Mount Mitchell. Progress reports and final report to licence full surrender, for the period 20/10/1980 to 19/10/1982.
Exploration was undertaken for lode and alluvial tin mineralisation which might exist within ground adjacent to the abandoned Mount Mitchell tin mine, and also for reef gold in altered granite and dolerites outcropping adjacent to the numerous small...-
Document
-
Hanns Hill. Progress reports for the period 19/1/81 to 6/12/82.
Follow up to stream sediment sampling near Oodnadatta in the Mount Dutton area suggests that anomalous nickel, chromium and cobalt values are associated with ironstone, and anomalous niobium with geodes. No kimberlites were discovered.-
Document
Published: 01 Jan 1982
-
Mount Robinson. Progress reports for the period 19/1/81 to 6/12/82.
Stream sediment sampling southeast of Oodnadatta in the Mount Kingston area revealed no significant anomalies. Rare pyrope was identified in some samples, but no kimberlite were discovered.-
Document
Published: 01 Jan 1982
-
Orroroo. Progress reports to licence surrender for the period 18/11/1971 to 28/9/1972.
In a continuation of diamond and base metal exploration of newly discovered carbonatite / kimberlite intrusive bodies in an area located immediately north of Orroroo, these bodies were examined petrographically and analysed to compare their...-
Document
-
Pualco West. Progress reports and final report to licence expiry/full surrender, for the period 26/10/1972 to 25/10/1973.
Reconnaissance and detailed bulk loam sampling undertaken to look for diamonds or kimberlite indicator minerals in the vicinity of the Pualco Anticline, plus spectrographic analyses of the derived heavy mineral concentrates for gold and base metals...-
Document
Published: 12 Dec 1973
-
RB 77/00052 Regional soil sampling of the Willyama Complex, Olary area.
In a regional soil sampling survey over Willyama Complex rocks on parts of the Outalpa 1:50 000 Sheet, 2443 samples were collected at 25 metres intervals on 54 lines roughly 1km apart. These samples were analysed for CU, PB, Zn, Au, Mn, Mo, Co, Ni, V,...-
Document
Published: 01 Jan 1979
-
RB 77/00058 Geochemical appraisal of the Bunyeroo Formation, COPLEY 1:250 000 sheet.
There is no abstract created for this record-
Document
Published: 01 Jan 1979
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Calca and Poochera (the Streaky Bay Project). Data release made in lieu of submitting a first partial relinquishment report : joint annual reports for the period 22/10/2001 to 13/2/2005.
A multipart licence project area located approximately 100-150 km south-east of Ceduna is being targeted for possible Voiseys Bay type nickel, copper, cobalt and platinum group metal deposits within mafic to ultramafic basement rocks buried beneath...-
Document
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-04, Ceduna Mafic Intrusive Complex base metal sulphide mineral prospects. Project interim and final reports.
Mithril Resources have used a grant of PACE Initiative Year 2 funds to perform additional drilling on their EL 3105 located just north of Fowlers Bay. This area is regarded as being very prospective for Mid-Proterozoic mafic/ultramafic - hosted...-
Document
-
Yankaninna and Tardlapinna Well (part of the Copley Ni/Cu Project). Joint combined first annual / final report to licences' expiry/full surrender, for the period 9/10/2006 to 8/10/2008.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-42, Talia Hill area (Harris Greenstone Domain) copper-nickel and platinum group elements mineral prospects. Project final report.
In December 2005 Mithril Resources completed five RC percussion drillholes totalling 682 m on three 100 m - spaced traverses, as one of the approved PACE Initiative Year 2 subsidised drilling projects. This drilling was intended to test a surface TEM...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-32, Ki Ki intrusion mafic/ultramafic - hosted mineral prospects. Project final report.
To further investigate the Cu-Ni-PGE mineral sulphide potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, the licensee of EL 3295 sought PACE Initiative funding to complete two...-
Document
-
Black Hill Intrusive Complex (northern [Bower - Florieton] and southern [Cambrai] areas). Joint annual report plus final report to licences' joint expiry/full surrender, for the period 17/2/2005 to 16/2/2007.
Inco Resources has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation since 2004, when it signed a joint venture...-
Document
-
Weekeroo North. Progress and final reports to licence surrender for the period 1/8/1968 to 31/7/1970.
Exploration carried out by MIM to look for possible economic primary or secondary uranium deposits related to the Weekeroo Inlier of Palaeoproterozoic rocks has consisted of an airborne radiometric survey (750 line miles flown along E-W lines spaced...-
Document
Published: 31 Jul 1970
-
Frome River (part of the Copley Ni/Cu Project). Annual, partial surrender and final reports to licence expiry/full surrender, for the period 9/10/2006 to 8/10/2009.
In a search for possible Voiseys Bay style magmatic nickel-copper mineralisation within an area of historical small scale surface mining activity located approximately 60-70 km north-east of Leigh Creek, the licensee conducted a brief campaign of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document