-
Hanns Hill. Progress reports for the period 19/1/81 to 6/12/82.
Follow up to stream sediment sampling near Oodnadatta in the Mount Dutton area suggests that anomalous nickel, chromium and cobalt values are associated with ironstone, and anomalous niobium with geodes. No kimberlites were discovered.-
Document
Published: 01 Jan 1982
-
Mount Sabine. Partial surrender report for the period 12/2/1981 to 22/1/1986.
As part of a regional diamond and kimberlite exploration programme, 50 drainage and loam samples were collected for heavy mineral analysis from within the two areas being relinquished, which lie respectively 50 km NW and 40 km NE of Kingoonya. No...-
Document
-
Gawler Ranges. Diamond exploration relinquishment report, November 1982.
An integrated programme for diamonds combining heavy mineral and geochemical sampling, photogeology, and some geophysics has shown that EL 827's prospectivity for diamonds is extremely low. Heavy mineral sampling was negative, geochemical results...-
Document
Published: 01 Jan 1982
-
(South-eastern) Lake Torrens area. Annual reports to licence expiry/full surrender, for the period 27/7/1994 to 13/10/2000.
Features interpreted from detailed low-level infill airborne coverage to a 1995 SAEI aeromagnetic survey, flown over a large area of disturbed, mainly Adelaidean sedimentary diapiric terrain located between Hawker and the south-eastern shore of Lake...-
Document
Published: 25 Oct 1900
-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
Pichi Richi Pass [south of Quorn]. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 9/12/1992 to 1/12/1997.
Diamond exploration undertaken over a much dissected 460 square km area of the south-central Flinders Ranges between Stirling North and Mount Arden comprised aeromagnetic interpretation and heavy mineral processing of a regional suite of 170+ stream...-
Document
-
Peachna. Progress reports, annual reports and final report to licence full surrender, for the period 22/9/1988 to 8/9/1994.
Possible economic Broken Hill - type stratiform Pb and Zn, and Middleback Range style iron ore, were targeted near Lock on central Eyre Peninsula by Western Mining Corp., who farmed-in to Stockdale's EL 1516 on March 1st, 1990 as part of a regional...-
Document
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
RB 94/00031 Interpretation of NOAA-AVHRR satellite images over the ABMINGA 1:250 000 sheet, investigating the suspected kimberlite signatures in the SAEI aeromagnetic data.
A 400 m line spacing aeromagnetic survey was conducted over ABMINGA during 1992-1993 as part of the South Australian Exploration Initiative (SAEI). Short wavelength 'bullseye-dipole' anomalies observed on the aeromagnetics appear very similar to...-
Document
Published: 01 Jan 1995
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
Milang [Homestead]. First partial surrender report for the period 25/8/2005 to 24/8/2006.
Exploration for a range of mineral commodities over relinquished parts of a licence area situated 80 km north-east of Orroroo has mainly targeted the Cainozoic to Mesozoic cover rocks for possible sedimentary gold, uranium, mineral sands and...-
Document
Published: 14 Sep 1906
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Pandappa, Bendigo and Nackara (part of the Flinders Ranges Project). Joint annual reports and final report to licences' respective expiry/full surrender, for the period 1/1/2004 to 12/1/2017.
Three contiguous licences located at the south-western end of the Nackara Arc structural province have continued to be explored for possible economic buried diamond mineral occurrences in the cover and bedrock that may exist in association with...-
Document
Published: 19 Oct 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Red Range (part of the Copley Project). Annual reports for the period 8/10/2007 to 7/10/2018.
A small area located 45 km north-east of Leigh Creek, which covers the sites of numerous small historic diggings made by prospectors searching for copper and lead-zinc-silver mineralisation, is now being explored afresh for possible economic...-
Document
Published: 17 Nov 1917
-
Paratoo (was formerly part of the Grainger Project; recently made part of the Flinders Ranges JV Project). Annual reports from the time of cessation of previous joint venture(s) reporting, for the period 20/7/2007 to 1/11/2016.
During 2007-2008, the first year of the diamond exploration joint venture with the Filsell brothers in the Paratoo area, Flinders Mines' activities comprised: • acquiring part of a detailed helicopter-borne infill aerial magnetic ('helimag') survey,...-
Document
Published: 30 Jan 1919
-
Data release - as updated : Mount Grainger (part of the Flinders Ranges Diamond Project and the Nackara Arc Gold Project). Combined annual reports and annual reports to licence expiry/full surrender, for the period 6/2/2008 to 5/2/2017.
An area centred ~40 km east of Peterborough in the vicinity of Mount Grainger Goldfield has continued to be explored for possible small diamondiferous kimberlite bodies and for buried economic stratabound, structurally controlled and disseminated...-
Document
Published: 19 Sep 1916
-
Mount Willoughby and Bloods Creek / Vaughan Hill, Mount Algoochinna, Mount Alice and Mount Randolph (the Alberga Diamond Project). Final report on surrendered ELs 2500 and 2502, plus partial surrender report for ELs 2495, 2496, 2498 and 2501.
Diamond exploration in a region north to north-west of Oodnadatta comprised heavy mineral and geochemical sampling over magnetic anomalies selected from aeromagnetic surveys and further defined by ground magnetometry. Certain of this ground was...-
Document
-
Seven Mile Swamps (part of the Euria Project). Annual report and progress report to licence full surrender, for the period 31/5/1996 to 10/2/1998.
Calcrete sampling, mapping, and RAB and aircore drilling (211 holes, total 7334 m) were carried out 20 km north of Penong, in an area underlain by Hiltaba Suite granitoids, Archaean gneisses and a major associated shear zone. Although geochemical...-
Document
Published: 18 Dec 1997
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 1912