-
Old Umbum [Homestead] and Douglas Creek (the Algebuckina Project). Joint annual reports, and separate final reports at licences' respective full surrenders, for the period 4/9/2012 to 27/8/2015.
Two areas that were believed to cover part of the concealed south-eastern margin of the Peake and Denison Domain of the northern Gawler Craton were taken up by the Monax-Antofagasta copper exploration consortium to explore for possible buried economic...-
Document
Published: 25 Aug 1915
-
Mount Dutton. Annual reports and final report to licence expiry/full surrender, for the period 27/6/1997 to 26/6/1999.
Interpretation of existing aeromagnetic data disclosed three features of probable Precambrian origin near Mount Dutton, 30 km south-east of Oodnadatta. Further work to gain access to the sites was considered not to be justified.-
Document
-
Mount Denison (part of the BHP Billiton - Rio Tinto - Phelps Dodge' Peake and Denison Joint Venture Project). First partial surrender report, for the period 12/7/1993 to 16/9/2003.
Exploration carried out over the northern Peake and Denison Ranges since 1993 has targeted possible large-scale Proterozoic iron oxide associated copper-gold (IOCG) deposits considered to have formed in stratigraphic/structural settings similar to...-
Document
-
Mount Charles (part of the BHP Billiton - Rio Tinto - Phelps Dodge' Peake and Denison Joint Venture Project). First partial surrender report, for the period 1/6/1994 to 14/7/2004.
Exploration carried out over the northern Peake and Denison Ranges since 1993 has targeted possible large-scale Proterozoic ironstone-hosted Cu-Au deposits considered to have formed in stratigraphic/structural settings similar to those seen around...-
Document
-
RB 2020/00002 Gawler Craton Airborne Geophysical Survey Region 2B, Warrina – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study by the Geological Survey of South Australia and CSIRO Mineral Resources to enhance the expression of geological structure in geophysical images and derive depth to magnetic sources over Region 2B of the...-
Document
Published: 01 Feb 2020
- ZIP,
-
Eastern-central Gawler Craton : Archaean to Middle Mesoproterozoic solid geology.
This data package comprises all of the GIS-related technical elements of a preliminary basement solid geology interpretation, which has been undertaken by DSD for the purpose of updating a fundamental mineral exploration-guiding dataset applicable to...-
Dataset
- ZIP,
-
Gawler Province regional geology 3D Model (3D version 1).
The Gawler Province 3D Geological Model is the second product of PIRSA's early 3D modelling trials conducted using 3D GeoModeller software. The work began with identifying the statigraphic units that were to be modelled. Due to the regional scale of...-
Model
- ZIP,
-
RI 006 The Geology of the Peake and Dension Region.
There is no abstract created for this record-
Document
-
Mount Margaret Range, Peake and Denison Ranges. Progress and final reports to licence surrender for the period 4/1/1973 to 18/12/1973.
Exploration for possible unconformity-related hydrothermal plus secondary sandstone-type uranium deposits, undertaken along the length of the southern Peake and Denison Ranges, has comprised fixed-wing and helicopter-borne aerial radiometric surveys...-
Document
Published: 26 Feb 1974
-
Mount Arthur. Progress reports and final report to licence expiry/full surrender, for the period 5/9/1980 to 5/3/1983.
Exploration for possible kimberlite pipes in the Mount Arthur - Mount Toodla area, 30 km east-southeast of Oodnadatta, has included preliminary gravity and ground magnetic surveys, stream sediment sampling, and the drilling of a single diamond cored...-
Document
Published: 09 Jun 1983
-
Allandale. First annual report to licence renewal, for the period 5/12/1994 to 31/5/1995.
Following recognition of the likely young age of the sources of the Abminga area magnetic anomalies, and the discovery of a number of diamond indicator minerals in sediments to the west of the Peake and Denison Ranges, the Allandale joint venture...-
Document
-
Nilpinna Spring. Progress reports and final report to licence expiry/full surrender, for the period 12/7/1982 to 11/1/1985.
As the start of a regional diamond exploration programme with secondary base metal objectives, portion of a detailed low-level airborne magnetic/radiometric survey was flown over the Nilpinna Spring area to define targets for drilling. Field...-
Document
-
Peake Creek and Mount Margaret - Nilpinna areas (northern and central Peake and Denison Ranges). Progress reports and combined final report, plus additional data submitted prior to licence full surrender, for the period 1/10/1966 to 31/1/1969.
Regional geochemical surveys have been conducted by North Broken Hill over 490 square miles covering the northern and central Peake and Denison Ranges, within two new exploration licences which the company took up in 1966 after a private prospector...-
Document
Published: 04 Nov 1968
-
Lagoon Hill. Progress and final reports to licence surrender for the period 2/11/1972 to 1/11/1973.
Exploration for possible roll-front sedimentary uranium deposits developed in porous and arenaceous Upper Jurassic to Lower Cretaceous sediments of the Algebuckina Sandstone and Cadna-owie Formation, where these onlap likely uranium-providing...-
Document
Published: 08 Apr 1974
-
Mount Denison. Progress reports and final report to licence expiry/full surrender, for the period 19/11/1973 to 18/11/1974.
As part of a continuing search for possible Palaeoproterozoic unconformity and vein-related hydrothermal uranium deposits in the northern Peake and Denison Ranges basement outcrop region, prospective stratigraphic and structural features were mapped...-
Document
Published: 16 Jan 1975
-
RB 76/00060 Progress of mapping the Precambrian rocks of the WARRINA 1:250 000 sheet.
There is no abstract created for this record-
Document
Published: 01 Jan 1976
-
ExpNotes WARRINA: Explanatory Notes WARRINA
The Peake and Denison Inliers (comprising the Davenport Range, Denison Range and small basement inliers to the east) form the dominant geological structure on WARRINA. The Inliers include outcrops of Palaeoproterozoic metamorphic basement which is...-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017