-
Lake Everard. Annual and final reports to licence expiry/full surrender for the period 29/8/2006 to 28/8/2009.
A planned reconnaissance soil geochemical sampling survey in an area to the east of Lake Everard was not carried out due to the need to obtain an access agreement from local native title claimants and after making a negative re-assessment of the...-
Document
Published: 14 Sep 1909
-
Toolgerie, Yalata and Black Hill (Fowler Project). Data release at project first partial surrender upon licences' renewal : combined annual reports for the period 30/6/2004 to 29/6/2009.
A group of project exploration licences covering the wholly buried Yalata Ultramafic Complex, which occupies an area of approximately 25 km x 75 km that lies partly within the Yalata Aboriginal Reserve to the north-west of Fowlers Bay, are being...-
Document
Published: 29 Aug 1909
-
Iron Baron (part of Roopena Joint Venture Project). Annual reports to licence expiry/full surrender for the period 2/9/2004 to 1/9/2008.
Exploration for possible buried iron oxide-associated copper-gold deposits along the eastern side of the Middleback Range in the vicinity of Iron Knob, has consisted of a review of historical calcrete sampling data and the acquisition and processing...-
Document
Published: 04 Nov 1908
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
West Woomera. Annual reports and progress reports to licence expiry/full surrender, for the period 31/5/2000 to 30/5/2005.
Copper-gold exploration undertaken over a small area within the Woomera Prohibited Area, 20 km west of Woomera township, was restricted to carrying out geophysical data interpretation and conceptual modelling for generating drill targets based around...-
Document
Published: 29 Nov 1904
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-25, eastern Mabel Creek High: Big North-West Proterozoic epithermal / hydrothermal IOCG mineral prospect. Project interim and final reports.
In its successful application to PIRSA for a grant of PACE Initiative Year 4 drilling project funding, Alliance Craton Explorer announced that it had generated an extremely attractive geophysical target with potential for Mesoproterozoic basement -...-
Document
Published: 25 Nov 1907
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Houghton. Annual reports and partial relinquishment report to licence expiry/full surrender, for the period 22/10/2001 to 21/10/2006.
Three potentially economic gold and platinum / palladium - bearing, known primary uranium-mineralised targets in the Palaeoproterozoic Houghton basement inlier have been evaluated through the conduct of office-based geological and geophysical studies,...-
Document
Published: 26 Apr 1907
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
McDouall Peak. Partial surrender reports, for the period 8/10/2012 to 7/10/2020.
Within a licence area which is centred ~100 km south-southeast of Coober Pedy, holder Quasar Resources’ primary exploration target is concealed basement-hosted IOCG style mineralisation similar to that existing at the Prominent Hill and Carrapateena...-
Document
Published: 02 May 1918
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : [south-western] Lake Torrens area. Annual reports for the period 13/10/2010 to 12/10/2012.
An area centred ~30 km north-east of Bookaloo, which is mostly located within the Lake Torrens National Park, is being explored primarily for possible buried economic IOCG style mineralisation of the type exemplified by major deposits occurring at...-
Document
Published: 05 Nov 1912
-
Hidden Swamp and Stuart Creek South (part of the Theseus Project). Joint first partial surrender report, for the period 18/6/2012 to 20/10/2016.
Small parts of two licence areas located on the north-central Stuart Shelf, between 35 and 70 km north-northwest of the Olympic Dam mine, have been surrendered due to their perceived low prospectivity for Mesoproterozoic IOCG type mineralisation. Part...-
Document
Published: 21 Dec 1916