Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 1921
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Peake Hill. Annual reports to licence expiry/full surrender, for the period 9/7/2013 to 8/7/2017.
A small area located on and adjacent to the eastern margin of the Denison Range, ~ 60 km south-east of Oodnadatta, has been explored for possible buried economic sediment-hosted uranium mineralisation. During licence Year 1 the licensee reviewed all...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Edward Creek, Peake Rise and Cootanoorina Hill (the Cootanoorina IOCG Project). Annual and joint annual reports, plus final report to project licences' respective expiry/full surrender, for the period 6/4/2015 to 5/5/2017.
During all of 2015, Cootanoorina Project operator Kingston Resources continued to perform geophysical data processing and modelling, in part using all of the new detailed gravity data that it had acquired in 2014 (548 stations on EL 5487, 102 stations...-
Document
Published: 23 May 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Denison. Second annual report for the period 13/3/2016 to 12/3/2017.
During licence Year 2, work comprised: • providing ongoing land access notifications to relevant landholders and the Native Titleholders; • acquisition over the entire tenement in April 2016 of the second phase of a ground gravity survey, consisting...-
Document
Published: 12 Mar 1917
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 1916
-
North-eastern Peake and Denison Inliers. Final report for approved geophysical work programme, Project ADI RD01-094 [part of Accelerated Discovery Initiative Round 1, 2021].
Licenceholder Minotaur Exploration has received a grant of ADI Round 1 subsidy funds from DEM to assist it in understanding the Proterozoic basement geology of the Peake and Denison Inliers, with the aim of making a step-change in the modelling of...-
Document
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
Mount Denison. Progress reports and final report to licence full surrender, for the period 13/5/1991 to 22/3/1993.
Possible economic epithermal/hydrothermal uranium and base metal deposits hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks in the northern Peake and Denison Ranges were the primary targets addressed by CRA in their...-
Document
-
Mount Charles. Progress reports and final report to licence full surrender, for the period 9/12/1991 to 26/10/1992.
Possible economic epithermal/hydrothermal uranium and base metal deposits, hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks partly concealed by Mesozoic and Cainozoic cover in the north-eastern Peake and Denison...-
Document
Published: 13 Nov 1992
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
Algebuckina. Progress, annual and final reports to licence surrender for the period 4/4/1979 to 3/10/1980.
Four photo-interpreted possible buried kimberlite structural targets that were indicated in the Algebuckina area were investigated by a field programme of drainage and soil geochemical sampling (39 samples) and scintillometric surveying. Three areas...-
Document
-
ComRev 008 Iron Ore in South Australia 2000
The iron-rich rocks of South Australia have been classified into six deposit types - residual, chemical sedimentary iron formations, Fe-skarn and, of lesser significance, hydrothermal, clastic and magmatic. Production has been overwhelmingly from...-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
RB 73/00208 Early Willouran stromatolites from the Peake and Denison Ranges and their stratigraphic significance.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Peake and Denison Project [Part]. Data release upon the surrender of licence. Annual report (15/4/1999) submitted until the commencement of the BHP Billiton - Rio Tinto JV combined reporting. Plus the JV final report on this licence, to 15/4/2003.
Exploration carried out over a south-eastern flanking portion of the Peake and Denison Inliers has targeted possible large-scale Proterozoic ironstone-hosted Cu-Au deposits within a highly magnetic, multiply deformed and metamorphosed buried basement...-
Document