Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Kadlongaroo Hill. Progress reports and final report to licence expiry/full surrender, for the period 11/8/1981 to 10/8/1982.
Drilling of a 196 m deep vertical diamond hole to further investigate the oil shale potential of Permian strata in the axis of the Boorthanna Trough, north of Billa Kalina Homestead, intersected only Lower Permian glacial sediments below 30 m thick...-
Document
Published: 02 Jun 1982
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 80/00116 Mesozoic stratigraphy of the Frome Embayment.
This study covers a southern lobe of the Eromanga Basin known as the Frome Embayment, which extends W-E from the Flinders Ranges to the Barrier Ranges, and southwards from the vicinity of Moolowatana Station to the Scott Hill-Mundaerno Hill region....-
Document
Published: 01 Feb 1980
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
RB 91/00052 Ruby Hill 1. Well completion report.
SADME stratigraphic drillhole Ruby Hill 1 was sited 10.4 km east of William Creek, and was designed to penetrate Early Cretaceous rocks of the Eromanga Basin and to sample pre-Mesozoic basement. It intersected 191 m of the Eromanga Basin sedimentary...-
Document
Published: 01 May 1991
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
The Curnamona North Project. Joint annual reports and joint final report to the majority of licences' joint full surrender, for the period 16/7/2007 to 29/10/2015. EL 5322 final report to 15/7/2017.
A large, 3370 square km area of the Strzelecki Desert lying over and to the south-east of Lake Callabonna, and extending as far as the SA-NSW State Border, is being explored for possible economic buried sedimentary uranium mineralisation thought to...-
Document
-
Coober Pedy. Annual reports to licence expiry/full surrender, for the period 1/11/2016 to 31/10/2019.
A large area situated on the north-eastern side of the Stuart Range, comprising three separate sub-blocks that taken together are centred ~20 km north of Coober Pedy township, has been explored for possible economic near-surface accumulations of the...-
Document
-
Coober Pedy. First partial surrender report, for the period 1/11/2016 to 31/10/2018.
An area located immediately east and north-east of Coober Pedy is being explored for possible economic near-surface accumulations of the evaporite industrial mineral epsomite. Historic drilling and costeaning in this area performed by CRA Exploration...-
Document
-
Lake Frome [West]. First partial surrender report, for the period 18/10/2013 to 17/10/2016.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 02 Nov 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Frome North. Annual reports for the period 19/8/2013 to 18/8/2016.
An area in the south-west of the Frome Embayment, that is centred ~80 km south-southeast of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium...-
Document
Published: 08 Sep 1916
-
Data release - as updated : Reaphook Hill. Licence-specific annual reports to the commencement of Frome Basin Project joint reporting, plus final report to licence expiry/full surrender, for the overall period 24/7/2013 to 11/1/2022.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 06 Jul 1921
-
Drennans Hut. Annual reports plus final report to licence full surrender, for the period 19/8/2013 to 5/6/2019.
An area in the south-west of the Frome Embayment, that was centred ~16 km south-southeast of Reaphook Hill, was taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation which might...-
Document
Published: 22 Jul 1919