-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Mount Frome and Curnamona (part of the Siccus Joint Venture Project). Partial surrender reports for the period 4/8/1997 to 3/8/2000.
Interpretation of historical drilling and mapping data from four separate small areas located from 40 to 90 km south-west of Lake Frome has indicated that these areas are shallowly underlain by Late Proterozoic basement. Such locations are deemed as...-
Document
-
Unalla Hill, Moonaree and South Lake Gairdner (Lake Gairdner Project). Annual and final reports for the period 25/10/96 to 24/10/99.
Exploration targeted Olympic Dam style mineralisation associated with Hiltaba Suite intrusives and Gawler Range Volcanics at the southern end of Lake Gairdner, between Mount Ive and Moonaree. Sampling of poorly developed calcrete together with rock...-
Document
Published: 02 Dec 1998
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Mount Chandler (Musgrave Ranges Project). Annual and final reports for the period 11/11/1996 to 10/11/1999.
Cu-Au-U prospects associated with shear zones and Kulgeran age granites have been identified in an area approximately 60 km north-west of Marla. Best assay results were obtained from the Indulkana Shear Zone, where rock chip sampling returned up to...-
Document
-
Parakylia (part of the Theseus Project). Final report at licence full surrender, for the period 31/5/2012 to 1/7/2014.
Brownfields exploration for possible buried economic Mesoproterozoic IOCG type mineralisation within a licence area located ~45 km west of the Olympic Dam mine has consisted only of the interpretation of available geophysical data. Additional airborne...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Lake Gregory. Final report at licence full surrender, for the period 13/5/2016 to 9/3/2017.
A licence area covering a large salt lake (Lake Gregory) of the Cenozoic Lake Eyre Basin, and the underlying Mesozoic Eromanga Basin sediments situated to the north of the uranium-rich Mount Babbage and Mount Painter inliers, ~120 km north-east of...-
Document
-
Mount Moulden. Technical data submitted in support of a mineral exploration licence application.
Dataset comprises an information package which was supplied by the licence proponents to the Executive Board of Anangu Pitjantjatjara, as part of the formal process of seeking their permission to conduct mineral exploration activities within the...-
Document
-
Ruby Hill Project : Douglas Creek prospect drilling program. Final report, Project ADI RD02-288 [part of Accelerated Discovery Initiative Round 2, 2022].
Copper Search Australia Pty Ltd (a subsidiary of Copper Search Limited) was granted co-funding from the Department of Energy and Mining in July 2021 to a subsidy total of up to $228,000, to assist it with high risk exploration of remote parts of the...-
Document
-
Olympic Dam operations. Environmental management programme annual report. 01/03/90 - 28/02/91.
Reports on monitoring of: - air and solid waste pollution; - drill pad rehabilitation; - meteorology, vegetation, flora, fauna and soil salinity; - mine ground water drainage; - artesian water drawdown at Wellfield A in the Great Artesian Basin;...-
Document
-
Welbourn Hill. Progress reports and final report to licence expiry/full surrender, for the period 11/4/1991 to 10/4/1993.
Exploration for possible buried Olympic Dam (Cu-Au-U) style mineralisation, undertaken in the Welbourn Hill area by Newmont Australia Limited through its subsidiary Newcrest Mining, initially comprised the acquisition of ground magnetic, gravity and...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby Downs, Acropolis South, Parakylia, Roxby Downs North, Hidden Swamp and Roxby Downs (the Theseus Project). Joint annual reports for the period 4/5/2012 to 30/6/2018.
Brownfields exploration for possible buried economic Mesoproterozoic basement-hosted IOCG type mineralisation, so far undertaken by BHP Billiton ('BHPB') within six semi-contiguous licences together covering an area extending from 40 km south to 68 km...-
Document