Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
RB 80/00054 Coongra no. 1 well completion report.
Aim was 1) to determine whether Permian sediments extended across the northern Muloorina Ridge, and thereby connected the Arckaringa and Pedirka basins; 2) to identify basement high-speed seismic refractor. The well was abandoned in Early Cretaceous...-
Document
Published: 01 May 1980
-
RB 80/00116 Mesozoic stratigraphy of the Frome Embayment.
This study covers a southern lobe of the Eromanga Basin known as the Frome Embayment, which extends W-E from the Flinders Ranges to the Barrier Ranges, and southwards from the vicinity of Moolowatana Station to the Scott Hill-Mundaerno Hill region....-
Document
Published: 01 Feb 1980
-
RB 91/00052 Ruby Hill 1. Well completion report.
SADME stratigraphic drillhole Ruby Hill 1 was sited 10.4 km east of William Creek, and was designed to penetrate Early Cretaceous rocks of the Eromanga Basin and to sample pre-Mesozoic basement. It intersected 191 m of the Eromanga Basin sedimentary...-
Document
Published: 01 May 1991
-
McDouall Peak Station (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 70 km south of Coober Pedy, commenced with a re-assessment of open file airborne magnetic data in an...-
Document
-
Gina Outstation (part of the Central Gawler Project). Final report at licence expiry/full surrender, for the period 20/5/2004 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) on the subject EL, located about 30-45 km east of Commonwealth Hill, commenced with a re-assessment of open file airborne magnetic data...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Sandstone Outstation area (part of the Central Gawler Project). Second partial surrender report, for the period 20/5/2005 to 19/5/2009.
Exploration for diamonds undertaken by Flinders Mines Ltd (as part of the JV agreement made with Tasman Resources) for the subject 39 square km of relinquished portions of EL 3343, located about 70 km south-west of Coober Pedy, commenced with a...-
Document
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Abminga Diamond Project. Data release made at licence renewal [and project cessation]: progress reports and annual reports for the period 25/10/1993 to 17/3/2004.
The Abminga Diamond Project, undertaken by Caldera Resources NL, was granted exploration project status, including permission for EL joint reporting, in July 1996. This event followed up to two years of work by other operators on a number of...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 2 of 2 ].
After licence management was returned to Reedy Lagoon for a third time, the licensee studied Cauldron Resources' 1996 aeromagnetic data and identified an additional three magnetic anomalies (EC23, 26 and 27) possessing possible kimberlite traits....-
Document
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
Data release - as updated : Pound Creek. Annual reports and final report to licence full surrender, for the period 1/12/2010 to 16/11/2017.
South Australia Ludi Mining Pty Ltd (“SALM”) acquired Exploration Licence 4619 in the vicinity of Coward Springs to explore it for large Mesoproterozoic copper/gold/uranium deposits analogous to Olympic Dam, which is located approximately 120 km to...-
Document
Published: 21 Nov 1917
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910