-
Mount Plantagenet. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 8/1/1982 to 7/1/1986.
Detailed base and precious metals exploration undertaken by Utah Development Company in the area of the Worumba Anticline has targeted possible stratiform Zambian Copperbelt - type deposits. Exploratory work has included 72 geochemical vertical...-
Document
-
RB 37/00039 Report on the Copper King ochre deposits (near Beltana).
The Copper King orebody, located approximately 10 miles north-northeast of Beltana township, is a massive deposit of iron carbonate, the upper portion of which has been altered by oxidation and hydration to oxides of iron. The deposit was worked...-
Document
Published: 09 Mar 1954
-
RB 76/00148 Warrakimbo micaceous haematite deposit, secn 109, Hd Barnidoota, Co. Blachford. (ML 4521 - L. Morellato).
There is no abstract created for this record-
Document
Published: 18 Nov 1976
-
RB 99/00008 Burra miners 1860 - 1865 - An index to two Burra Burra mines' copper day books, July 1860 - November 1861, October 1863 - December 1865.
Burra was the largest metalliferous mine in Australia between 1845 and 1860, and employed up to 1,000 men and boys. The workforce was predominantly Cornish, Burra being the first significant concentration of Cornish immigrants in Australia. The...-
Document
Published: 01 May 1999
-
RB 99/00031 Assessment of zinc-lead prospectivity on the Murnaroo Platform and in the Manya Trough, eastern Officer Basin, South Australia.
The Neoproterozoic to Palaeozoic Officer Basin is located on and adjacent to the northwestern margin of the Gawler Craton. Deposition of the basin began in Adelaidean time, before and during the breakup of the supercontinent Rodinia. The...-
Document
Published: 01 Dec 1999
-
Lake Everard. Annual and final reports to licence expiry/full surrender for the period 29/8/2006 to 28/8/2009.
A planned reconnaissance soil geochemical sampling survey in an area to the east of Lake Everard was not carried out due to the need to obtain an access agreement from local native title claimants and after making a negative re-assessment of the...-
Document
Published: 14 Sep 1909
-
Archaeological survey of the Wallaroo copper smelters, Wallaroo, South Australia.
There is no abstract created for this record-
Document
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-25, eastern Mabel Creek High: Big North-West Proterozoic epithermal / hydrothermal IOCG mineral prospect. Project interim and final reports.
In its successful application to PIRSA for a grant of PACE Initiative Year 4 drilling project funding, Alliance Craton Explorer announced that it had generated an extremely attractive geophysical target with potential for Mesoproterozoic basement -...-
Document
Published: 25 Nov 1907
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Ki Ki (part of the Coonalpyn Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 14/10/1999 to 17/1/2009.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated within the Cambrian Kanmantoo Trough near Ki Ki in the upper South-East, the licensee and...-
Document
Published: 23 Feb 1909
-
Mount Gunson ore controls as a basis for further exploration.
This report presents the geological setting and postulated ore controls for the Mount Gunson style of mineralisation, with an expansion on the inferred metal concentration mechanism and its quantitative feasibility. Recommendations for two optimal...-
Document
Published: 17 Aug 1971
-
The Bull engine, or direct- acting steam engine, in South Australia.
This technical report discusses the historical usage and the origin of a particular example of Cornish-invented steam powered engine technology, with reference to mining site remains and records of such engines used in South Australia, and those of...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : [south-western] Lake Torrens area. Annual reports for the period 13/10/2010 to 12/10/2012.
An area centred ~30 km north-east of Bookaloo, which is mostly located within the Lake Torrens National Park, is being explored primarily for possible buried economic IOCG style mineralisation of the type exemplified by major deposits occurring at...-
Document
Published: 05 Nov 1912