Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
RB 35/00052 Open-cut mining of Leigh Creek coal (27/3/1952).
It is proposed to raise the production rate at the Leigh Creek Coalfield from half a million tons to two million tons per annum. From an economic point of view as well as from the point of view of rate of production open cut mining would be preferable...-
Document
Published: 27 Mar 1953
-
RB 36/00077 Leigh Creek Coalfield. North Field, Lobe C.
Coal has been proved at Lobe C to a depth of 220 feet of overburden in an arcuate area along the southern and western margins of the basin. Within the suggested open cut area the coal seam averages 35 feet in thickness, has a weighted average ash...-
Document
Published: 26 Oct 1953
-
RB 37/00028 Leigh Creek Coalfield: Report on exploration of the north-eastern margin - Telford Basin area 'Telford Opencut, extension east'. (CONFIDENTIAL)
An area located on the north-eastern margin of the Telford Basin, to the east of the present extent of theTelford Open Cut mine main pit, which is known to contain potentially mineable buried coal seams, has been examined geologically and...-
Document
Published: 03 Mar 1954
-
RB 37/00157 Leigh Creek Coalfield - Exploration of the southeastern margin, Telford Basin area (Telford Main Seam eastern margin, southern extension).
The area under review is situated in the south-eastern section of Telford Basin between co-ordinates 8,000 and 34,000, and is a southern extension of the main (Telford) coal seam proved previously on the eastern margin. Coal has been proved by close...-
Document
Published: 14 Jul 1954
-
RB 39/00079 Review of mineral production - 1954.
There is no abstract created for this record-
Document
Published: 17 Jun 1955
-
RB 86/00086 Bowmans coal deposit. 1986 drilling programme data report.
Drilling within preferred mining area of the deposit was undertaken to obtain coal quality and tonneage data.18,100 mm diameter cored holes (554 metres) and 18 open holes (3138 metres) were drilled to delineate optimum mining area (6529 : 4 MW558 -...-
Document
Published: 01 Nov 1986
-
RB 78/00089;Env 02960 Appraisal drilling results, Anna Coalfield, Murray Basin, South Australia.
At the Anna Coalfield, the November 1976 appraisal drilling by SADME of 2 rotary mud, partly cored vertical boreholes with a total penetration of 159.62 m (including 28.36 m of continuous ?NQ coring over the coal-bearing section) has confirmed the...-
Document
Published: 11 May 1978
-
RB 79/00093 Lock Coalfield hydrogeological study - Progress report no. 1 (Volume 1 of 2).
Hydrogeological investigations undertaken by SADME at the Lock Coalfield have shown that significant aquifer systems occur above and beneath the coal, and that the coal itself has negligible permeability. Permeability of both aquifers is low,...-
Document
Published: 01 Jan 1979
-
RB 99/00025 Palynological analyses and dating of nine samples from Lochiel coal pit, St Vincent Basin, South Australia.
Palynological analyses of nine grab samples from the Lochiel coal test pit show two distinct floristic types, i.e. Haloragacidites spp. dominated and Nothofagidites spp. dominated palynofloras. This distinction is interpreted as indicating a change...-
Document
Published: 01 Aug 1999
-
RB 91/00051 Mount Owen Coal Project preliminary geotechnical report.
Field investigations were undertaken to provide preliminary geotechnical and hydrogeological parameters for the design of a new open pit coal mine at Mount Owen in the Hunter Valley of New South Wales. This work was done in association with the Joint...-
Document
Published: 01 May 1991
-
Update of a study of the Westfield [Coal] Deposit.
A consultancy desk study of Jan.-Feb. 1986, as updated to 1992, for the proposed development of an underground longwall mine at the Westfield coal deposit. It assesses concepts of mining technical feasibility, establishes a preliminary mine plan, and...-
Document
-
Evaluation of northern Arckaringa Basin coal occurrences. Miscellaneous technical reports re. the Wintinna deposit, and also the Westfield deposit : mining feasibility and costing studies.
There is no abstract created for this record-
Document
-
Economic study - coal from [the] Wintinna Coalfield for power generation in South Australia.
A mine development and fuel technology applications study has been carried out on the Wintinna Coal Deposit to: 1. Determine the output tonnages of coal required for economic operation by opencut mining methods. 2. Compare the quality of Wintinna...-
Document
-
Williams Bore [Weedina coal deposit]. Progress reports to licence expiry/full surrender for the period 31/10/1990 to 29/9/1998.
An area of 261 square km covering the Weedina coal deposit within the Arckaringa Basin has been retained by Cyprus Australia to protect the core of a very large buried Permian age sub-bituminous rank coal resource (~ 1200 Mt measured and indicated + ~...-
Document
-
Weedina coal deposit, Arckaringa Basin. Mining proponent's submission to FEAC, including supporting geological data.
In June 1986 Cyprus Australia Coal Co., a wholly-owned subsidiary of a large American coal producer and marketer then holding exploration licences over the Weedina coal deposit in the far north of South Australia, submitted to the South Australian...-
Document
-
Preliminary feasibility study for the Wintinna Coal Project.
This report sets out the results of a pre-feasibility study carried out for the Wintinna Coal Project in South Australia. Contained in it are a description of the facilities and preliminary cost estimates for the development of the project. The study...-
Document
-
Proposal to the Electricity Trust of South Australia for the supply of thermal coal for power generation.
This proposal being made to ETSA, for the supply of 1.3 Mt of thermal coal per year over 25 years for electrical power generation at the new Northern Power Station currently being built at Port Augusta, is intended to allow that utility to make an...-
Document
-
Lochaber. Data release : final report at licence full surrender, for the period 29/8/2006 to 6/7/2009.
EL 3623 is located 220 km south-east of Adelaide, and lies to the west of the township of Naracoorte. The tenement is also located ~35 km to the south-east of the much larger Kingston lignite deposit contained within the subject licencee's related EL...-
Document
Published: 02 Sep 1909
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document