-
Aston Hill (part of the Nawa Domain Project). Annual report and final report to licence surrender, for the period 25/6/2013 to 4/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 2015
-
Mount Davies (part of the Central Giles / Wingellina Nickel Project). First partial surrender report at licence expiry/renewal, for the period 4/3/1999 to 23/9/2018.
The major part of the subject 134 square km total area of tenement ground relinquished from EL 5184 on 23/9/2017 contains the Michael Hills copper prospect (Area 11). A large portion of the remainder of the surrendered ground, in a separate block...-
Document
Published: 31 Oct 2017
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-35, Mount Darling area magmatic nickel-copper-PGE mineral prospects. Project final report.
Two negative magnetic anomalies within EL 3228 Mount Darling that were believed to be caused by buried layered ultramafic intrusive rocks of the Mesoproterozoic Giles Complex were the targets of the subject exploration by Crossland Minerals, since...-
Document
Published: 13 Jan 2008
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 2009
-
Ki Ki (part of the Coonalpyn Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 14/10/1999 to 17/1/2009.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated within the Cambrian Kanmantoo Trough near Ki Ki in the upper South-East, the licensee and...-
Document
Published: 23 Feb 2009
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 2019
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 2023
-
Kalabity. Final report, Project ADI RD02-266 [Accelerated Discovery Initiative Round 2, 2022].
On 19th May 2021 Sinosteel SA secured ADI funding to carry out the comprehensive Curnamona Geochemical Sampling Program utilising the skills of the in-house geologist together with academic research collaboration to perform rigorous geochemical...-
Document
Published: 31 Aug 2022
-
Tallaringa North - Manya Bore area (part of the Nawa Domain Project). Annual report and final report to licence surrender, for the period 25/6/2013 to 4/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 2015
-
Wynbring. Second partial surrender report at licence expiry/renewal, for the period 23/5/2014 to 22/5/2019.
488 square km of EL 5417, located ~95 km north-west of Ceduna within the Yellabinna Regional Reserve, and extending for between 5 km and 29 km towards the south-southwest from Mount Christie Siding on the Trans Australia Railway, have been...-
Document
Published: 12 Apr 2019
-
Great Victoria Desert - Alinya area (part of the Nawa Domain Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2016.
An area centred ~145 km west-northwest of Coober Pedy, and extending northwards for ~40 km from near the Anne Beadell Highway, has been explored for possible buried economic mineralisation that may occur in basement rocks of the Gawler Craton and the...-
Document
Published: 05 Oct 2016
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-05, west-central Musgrave Province: Giles Complex, Harcus intrusion and Purananja intrusion magmatic copper-nickel-PGE prospects. Project interim and final reports.
PepinNini Minerals has recently completed a small stratigraphic drilling programme within the Musgrave Province in South Australia, which was carried out as a collaborative drilling project (DPY4-05) undertaken between the company and the SA...-
Document
Published: 30 Nov 2007
-
The Musgrave Project [Part]. Data release in lieu of submitting a final report for EL 5317: joint annual reports for the period 5/10/2010 - 31/1/2016, plus separate letters of advice of full surrenders the last being accepted on 10/11/2016.
There is no abstract created for this record-
Document
Published: 06 Oct 2016
-
Fig Tree Corner. Second partial surrender report, for the period 10/3/2005 to 4/4/2019.
Most of a sizeable licence area located on SA's Far West Coast, which formerly extended for 10 to 90 km inland from the vicinity of Bookabie, has now been partially relinquished owing to its perceived diminished prospectivity for Tertiary marine...-
Document
Published: 12 Apr 2019
-
Sahara Prospect. Final report, Model Test and Core Scanning. Project ADI RD02-270 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises exploration conducted by Western Areas between May 2021 and October 2021, under the ADI Agreement ADI: RD02/270-ED Sahara Prospect Model Test and Core Scanning. The discovery of magmatic Ni-Cu sulphide at Sahara in 2020,...-
Document
Published: 31 Oct 2022
-
Poondinga. Third partial surrender report, for the period 27/10/2004 to 4/4/2019.
309.6 square km or ~18.77% of the pre-existing area of EL 5564 Poondinga was partially relinquished on 19/2/2019 because in the licensee's view this south-eastern portion of the licence are does not appear to exhibit the geological features required...-
Document
Published: 12 Apr 2019
-
Ooldea. Final report at licence full surrender, for the period 2/7/2015 to 12/4/2019.
EL 5639, centred ~210 km north-west of Ceduna, was acquired by Iluka’s New Commodities team in 2015 as part of its strategy to explore for possible Voiseys Bay style magmatic nickel, copper and platinum group metallic mineralisation which might be...-
Document
Published: 29 Apr 2019
-
RB 2002/00031 Musgrave Block, central Australia. Regional geology from interpretation of airborne magnetic data.
A regional geological interpretation of newly-acquired magnetic data for the majority of the Musgrave Block (central Australia) has been compiled at 1:250 000 scale. This report outlines the methodology and results of interpretation. Highlights of...-
Document
Published: 01 Aug 2002