-
Stuart Creek. Annual reports for the period 9/4/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
In exploration carried out over an area located 60 km north of the Olympic Dam mine, Adelaidean Wilpena Group metasediments extending northwestwards along strike from gold-anomalous strata previously identified on Tasman Resources' Mulgaria EL 2340...-
Document
Published: 07 May 1900
-
Boolcoomata (part of the Drew Hill Project). Final report at licence expiry/full surrender for the period 30/9/2003 to 29/9/2008.
An area situated on Boolcoomata Station, ~35 km east-northeast of Olary, was explored both for possible epithermal/hydrothermal copper-gold-molybdenum deposits and for hydrothermal or stratiform/syngenetic base metal deposits that may have formed...-
Document
Published: 29 Apr 1909
-
Mintaro. Annual and final reports to licence surrender, for the period 19/11/2007 to 21/8/2009.
Basal Umberatana Group glacial tillitic sedimentary sequences and upper Burra Group interglacial arenaceous sediments were explored for possible economic stratabound gold mineralisation in an area located near and to the north of Mintaro, which...-
Document
Published: 11 Sep 1909
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 1909
-
Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-33 - north-eastern Gawler Craton - Douglas Creek gravity anomaly Mesoproterozoic basement IOCG mineral prospect. Project interim and final reports.
The north-eastern margin of the Gawler Craton is prospective for Mesoproterozoic iron oxide - associated copper-gold (IOCG) style mineralisation, but the considerable depth to crystalline basement, combined with the presence of an artesian Mesozoic...-
Document
-
Hawker. First partial surrender report for the period 2/7/2007 to 1/7/2008.
Exploration of the outcropping Proterozoic/Cambrian stratigraphic boundary in the Chace Range region of the southern Flinders Ranges, in one licence subarea taken out close to Hawker and another a short distance to the north-east, targeted possible...-
Document
Published: 18 Dec 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 2 of 2].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. In the latter half of 2003, new project partner Phelps Dodge reprocessed aeromagnetic and gravity data and produced a magnetic/structural interpretation, from which...-
Document
Published: 15 Oct 1909
-
Kondoolka, Yaninee, Buckleboo, Corrobinnie and Waverley Hill (part of the Eyre Peninsula Joint Venture Project). Joint first partial surrender report for the period 22/5/2003 to 28/12/2008.
Eight portions of the subject Adelaide Resources' / Newmont Mining joint venture licences have recently been relinquished, and surface calcrete sample geochemical data and airborne magnetic/radiometric/DTM data acquired over them are presented.-
Document
-
Walparuta. Progress and annual reports, and final report to licence expiry/full surrender, for the period 6/12/1994 to 20/4/2009.
Ground encompassing the Palaeoproterozoic basement Weekeroo Inlier of the Olary district, which includes the historic Walparuta copper-gold mine located approximately 20 km north of Manna Hill township, was taken out to search for possible economic...-
Document
Published: 28 Aug 1909
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Childara Well. Annual reports and final report to licence expiry/full surrender, for the period 19/2/2004 to 18/2/2009.
An area lying along the south-western margin of the Gawler Ranges has been explored by Minotaur Resources to assess the economic iron oxide - associated copper-gold mineralisation (IOCG) potential of near-coincident gravity and magnetic anomalies that...-
Document
Published: 23 Mar 1909
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-14 - Monax Mining Ltd Punt Hill Project, IOCG-prospective Camel Dam prospect gravity anomaly. Drilling project final report.
Monax Mining's Punt Hill Project, comprising EL4642 (Punt Hill) and EL 4548 (Yeltacowie), is located within the Olympic iron oxide - associated copper-gold (IOCG) Province on the eastern margin of the Gawler Craton, South Australia. This has a highly...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kanmantoo. Progress reports, annual reports and technical reports for the period 1/1/1998 to 2/11/2008.
Exploration Licence (EL) 2663 Kanmantoo is located on the eastern flank of the Adelaide Hills, and exists as two separate blocks forming a belt up to 10 km wide and approximately 75 km long that covers an area dominated by outcropping and subcropping...-
Document
Published: 16 Dec 1908
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document