-
TEISA Coober Pedy Drilling Project.
There is no abstract created for this record-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Mount Edarteenya (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 70 km east of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has consisted of...-
Document
-
Mount Perrypollkot (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 80 km east-southeast of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
Eaglehawk Dam (part of the Woodmurra Project). Combined first annual/final report to licence expiry/full surrender, for the period 25/11/2015 to 24/11/2016.
An area centred ~70 km south-east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Peake Hill. Annual reports to licence expiry/full surrender, for the period 9/7/2013 to 8/7/2017.
A small area located on and adjacent to the eastern margin of the Denison Range, ~ 60 km south-east of Oodnadatta, has been explored for possible buried economic sediment-hosted uranium mineralisation. During licence Year 1 the licensee reviewed all...-
Document
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
Algebuckina and Peake [Algebuckina South]. Third and second partial surrender respectively : reports for the period 3/8/2004 to 2/8/2009.
Data from part of a heliborne EM survey conducted in September 2007 over the now relinquished portions of EL 3226 has been released. This survey was flown in a search for possible stratabound roll-front style or palaeochannel hosted sedimentary...-
Document
Published: 12 Mar 1910
-
Eurelyana Hill and Pootnoura Creek (the Ant Hill Project). Joint annual reports to licences' joint expiry/full surrender, for the period 19/11/2007 to 18/11/2012.
Two separate licence areas centred approximately 50 km north of Coober Pedy have been explored for possible economic roll-front style sedimentary uranium mineralisation that may have formed within Palaeozoic and younger cover, and for Olympic Dam type...-
Document
Published: 27 Mar 1913
-
Algebuckina. Fifth partial surrender report, for the period 3/8/2004 to 28/9/2012.
Portions of the subject licence located at the northern end of the Peake and Denison Ranges have been relinquished owing to their perceived lower exploration potential. All of the reported work that was done within these licence portions pertains to...-
Document
Published: 12 Oct 1912
-
Algebuckina. Fourth partial surrender report, for the period 3/8/2004 to 28/9/2010.
Three now relinquished licence portions located along the western margin of the Denison Inlier have been explored for possible economic stratabound roll-front style or palaeochannel hosted sedimentary uranium deposits, inferred as likely to have...-
Document
Published: 01 Feb 1911
-
Peake. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 28/9/2014.
An area located to the west and south of the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, has been explored for possible roll-front style sedimentary uranium deposits...-
Document
Published: 01 Oct 1914
-
Algebuckina. Sixth partial surrender report, for the period 3/8/2004 to 28/9/2013.
Portions of an exploration licence situated at the northern end of the Denison Range, on and south of the Neales River, have recently been relinquished due to their perceived diminished potential to contain buried IOCG style or other economic metallic...-
Document
Published: 18 Oct 1913
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
Blyth Creek. Annual reports and final report to licence surrender, for the period 2/1/2007 to 30/9/2013.
Exploration for possible economic IOCG type base and precious metal deposits in buried basement rocks, and for possible roll front style sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area...-
Document