-
RB 78/00038 Report on drilling in the Tallaringa palaeodrainage system.
Programme of fully cored shallow holes. Aim was to investigate stratigraphy of the palaeochannels, relate this to the geology and evaluate economic potential of channel confined sediments, to test for lignite, sedimentary uranium, alluvial gold, heavy...-
Document
Published: 01 Jan 1978
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Dunn Hill, Wallala Hill and Mount Centre. Progress report plus final report to licence full surrender, for the period 14/2/1989 to 16/6/1989.
TARGET: Possible heavy mineral placer or sedimentary uranium deposits within the Narlaby Palaeochannel in the Nunjikompita - Hiltaba areas on western Eyre Peninsula. EXPLORATION: Reverse circulation drilling traverses (50 holes totalling 1213 m),...-
Document
Published: 31 Jul 1989
-
Garford Homestead. Progress and final reports to licence expiry for the period 12/4/1983 to 11/4/1984.
After a regional review of the absorbent clay mineral potential of known palygorskite and attapulgite - bearing Middle Tertiary palaeochannel sediments in an area centred 110 km south-west of Coober Pedy, a possibly economic partly-exposed attapulgite...-
Document
Published: 21 Jun 1984
-
Wirrulla, Cungena, Mortana, Kolballa and Calca. Joint progress reports and joint final report to licences' joint full surrender, for the period 18/8/1989 to 17/12/1991.
TARGET: Possible heavy mineral sands emplaced within Tertiary sediments in the Wirulla, Poochera, Inkster and Streaky Bay areas. EXPLORATION: Reconnaissance 10-15 km spaced and infill 100 m spaced reverse circulation drilling to pre-Tertiary basement...-
Document
-
Wilkinson Lakes. Progress reports to licence expiry/full surrender, for the period 14/7/1978 to 5/10/1981.
TARGET: Sedimentary uranium in Tertiary paleochannels draining the western margin of the Gawler Craton, and in sediments of the Wilkinson Trough. Base metals in Proterozoic basement rocks. EXPLORATION: Rotary drilling (48 holes totalling 3213 m),...-
Document
Published: 06 Apr 1981
-
Drilling programme no. 1. EL 413, Wilkinson Lakes area, SA.
A total of 48 holes (3213 metres) included 21 holes to define the structure and position of the Karari Fault zone, 19 holes across Tertiary palaeochannel systems, 1 hole on the side of a palaeodrainage channel to test for water for Commonwealth Hill...-
Document
Published: 01 Jan 1979
-
RB 00855 Maralinga hydrogeological and geotechnical site investigation - Stage 1.
Hydrogeological and geotechnical information is provided for a comparative cost study of competing proposals for the permanent disposal of soil lightly contaminated with nuclear materials. A total of 19 open boreholes and 6 cored boreholes were...-
Document
-
Mulga Well. Annual reports to licence expiry/full surrender, for the period 22/6/2004 to 21/6/2009.
An area located close to the western margin of the Stuart Shelf, approximately 90-120 km south-west of the Olympic Dam deposit, and extending parallel to it for 65 km, was taken up by Marathon Resources (Marathon) to explore for possible economic IOCG...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
Tallaringa South and Tallaringa North (part of the Eucla Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 15/8/2005 to 14/8/2010.
As part of a regional exploration project targeting possible economic secondary, roll-front style uranium deposits within buried Tertiary sediments of the Anthony Palaeochannel and its several tributaries, two areas located approximately 130-160 km...-
Document
-
Wynbring (part of the Eucla Project). Annual reports and final report to licence expiry/full surrender, for the period 23/5/2005 to 22/5/2010.
As part of a regional exploration project targeting possible economic buried secondary, roll-front style uranium deposits within Tertiary sediments of the Wynbring Palaeochannel and its several tributaries, an area located approximately 75 km...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
Venus Bay. Third partial surrender report, for the period 27/7/1994 to 26/1/1998.
Diamond and gold exploration undertaken on the two relinquished ground portions located north-west and east of Venus Bay on Eyre Peninsula, which total 530 square km in area, have comprised heavy mineral sampling, heavy mineral grain microprobing,...-
Document
-
Lock. Progress and final reports to licence surrender for the period 1/10/1970 to 19/9/1971.
As part of a regional search for possible economic deposits of sedimentary uranium in the central Eyre Peninsula region, a reconnaissance open hole rotary drilling programme (8 holes for 1715 feet) was undertaken in November 1970 along the eastern...-
Document
-
Sandstone [Outstation] (part of the Gawler Joint Venture Project's Central Tenement Block). Data release made in lieu of submitting a second partial surrender report at licence expiry/renewal : annual reports for the period 9/9/1994 to 13/10/2004.
An area located 140 km north-west of Tarcoola was taken up to explore for possible economic high grade occurrences of palygorskite clays formed in Tertiary palaeochannels and associated playa lakes. This was a response to a discovery of palygorskite...-
Document
Published: 11 Jan 2004
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 2009
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 2019