Lake Phillipson area. Progress and technical reports for the periods 23/11/1978 to 22/11/1980, and 12/2/1981 to 11/5/1982. [forms Part 2 of a SADME - compiled Lake Phillipson coal deposit data package released in December 1994].
The licensee's 1981 coal search programme at Lake Phillipson had the following objectives: - delineation of the total extent of the coal measures; - resolution of seam stratigraphy and correlation of seams between the Main and West Areas; -...-
Document
-
McDouall Peak Station (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 70 km south of Coober Pedy, commenced with a re-assessment of open file airborne magnetic data in an...-
Document
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Sandstone Outstation area (part of the Central Gawler Project). Second partial surrender report, for the period 20/5/2005 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) for the subject 39 square km of relinquished portions of EL 3343, located about 70 km south-west of Coober Pedy, commenced with a...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Report on preliminary feasibility study of use and mining of coal from deposits in an area near Lake Phillipson, South Australia.
Exploration drilling by Utah Development Co. during 1973 and 1974 in the area covered by EL 125 has outlined at least 2,000 million tonnes of medium quality steaming coal, of a quality considered to be comparable to that for coal from ETSA's Leigh...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Conference poster - [Phanerozoic] Geology of the Peake and Denison Ranges area.
This poster was exhibited to accompany a talk presented by the authors at the 1st Eromanga Basin Symposium, Adelaide, 9-11 November 1982 (the talk abstract is indexed separately).-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Noorina Dam, Birthday Hill, Codna Hill and Cadaree Hill. [Diamond exploration - sole risk and joint venture] Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 23/9/1983 to 29/5/1990.
TARGET: Possible diamonds and source diamondiferous kimberlites in the Boorthanna Trough region. EXPLORATION: Present-day drainage heavy mineral sampling for kimberlitic indicators, follow-up barrage sampling for diamonds, an aerial magnetic survey...-
Document
-
Arckaringa Basin, SA. 1984 diamond exploration report.
Evaluation of the diamond potential of the Arckaringa area, 50 km south-west of Oodnadatta, which is here considered to be a region both tectonically and geologically favourable for the past emplacement of kimberlitic intrusive bodies, has comprised...-
Document
-
Mount Denison. Progress reports and final report to licence full surrender, for the period 13/5/1991 to 22/3/1993.
Possible economic epithermal/hydrothermal uranium and base metal deposits hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks in the northern Peake and Denison Ranges were the primary targets addressed by CRA in their...-
Document
-
Todmorden area. Progress reports for the period 4/10/89 to 3/4/91.
TARGET: Diamonds. EXPLORATION: Drilling (1 rotary hole totalling 306 m) over a possible buried kimberlitic diatreme identified from seismic and gravity surveys. RESULTS: No kimberlite was intersected.-
Document
Published: 22 May 1991
-
Rawlinson Hill, Mount Sabine, Snow Hill and Billa Kalina Homestead (Stuart Shelf / Arckaringa Basin). Joint progress reports to licence expiry/full surrender, for the period 12/2/1981 to 28/4/1987.
Over the report period Agip Australia completed the drilling and geophysical logging of 39 open rotary holes totalling 3845 m to investigate if economic coal seams occur within Permian sediments of the southern Arckaringa Basin. Although the Permian...-
Document