-
Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
RB 81/00099 Stuart Highway, Baker Well to Gosses section. Drilling for construction water.
13 of 38 wells were completed as production wells. Pump testing showed that 6 were capable of yielding 50 kl/day or more for 2 year period. Salinity was in excess of 10 000 mg/L TDS except near Glendambo where water from 4000 to 8000 mg/L was...-
Document
Published: 01 Jan 1982
-
RB 81/00097 Stuart Highway reconstruction, Pimba to Baker Well section. Water well drilling program.
4 of 7 wells were successfully drilled near Wirraminna Rail Siding and should be adequate for highway requirements for compaction water. Groundwater quality in all cases is saline (over 16000 mg/L TDS).-
Document
Published: 01 Jan 1982
-
RB 81/00080 Proposed township near Glendambo. Water supply project.
The area close to well 6036WW122 offers the best site for developing water supply for small town on the Coondambo to Gosses section of the Stuart Highway. Long term yields will depend on the size and frequency of recharge events in a small swamp. This...-
Document
Published: 01 Jan 1981
-
RB 79/00066 Sampling and measurement of mound springs, Great Artesian Basin, South Australia. Progress report no. 3, WARRINA, OODNADATTA, BILLAKALINA, CURDIMURKA sheets.
This report virtually completes a systematic survey of mound springs around the south-western edge of the Great Artesian Basin in South Australia. There are as yet about 20 springs left unsampled, mostly on BILLAKALINA, in the Francis Swamp and...-
Document
Published: 01 Jan 1979
-
RB 89/00066 GAB field survey - 1986/1987.
Data collected from 116 flowing and 24 non-flowing wells included shut in pressure, temperature, flow rate, pH, headworks condition and full chemical analyses of water samples. An observation network is to monitor controlled flowing wells every 2 years.-
Document
Published: 01 Aug 1989
-
RB 90/00014 Explanatory Notes for the TALLARINGA 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1991
-
RB 89/00031 Palynological analysis of Early Cretaceous sediments east of the Peake and Denison Ranges.
Samples of calcareous concretions, mudstone, siltstone and sandstone were assigned an Aptian age.-
Document
Published: 01 May 1989
-
McDouall Peak Station (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 70 km south of Coober Pedy, commenced with a re-assessment of open file airborne magnetic data in an...-
Document
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
Wintinna Coalfield hydrogeological study.
This report presents a description of the hydrogeology of the Wintinna coal deposit proposed mine site area, and of the investigative work performed to acquire specific data on aquifer properties and groundwater behaviour. Two production bores were...-
Document
Published: 14 Sep 1983
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Sandstone Outstation area (part of the Central Gawler Project). Second partial surrender report, for the period 20/5/2005 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) for the subject 39 square km of relinquished portions of EL 3343, located about 70 km south-west of Coober Pedy, commenced with a...-
Document
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910