Woomera, Emmie Bluff, Salt Creek, Portulacca Ridge and Red Lake. Progress reports for the period 21/8/1979 to June 1983.
Continuing exploration in the Woomera area has included the acquisition of a ground magnetic and gravity survey over the Buller Dam anomaly, which lies on the western flank of the Acropolis aeromagnetic anomaly, and this work confirmed that the former...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Emmie Bluff. Progress reports to licence expiry/full surrender, for the period 28/10/1978 to 11/2/1983.
Ongoing exploration for Olympic Dam-style Cu-Au-U mineralisation, over an area centred ~15 km south-east of Arcoona Homestead, during this period comprised 3D geophysical modelling of possible source geometries for, and RC drilling (10 holes, total...-
Document
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 60/00043 Examination of five possible sites for water storages near Whyalla. Geological progress report, March 1965.
At the request of Mr. C. England, Assistant Engineer for Design, E. and W.S. Department, the sites for 5 alternative water storage facilities near Whyalla were examined on 17th and 18th February, 1965. On 18th February, the inspections were in company...-
Document
Published: 05 Mar 1965
-
RB 78/00067 Mount Gunson copper mine groundwater investigations.
A proposed increase in tonnage treated by the Mill at Mt. Gunson Copper Mine will require an increase in withdrawal from the well field from the present level of approximately 4 000 gph, (18.'2 m5 p.h.) to 9 000 gph (41.0 m p.h.). Careful management...-
Document
Published: 01 Jan 1978
-
RB 81/00099 Stuart Highway, Baker Well to Gosses section. Drilling for construction water.
13 of 38 wells were completed as production wells. Pump testing showed that 6 were capable of yielding 50 kl/day or more for 2 year period. Salinity was in excess of 10 000 mg/L TDS except near Glendambo where water from 4000 to 8000 mg/L was...-
Document
Published: 01 Jan 1982
-
RB 80/00035 Stuart Highway, Pimba to Baker Well section. Drilling for construction water.
Of 16 wells drilled, only 6 have an adequate supply of saline groundwater for construction use. On the western part of the section, 4 wells into the deeper fractured rock aquifer were dry. Subsequently another 8 randomly sited wells were drilled into...-
Document
Published: 01 Mar 1980
-
RB 79/00086 Stuart Highway, Bookaloo to Mount Gunson section. Drilling for construction water.
Six holes totalling 659 m were drilled at four locations on the Bookaloo - Mount Gunson section of the Stuart Highway. Supplies of construction quality groundwater were obtained at three of the locations. There is some evidence to suggest that the...-
Document
Published: 01 Jan 1979
-
RB 91/00041 Geology of the KINGOONYA 1:250 000 map sheet area.
Extensive field geological mapping, augmented by petrological and geochemical studies, reinterpretation of company drilling and water-bore logs and a nine-hole drilling programme has detailed the geology of the KINGOONYA area. The stratigraphy spans...-
Document
Published: 01 Apr 1991
-
RB 92/00061 Soil Air CO2/O2 Project. Progress report 3, Mount Gunson area.
The rationale of utilising soil air carbon dioxide and oxygen measurements as a guide to oxidising sulphide is that sulphide oxidation in the presence of water and oxygen will produce sulphuric acid, which in turn will attack any carbonates present to...-
Document
Published: 01 Oct 1992
-
An atlas of geochemical dispersion around the Cattlegrid orebody.
Geochemical indicators to buried stratabound copper mineralisation in the Cattlegrid orebody were studied in their primary and secondary dispersion patterns within the overburden, to try to elucidate the likely most effective elements and the possible...-
Document
-
Bernard Hill and Mount Moseley. Respective first partial surrender reports, for the period 5/9/2002 to 31/7/2003.
ELs 3008 and 3022 form part of the Mount Gunson Project, where the targets are stratiform copper in Adelaidean sediments and Olympic Dam style mineralisation in Proterozoic basement. As a result of a detailed review by a consultant group, several...-
Document
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports and final report to licence expiry/renewal over a reduced area, for the period 4/8/1995 to 3/8/2000.
Stuart Metals took up EL 2099 covering ground in the Wirrappa - Lake Blyth - Bookaloo Siding area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Mount Gunson. Progress reports and technical reports to licence expiry/re-issue over a larger area, for the period 25/10/1979 to 20/12/1985.
As part of an ongoing search for extensions to the Cattlegrid orebody style of stratiform Cu-Fe-Mn mineralisation within its exploration licences on the Stuart Shelf, besides testing for any indications of Olympic Dam type Cu-U-Au deposits in the...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document