-
RB 92/00039 Kingoonya bedrock drilling 1991.
36 reverse circulation drillholes totalling 1448 m (average depth 40.2 m) were drilled to determine the bedrock geology and geochemistry below sedimentary cover, in selected locations on the KINGOONYA 1:250,000 mapsheet area that had been recommended...-
Document
Published: 01 May 1992
-
Roxby Hill. Annual and final reports to licence surrender for the period 6/2/2006 to 13/11/2008.
In a search for possible economic iron oxide - associated copper-gold mineralisation buried under deep cover to the south-west of the Olympic Dam deposit, a semi-detailed gravity survey consisting of 302 stations was read at 800 m intervals on 1.6 km...-
Document
Published: 09 Mar 1909
-
Bookabie. Annual reports to licence expiry/full surrender, for the period 8/10/2013 to 7/10/2016.
An area centred ~85 km west-northwest of Ceduna has ben explored for possible buried Ni±Cu±Co±Cr±PGE mineralisation of either Thomson Nickel Belt or Nova-Bollinger deposit styles, that may be associated with ultramafic–mafic rocks at four prospects...-
Document
Published: 07 Nov 1916
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 30/7/2003 to 6/10/2009.
The subject EL 3112 ground represents the continuation of tenure by Gunson Resources, over the same area, from its former EL 2516 Yeltacowie (for which see the relevant licence reports previously released in Envs 9530 and 9715). This replacement...-
Document
-
Heartbreak Hill. First partial surrender report, for the period 27/9/1996 to May 1999.
Regional and infill calcrete sampling over two now relinquished licence sub-areas lying respectively 10 km north and 25 km south-east of Tarcoola identified minor, slightly elevated Au and Cu values in both areas. Follow-up rock chip sampling and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Ive Project. First annual report, for the period 1/1/2016 to 31/12/2016.
The “Mt Ive Project” forms the western part of the “Gawler Ranges Project”. The “Gawler Range Project” comprises 11 tenements covering a total area of 4,749 km2 in northern Eyre Peninsula. All 11 tenements are licenced to and operated by Menninnie...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2009 to 6/10/2013.
New work undertaken on EL 4187 during the 2009-2010 licence year has included: • Ongoing documentation and interpretation of MGD 55 & 56 • Drilling of MGD57 to 1243 m at Emmie Bluff prospect • Down hole EM and IP logging of MGD57 •...-
Document
-
Coondambo. Progress reports and final report to licence full surrender,for the period 3/5/1977 to 3/2/1978.
As part of a regional search for possible buried Olympic Dam type, Middle Proterozoic basement-hosted base and precious metal deposits, a prominent aeromagnetic anomaly located just to the east of Pinery Dam was delineated and its source modelled by...-
Document
-
Data release - as updated : Mount Paisley (part of the Mount Woods JV Project). Annual reports to the commencement of project licences' joint reporting, plus final report to licence expiry/full surrender, for the period 23/3/2000 to 10/5/2014.
Possible iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits which may have formed within buried Proterozoic basement are being targeted in an area centred about 145 km south-east of Coober Pedy and 100 km north-west...-
Document
Published: 24 Jun 1914
-
RB 2007/00011 Original full content version of] OOLDEA, South Australia, [geological map] sheet SH52-12. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The OOLDEA 1:250 000 map area, in the far west of SA, includes portions of the Maralinga Tjarutja Aboriginal Lands, Maralinga Prohibited Area, and Nullarbor Regional Reserve. It is traversed by the Trans-Australian Railway. There is no significant...-
Document
Published: 01 Jun 2007
-
RB 2007/00006 The geology and mineral potential of the PORT AUGUSTA [mapsheet] area, eastern Gawler Craton.
The PORT AUGUSTA 1:250,000 mapsheet area covers the north-eastern part of the Eyre Peninsula, the northern Spencer Gulf and the south-western Flinders Ranges, and extends from latitude 32°00'S to 33°00'S and longitude 136°30'S to 138°00'S. The main...-
Document
Published: 01 Apr 2007
-
Lake Ross, Lake Hanson, Kowal and Gosses areas (Glendambo Project). Annual and final reports for the period 18/3/97 to 3/4/2000.
Interpretation of existing geophysical and drillhole data, including core chip re-assaying and petrography, was carried out for four areas located approximately 60 km north-west of Woomera. Interpreted geophysical features of the basement are...-
Document
-
Mount Moseley. Annual and final reports for the period 24/12/96 to 23/12/98.
Exploration targets were gold and base metals in Adelaidean and basement rocks, 20 km southwest of Mount Gunson. Regional and infill calcrete sampling did not reveal any areas worthy of follow up, and geophysical interpretation indicated depths to...-
Document
-
Eurilla Dam. Annual reports and final report to licence expiry/full surrender, for the period 16/1/1997 to 15/1/2001.
An area spanning the western margin of Lake Gilles, 50 km north-east of Kimba, was investigated for possible stratiform, shear-hosted, skarn-related and Olympic Dam - style mineralisation. Initial regional calcrete geochemical sampling returned...-
Document
Published: 29 Mar 1901
-
Mount Miccollo. Annual reports to licence expiry for the period 9/8/93 to 8/8/95.
Rock chip sampling of Proterozoic hydrothermally much altered ?volcanic basement outcrop in the vicinity of Mt Miccollo, 50 km west-northwest of Iron Knob, returned anomalous Cu, Pb, Zn and As values. A pronounced circular aeromagnetic anomaly,...-
Document
Published: 02 Nov 1995
-
Sloane Hill East. Annual and final reports to licence expiry/full surrender for the period 19/4/2007 to 18/4/2009.
Exploration for possible economic IOCGU mineralisation which was carried out in an area located approximately 22 km south-east of the Prominent Hill mine has consisted of the acquisition of a detailed gravity survey that covered the entire tenement...-
Document
Published: 05 Jun 1909
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 1906
-
Lake Finniss. Annual reports to licence expiry/full surrender, for the period 14/3/2000 to 13/3/2005.
Proterozoic iron oxide - associated Cu-Au deposits of Olympic Dam type, and possible Yilgarn Craton style Archaean Cu-Ni mineralisation in ultramafic rocks, Pt-Cr mineralisation in layered mafic-ultramafic complexes and Cu-Pb-Zn in acid volcanic...-
Document
-
Fred Swamp. First partial surrender report, for the period 12/7/1993 to 7/5/1996.
Diamond exploration undertaken in the Woomera area comprised an aeromagnetic / radiometric survey and gravel sampling. With the exception of three weak anomalies, all aeromagnetic features on checking were of cultural origin. A significant potassium...-
Document
Published: 08 Jun 1996
-
ExpNotes OOLDEA: Explanatory Notes OOLDEA
There is no abstract created for this record-
Document