-
Data release - as updated [made at SA Director of Mines' discretion] : Cassini area. Annual technical report for period ending 15/06/2018.
Exploration licence 5973 “Bonaventura Project” is in the Cassini area approximately 30 km west of Kingscote Kangaroo Island. The project lies on the southern margin of the Gawler Craton and covers a 40 km section of the Cygnet-Snelling Shear Zone....-
Document
-
Bangor. Combined first annual/final report at licence full surrender, for the period 23/8/2018 to 22/11/2019.
A large area centred ~20 km east-northeast of Port Germein, covering ground at the southern end of the Flinders Ranges, has been explored for possible altered sediment - hosted gold deposits of disseminated, Carlin style which are genetically...-
Document
Published: 14 Oct 1919
-
Willouran Ranges. Progress and final reports to licence expiry/full surrender for the period 11/12/1967 to 10/12/1969.
In a search for possible economic base metal mineralisation in the Willouran Ranges, a review and statistical trend surface analysis of previous company sream sediment geochemical data, combined with MIM's own orientation studies on the distribution...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Frome. Annual reports for the period 4/11/2015 to 3/11/2018.
During the 2015-2016 period, reconnaissance portable XRF instrument soil spectrochemical sampling, plus limited rock chip sampling, was continued on the subject tenement. Work concentrated on infill sampling at Erragoonah Hill and over Aster...-
Document
Published: 21 Dec 1918
-
Murray Basin. Final report, Project ADI RD02-289 [Accelerated Discovery Initiative Round 2, 2022].
Hillgrove Resources Ltd (HGO) has identified a large number of geophysical targets through the south-east Cambro-Ordovician basement of South Australia prospective for Cu-Au mineralisation and covered by the Tertiary-Quaternary Murray Basin sediments....-
Document
Published: 12 Sep 1922
-
Pernatty Lagoon. Final report, Project ADI RD02-295 [Accelerated Discovery Initiative Round 2, 2022].
This report pertains to the Pernatty C Zambian Copperbelt (ZCB) Project which was partially funded by a $298,500 grant through the State Government’s Accelerated Discovery Initiative (ADI) which aims to make a major contribution to achieving the South...-
Document
Published: 02 Aug 1922
-
Wirrealpa. Progress, partial surrender and final reports to licence surrender for the period 13/11/1978 to 26/2/1988.
Economic deposits of Mississippi Valley type stratabound lead-zinc mineralisation within in Cambrian limestones were the targets of exploration undertaken on and near the Wirrealpa Diapir. A preliminary field reconnaissance had shown that surface...-
Document
-
Mabel Creek Project. Final report, Project ADI RD03-412 [Accelerated Discovery Initiative Round 3, 2023].
“Deep EM surveying for large BHT and ISCG deposits” Under round three of the South Australian Government’s Accelerated Discovery Initiative, Petratherm was awarded funding for Deep EM surveying for large BHT and ISCG deposits on the companies Mabel...-
Document
-
Groundwater geochemistry in CSR's Stuart Shelf tenements, SA.
194 stored groundwater samples taken from CSR's exploratory drillholes put down on the southern Stuart Shelf after 1973 have been analysed for copper and zinc, plus also lead on occasion, and another 84 such stored samples dating from 1977 were...-
Document
-
Beltana mine area. Progress reports and final report to licence full surrender, for the period 27/9/1982 to 8/12/1987.
Renewed exploration by E-Z of the area surrounding the Beltana zinc mine has investigated the possibility for finding deep, unweathered Cambrian or Proterozoic carbonate-hosted zinc-lead sulphide mineralisation. It was considered that this target had...-
Document
-
Glenloth Goldfield. Progress reports to licence expiry/full surrender, for the period 12/1/1987 to 11/1/1989.
GLENLOTH GOLDFIELD TARGET: Gold associated with quartz veins in shears in the Glenloth Granite, which have an uncertain relationship to dolerite dykes. Possible mineralised shears or dykes within the Glenloth Granite, as indicated by NW trending...-
Document
Published: 10 Jan 1989
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 18/9/1979 to 17/9/1981.
Continued exploration for stratabound base metals across an area of the southern Stuart Shelf, extending west and north-west of Port Augusta, has included an evaluation of the results of previous stratigraphic drilling on the prior-held EL 332, plus...-
Document
Published: 16 Nov 1981
-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Flinders Ranges Joint Venture (Esso / BHP) - drilling programmes.
Drilling included : at the Linda prospect - 20 reverse circulation holes (total 502 m) and 2 diamond holes (total 301 m); at the Wilnuroona prospect - 7 reverse circulation holes (total 370 m); at the Eric prospect - 107 RAB holes (total 1107 m)...-
Document
Published: 01 Jan 1985
-
Hope Bank. Progress reports and final report to licence full surrender, for the period 6/1/1987 to 6/9/1988.
TARGET: Telfer-style gold in the Wabricoola area, NW of Yunta. EXPLORATION: Image processing of BMR airborne magnetic survey data, and detailed stream sediment (452) and soil (110) geochemical sampling. RESULTS: Anomalous low order gold values that...-
Document
Published: 25 Aug 1988
-
Data release [made at SA Director of Mines' discretion] : Mount Ive Project. First annual report, for the period 1/1/2016 to 31/12/2016.
The “Mt Ive Project” forms the western part of the “Gawler Ranges Project”. The “Gawler Range Project” comprises 11 tenements covering a total area of 4,749 km2 in northern Eyre Peninsula. All 11 tenements are licenced to and operated by Menninnie...-
Document
-
Mount Gunson copper deposit. Cattlegrid orebody sample testing by metallurgy and mineragraphy (results of 1973 and 1974 studies).
There is no abstract created for this record-
Document
-
Metallurgical testwork - MG14 deposit. Final report.
Tests were carried out on an ore composite sample from MG14, and a comparative grind on a current mill sample from the Cattlegrid deposit. The major sulphide minerals are chalcocite (1.6%), bornite (1.5%), chalcopyrite (0.2%), sphalerite (0.3%),...-
Document
-
Roopena. Progress reports from 16/10/79 to 22/5/83.
800 samples were tested for kimberlitic indicators, of which 60 were also analysed for uranium. Base metal and uranium exploration under the joint venture included reprocessing of 1976 BMR data to produce 1:50 000 aerial magnetic and radiometric maps...-
Document
Published: 01 Jan 1983
-
Mount Gunson - MG14 deposit metallurgy. Research reports for the period October 1974 to August 1984.
In October 1975, Mount Gunson mine operator Pacminex determined that the composition of mineable copper sulphide ore potentially obtainable from the undeveloped MG14 area would very likely be more difficult to process than existing Cattlegrid mine...-
Document