weighted average ash...-
Document
Published: 26 Oct 1953
-
RB 37/00028 Leigh Creek Coalfield: Report on exploration of the north-eastern margin - Telford Basin area 'Telford Opencut, extension east'. (CONFIDENTIAL)
An area located on the north-eastern margin of the Telford Basin, to the east of the present extent of theTelford Open Cut mine main pit, which is known to contain potentially mineable buried coal seams, has been examined geologically and...-
Document
Published: 03 Mar 1954
-
RB 37/00068 Leigh Creek Coalfield, central area - Upper Coal Series. Report on scout drilling.
In the Triassic coal measures of Telford Basin occurring 1000 + (?) feet stratigraphically above the main (Telfod) seam are a number of coal seams - the "Upper coal series" - which further add to the opencut coal reserves at Leigh Creek Coalfield....-
Document
Published: 19 Mar 1954
-
RB 37/00157 Leigh Creek Coalfield - Exploration of the southeastern margin, Telford Basin area (Telford Main Seam eastern margin, southern extension).
The area under review is situated in the south-eastern section of Telford Basin between co-ordinates 8,000 and 34,000, and is a southern extension of the main (Telford) coal seam proved previously on the eastern margin. Coal has been proved by close...-
Document
Published: 14 Jul 1954
-
RB 78/00089;Env 02960 Appraisal drilling results, Anna Coalfield, Murray Basin, South Australia.
At the Anna Coalfield, the November 1976 appraisal drilling by SADME of 2 rotary mud, partly cored vertical boreholes with a total penetration of 159.62 m (including 28.36 m of continuous ?NQ coring over the coal-bearing section) has confirmed the...-
Document
Published: 11 May 1978
-
RB 83/00034 Underground gasification of inaccessible Leigh Creek coal measures - A preliminary evaluation of the geological structure of Telford Basin.
The Telford Basin is an asymmetrically shaped synclinal basin containing sediments of upper Triassic-Jurassic age, which cover a 25 square km area. Sub-bituminous coal occurs in three major series of seams which are informally termed the Leigh Creek...-
Document
Published: 01 Mar 1983
-
RB 96/00025 Exploration for coal in the Coober Pedy area, South Australia.
As part of the Government's South Australian Exploration Initiative (SAEI), and in support of the South Australian Steel and Energy (SASE) Project, a small coal exploration program was initiated by MESA to investigate a number of subtle magnetic lows...-
Document
Published: 01 Sep 1996
-
Update of a study of the Westfield [Coal] Deposit.
A consultancy desk study of Jan.-Feb. 1986, as updated to 1992, for the proposed development of an underground longwall mine at the Westfield coal deposit. It assesses concepts of mining technical feasibility, establishes a preliminary mine plan, and...-
Document
-
Weedina coal deposit, Arckaringa Basin. Mining proponent's submission to FEAC, including supporting geological data.
In June 1986 Cyprus Australia Coal Co., a wholly-owned subsidiary of a large American coal producer and marketer then holding exploration licences over the Weedina coal deposit in the far north of South Australia, submitted to the South Australian...-
Document
-
Proposal to the Electricity Trust of South Australia for the supply of thermal coal for power generation.
This proposal being made to ETSA, for the supply of 1.3 Mt of thermal coal per year over 25 years for electrical power generation at the new Northern Power Station currently being built at Port Augusta, is intended to allow that utility to make an...-
Document
-
NERDDC Project 590 : [ Research into the feasibility of ] Underground gasification of [ mining inaccessible ] Leigh Creek coal. Reports on field investigations and geotechnical studies.
During the first few months of 1985, field investigations were undertaken at Leigh Creek by consultants Golder Associates to provide quantitative data on the strength and permeability characteristics of the geological profile of the Main Series coal...-
Document
-
Lake Bumbunga. Progress reports to licence expiry/full surrender, for the period 30/5/1985 to 16/5/1991.
TARGET: Coal in the northern Saint Vincent Basin. EXPLORATION: Rotary open hole and core drilling plus detailed geological and geophysical logging of 24 holes on Lake Bumbunga, designed to achieve coal sampling to 500 m centres in the area lying south...-
Document
Published: 07 Apr 1991
-
Conversion of Lake Phillipson coal to fuel gases and liquids.
This report addresses processes and systems by which Lake Phillipson coal may be converted to fuel gases and liquids, sometimes with the simultaneous production of char. Published literature has been the source of all of the information. Aspects of...-
Document
Published: 14 Apr 1975
-
Results of limited quality testing on Lake Phillipson coal.
Analyst's reports presenting the results of small scale test work conducted on selected drill core samples of coal taken from the 'S' and 'T' seams in the West Basin deposit of the Lake Phillipson coal measures.-
Document
-
Port Wakefield (the Clinton Coal-to-Liquids Project). Annual reports and final report to licence expiry/full surrender, for the period 16/8/2007 to 15/8/2015.
Ground covering the known extent of three shallowly buried Eocene lignite deposits located in the Port Wakefield district was taken up to allow their delineation in tonnage and quality terms, to modern industry standards (i.e. meeting the Joint Ore...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Lock Project. Joint annual reports, for the period 22/4/2014 to 26/10/2018.
Two licences covering the undeveloped Jurassic coal measures of the Lock Coalfield have been taken up to allow initially for conducting research into the current technological and economic prospects for utilisation of the coal. Numerous samples of...-
Document
-
Lake Anthony. Quarterly reports, first joint annual report (with SML 711) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
An area located just to the east of the edge of the Nullarbor Plain, occupied by many scattered large and small salt lakes surrounded by sand dunes, with Precambrian basement [of the western Gawler Craton] subcropping near the surface, has been...-
Document
Published: 26 Jun 1973
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984