RB 77/00087 South-East water resources, Mundulla town water supply. Progress report no. 2.
A recent scout well drilled into the confined Dilwyn Formation (formerly Knight Group) at Mundulla intersected only low permeability sediments unsuitable for development. However, this does not rule out the possibility that a suitable aquifer will be...-
Document
Published: 01 Jan 1977
-
RB 62/00098 Chowilla Project. Saline water disposal, Tilmy Flat, Co. Hamley. Geological investigation progress report no. 1, May 1966.
Low lying tracts of ground lying northwest of the Chowilla dam site are proposed for use as storage - evaporation basins for highly saline water produced in small quantities from excavations during construction of the dam and possibly in larger...-
Document
Published: 01 Jan 1966
-
RB 65/00106 250 000 gallon elevated tank, Barmera. Geological investigations progress report no. 1, feasibility stage. Crown Land, Barmera township, Co. Hamley - EWS Department.
The site of a proposed elevated water storage tank was investigated by means of one test hole. The hole was tube sampled utilising the hydraulic pull-down of a Mayhew rotary rig. Before commencing the push tube hole two rotary air blown holes were...-
Document
Published: 01 Jan 1967
-
RB 65/00107 250 000 gallon elevated tank, Loxton. Geological investigations progress report no. 1, feasibility stage - EWS Department.
The site of a proposed elevated water storage tank was investigated by means of one test hole. The hole was tube sampled utilising hydraulic pull-down. Hard sections were rotary drilled. Before commencing the push tube hole a rotary air blown hole was...-
Document
Published: 01 Jan 1967
-
RB 71/00033 RENMARK, South Australia, sheet SI54-10 International Index.
There is no abstract created for this record-
Document
Published: 01 Jan 1972
-
RB 73/00115 SE Meat (Aust.) Ltd - Proposed new building, secn 388 Hd Jessie. Report on foundation investigations.
The site of a proposed new building for SE Meat (Aust.) Limited was investigated by one cable too hole to 14m. The drilling showed a sequence of fill and Quaternary clay over Tertiary Parilla Sand and Gambier Limestone. Founding of the structure in...-
Document
Published: 01 Jan 1973
-
RB 61/00145 Report on site investigation proposed SA Cooperative Bulk Handling Ltd silo, railway yards, Wanbi, Hd Mindarie.
The site for a proposed 2 cell reinforced concrete silo in the railway yards at Wanbi was investigated using four percussion drillholes. Hole No. 1 was drilled to 65 ft. and hole No. 2 to a depth of 31 ft. A near-surface kunkar layer 3 feet thick,...-
Document
Published: 01 Jan 1965
-
RB 75/00041 Monarto new town - Paragum stratigraphic bore completion report, section 1972-17.
A stratigraphic bore was completed by cable tool drilling to a depth of 48m at Paragum Station, monarto South, in connection with the Regional Hydrological Survey. The hole intersected Blanchetown Clay, Parilla Sand and Mannum Limestone over phyllite...-
Document
Published: 01 Jan 1975
-
RB 75/00064 Monarto City Centre. Geotechnical investigations report no. 1.
Engineering investigations at the Monarto City Centre consisted of 8 diamond drill holes up to 15m deep, 25 backhoe test pits, detailed mapping and seismic refraction surveys. The area consists of Kanmantoo Group meta-sediments, in part overlain by a...-
Document
Published: 01 Jan 1975
-
RB 74/00111 Amphibolite deposit near Tailem Bend.
Railway ballast was sought from amphibolite of the Kanmantoo Group of Cambrian age which subcrops on a bedrock ridge in the Murray Basin near Tailem Bend. A surface sample of amphibolite returned low Los Angelese Abrasion and Sodium Sulphate Soundness...-
Document
Published: 01 Jan 1977
-
RB 76/00091 Monarto brick clay investigation - Monarto Development Commission.
Reconnaissance sampling and exploratory drrilling have been undertaken to locate suitable brickmaking clay for the proposed city of Monarto. Samples from exposures and boreholes in Quaternary and Tertiary sediments and in weathered bedrock have been...-
Document
Published: 01 Jan 1976
-
RB 76/00107 Stratigraphy and engineering geology of the Monarto designated area - Monarto Development Commission.
Drilling of 25 cable tool holes to depth up to 20.1m in the designated area for Monarto New Town illustrates the nature, distribution and thickness of Quaternay and Tertiary sediments. The main tertiary units are the marine fossiliferous limestone of...-
Document
Published: 01 Jan 1976
-
ExpNotes RENMARK: Explanatory Notes RENMARK
There is no abstract created for this record-
Document