-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Mt Craig Critical Minerals Project. Final report, Project ADI RD03-411 [Accelerated Discovery Initiative Round 3, 2022]. Morgan Creek Prospect Drilling and Geophysics Programs, April 2023.
This ADI funded programme consisted of exploration drilling, geophysics programs and aboriginal employment relating to critical mineral exploration conducted over the Mt Craig Project in the Flinders Ranges of South Australia. ADI funded activities...-
Document
-
Freeling Heights (part of Gunsight Project). Progress and partial surrender reports for the period 7/1/1983 to 6/1/1984.
Evaluation of previous investigations, and geochemical sampling of an Ordovician granite intrusion in the Valley Bore area, particularly for pegmatitic tin-tantalum mineralization, has located only low order anomalous values. Some restricted...-
Document
-
Victory Downs. Progress and final reports for the period 10/6/1968 to 9/6/1970.
Government-prompted company exploration for orthite and related rare earth and other minerals in an area of the eastern Musgrave Ranges included an aerial inspection of quartz pegmatites, plus ground studies and sampling. Geochemical and detrital...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Cowell (latterly part of the Cowell JV Project). Annual reports for the period 7/11/2008 to 6/11/2011.
No field work was undertaken during licence Year 7, but Stellar instead did a review of the Cowell area's prospectivity for Tertiary palaeochannel-hosted sedimentary uranium mineralisation. Previous drilling data for the local Pirie Basin sediments...-
Document
Published: 05 Dec 1911
-
Granite Downs. Progress and final reports for the period 28/8/1969 to 22/10/1970.
Field reconnaissance and assessment of surface mineralisation, regional geological mapping and geochemical sampling, detailed ground magnetic and radiometric surveying, and shallow vertical percussion drilling (5 holes, total 491 feet) were carried...-
Document
Published: 22 Sep 1970
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Alberrie Creek (part of the Willouran Ranges Project). Annual reports plus final report to licence full surrender, for the period 9/7/2012 to 22/11/2019.
An area centred ~55 km west of Marree has been explored for possible buried economic stratiform copper and magnesite mineralisation. During the first licence year, no work occurred while Native Title land access negotiations were in progress. During...-
Document
Published: 26 Nov 1919
-
Kalkaroo and Benagerie. Final report on an investigation of rare earth element mineralisation in the Benagerie Dome, Project ADI RD01-105 [part of Accelerated Discovery Initiative Round 1, 2021].
The primary objective of the subject successful Accelerated Discovery Initiative (ADI) project proposal has been to determine the nature, extent and economic potential of rare earth elements (REE) mineralisation in the Benagerie Ridge portion of the...-
Document
-
Mount Gee. Progress reports and final report to licence full surrender, for the period 11/5/1990 to 10/12/1993.
Exploration for uranium and associated copper, gold and rare earth elements undertaken in the Mount Painter area comprised the acquisition of a helicopter-borne magnetic and radiometric survey during July 1990, plus the conduct of a stream sediment...-
Document
-
Kalabity - Old Boolcoomata area [= Olary 'A' Farmin Block]. Progress reports to licence expiry/renewal for the period 14/1/1971 to 13/1/1972.
As part of exploration for economic metallic mineral deposits within an area of partly outcropping Precambrian calcsilicate rocks present on Kalabity Station, a field reconnaissance of all known mineralised areas was carried out initially. The...-
Document
-
[East of] Lake Frome area (part of the Benagerie Ridge JV Project). Annual reports and final report to licence expiry/full surrender, for the period 10/10/2002 to 9/10/2012.
EL 3019 located in the Curnamona Province of South Australia covers a portion of the north-south trending buried palaeotopographic high known as the Benagerie Ridge. The north-south elongate licence area occupies part of Quinyambie Station, and is...-
Document
-
Coober Pedy. Annual reports and final report to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2009.
In a search conducted over an area lying beyond but near the southern edge of Coober Pedy township, looking primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits of predominantly IOCG type, the licensee Nova...-
Document
Published: 31 Jan 1910
-
Mount Norwest (part of the Willouran Ranges Project). Annual reports to licence expiry/cancellation, for the period 8/9/2010 to 7/9/2013.
A search primarily directed at assessing the stratiform copper and magnesite potential of an area centred 50 km south-west of Marree has consisted mainly of office studies comprising the collection and review of open file geoscientific data. Early in...-
Document
-
Mount Craig (part of the Torrens Project). Annual report and final report to licence expiry/full surrender, for the period 1/8/2011 to 31 July 2013.
A search primarily directed at assessing the stratiform copper potential of a small area centred 16 km north-east of Cradock consisted only of office studies comprising the collection and review of open file geoscientific data.-
Document
Published: 17 Nov 1913
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
Harris Bluff. Annual reports plus final report to licence expiry/full surrender, for the period 21/6/2006 to 18/10/2015.
An area located immediately north of Lake Gilles and centred on Harris Bluff in the Uno Range was taken up to explore for possible buried unconformity style uranium mineralisation which could have formed at the base of the Corunna Conglomerate, and...-
Document
Published: 29 Sep 1915
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1977 to 10/8/1979.
At the commencement of the term of the subject licence, exploratory/appraisal diamond drilling using a single rig was continued on the Olympic Dam gravity anomaly by the licensee for gathering more geological information to use to try to understand...-
Document
-
RB 2016/00027 The Gluepot Granite: CA-TIMS geochronology and constraints on the timing of deformation on northeastern Eyre Peninsula.
The Gluepot Granite is a heterogeneous granite comprising coarse-grained porphyritic granite and medium-grained equigranular granite, as well as late stage pegmatite and aplite phases. It occurs as a large pluton intruding the c. 1755 Ma Moonabie...-
Document
Published: 01 Jun 2017