-
Lake Gilles. Progress reports and final report to licence expiry/full surrender, for the period 2/6/1980 to 3/7/1996.
Aeromagnetic, ground magnetic and EM surveys, with follow-up rock chip, stream sediment and soil sampling, RAB drilling (688 holes, total 17,553 m) and RC drilling (12 holes, total 1149 m), have defined an extensive zone of anomalous base metal...-
Document
Published: 15 May 1996
-
Harris Bluff (Uno Station). Progress reports and final report to licence full surrender, for the period 7/9/1982 to July 1986.
Exploration undertaken over an area located 60 km west of Port Augusta targeted possible Broken Hill or Aggeneys - Gamsberg type massive Pb-Zn deposits within Early Proterozoic Hutchison Group banded iron formation metasediments, and also any Early...-
Document
-
Peachna. Progress reports, annual reports and final report to licence full surrender, for the period 22/9/1988 to 8/9/1994.
Possible economic Broken Hill - type stratiform Pb and Zn, and Middleback Range style iron ore, were targeted near Lock on central Eyre Peninsula by Western Mining Corp., who farmed-in to Stockdale's EL 1516 on March 1st, 1990 as part of a regional...-
Document
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 1904
-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 1903
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurilla, Lake Gilles, Moseley Nobs and Uno (the Northern Eyre Peninsula Project). Joint annual reports for the period 1/6/2010 to 31/5/2018.
Four tenements, which all lie within a 60 km radius to the north of the township of Kimba, and are mostly located around Lake Gilles, are continuing to be explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 30 Jul 1918
-
Mount Ive Gate. Annual reports to licence expiry/full surrender, for the period 12/7/1993 to 22/9/2001.
The area of ELs 1841/2551 (formerly EL 1568), located approximately 70 km north-west of Kimba on the northern Eyre Peninsula, was considered to be prospective for Olympic Dam type Cu-Au and Menninnie Dam style Pb-Zn mineralisation. Earlier work by...-
Document
Published: 15 Nov 1900
-
Lake Gilles (part of the East Eyre Peninsula Project). Second partial surrender report, for the period 22/12/2005 to 13/9/2016.
Approximately one-third of the southernmost sub-block 'D' of the subject EL 5109 has been relinquished to comply with expenditure commitments made for the East Eyre Peninsula Project. Activities within the now relinquished area have consisted of...-
Document
Published: 10 Oct 1916
-
Ungarra / Triple Hill. Progress reports to licence expiry/full surrender, for the period 30/3/1979 to 7/11/1983.
As part of a regional evaluation of the variably exposed Lower Proterozoic metasedimentary sequence on eastern Eyre Peninsula for possible economic pitchblende mineralisation, portion of a semi-detailed airborne radiometric/magnetic survey was flown...-
Document
-
Sheoak Hill. Progress reports to licence expiry/full surreender, for the period 15/3/1983 to 14/3/1988.
TARGET: Stratiform lead-zinc-silver mineralisation of the Broken Hill or Aggeneys - Gamsberg type, associated with banded iron formations in Early Proterozoic metasediments. EXPLORATION: Data from the 1975 joint SADME / BMR Barna 1:100 000 scale...-
Document
-
Cowell Jade Province: rock sample petrographic descriptions.
A collection of Amdel petrographic reports providing raw data for a petrogenetic study of Cowell area jade specimens and related host rocks carried out by SADME, aimed at determining geological controls on the distribution of high quality nephrite...-
Document
Published: 01 Jan 1990
-
Strawberry Hill. Progress and final reports to licence expiry for the period 4/10/89 to 3/1/94.
Exploration in the Wanilla - Cummins area searching for economic accumulations of heavy minerals in Eocene sands comprised 2 phases of aircore drilling (167 holes, total 4049 m). A resulting drill intersection yielded a 0.72% heavy-mineral...-
Document
-
Carpie Puntha and Peterlumbo. Joint second partial surrender report, for the period 14/2/1989 to 13/2/1992. Plus: Carpie Puntha and Waddikee. Joint final report to licences' expiry/renewal, for the period 14/2/1989 to 24/6/1992.
TARGET: Possible commercial Menninnie Dam type stratabound or stratiform base metal deposits in the Cowell - Kimba - Buckleboo region. EXPLORATION: Field reconnaissance and rock chip geochemical sampling of prospective areas identified from...-
Document
-
Cowell - Middleback Range and Sheoak Hill areas. Joint progress reports for the initial tenure period 15/3/1983 to 14/3/1984.
TARGET: Possible stratiform Pb-Zn-Ag mineralisation of the Broken Hill or Aggeneys-Gamsberg type associated with banded iron formations in Early Proterozoic metasediments. EXPLORATION: Regional ground magnetic surveys, geological mapping, 29 RAB...-
Document
-
Eyre Peninsula Pb-Zn data package.
Numerous Pb-Zn-Cu-Ag mines and prospects, including the promising Menninnie Dam prospect located 80 km north of Kimba, occur within graphitic, calcareous and psammo-pelitic metasediments of the Palaeoproterozoic (ca 1900-1850 Ma) Hutchison Group on...-
Document
Published: 01 Jan 1991
-
Coulta. Progress reports and annual report to licence expiry/full surrender for the period 23/2/1978 to 22/3/1979.
Exploration for possible economic vein-style primary uranium deposits hosted within basement rocks in a licence area located 55 km west-northwest of Port Lincoln has consisted of detailed (1:10,000 scale) geological mapping over a 650 square km area,...-
Document
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Yardea (part of the Gawler Project). Final report at licence full surrender, for the period 22/6/2012 to 31/1/2013.
An area centred about 27 km north-west of Kimba was selected mainly to explore the basement for Menninnie Dam style base metal mineralisation, with the block's NW portion also being considered prospective for epithermal precious metal deposits of...-
Document
Published: 31 Jan 1913
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-30 - Trafford Resources Ltd, Wilcherry Hill Project, Oxy's Bore prospect magnetic anomaly IOCG target. Drilling project final report.
Trafford Resources Ltd ('Trafford'), the owner since March 2007 of the seven exploration licences comprising the Wilcherry Hill Project, has as its primary focus exploration of these tenements for economic precious and base metal deposits. The...-
Document
-
RB 2016/00001 SHRIMP U-Pb geochronology data for northern Eyre Peninsula, 2014–2016.
As part of the current mapping programme aiming to produce a second edition of the PORT AUGUSTA 1:250k geological map sheet, 8 rock samples from outcrops located on this map sheet area and on the adjoining WHYALLA 1:250k map sheet area were...-
Document
Published: 01 May 2017