-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
Port Lincoln. Progress and final reports to licence surrender for the period 15/4/1968 to 28/2/1970.
As part of uranium exploration being carried out over the oldest basement rocks forming inliers to the south-eastern Gawler Craton, an airborne scintiilometer survey was flown across the Port Lincoln district during November-December 1968 along...-
Document
-
Carpie Puntha and Peterlumbo. Joint second partial surrender report, for the period 14/2/1989 to 13/2/1992. Plus: Carpie Puntha and Waddikee. Joint final report to licences' expiry/renewal, for the period 14/2/1989 to 24/6/1992.
TARGET: Possible commercial Menninnie Dam type stratabound or stratiform base metal deposits in the Cowell - Kimba - Buckleboo region. EXPLORATION: Field reconnaissance and rock chip geochemical sampling of prospective areas identified from...-
Document
-
Corunna. Progress and final reports for the period 22/7/91 to 21/7/92.
TARGET: Broken Hill or Aggeneys - Gamsberg type stratiform base metal deposits within the metamorphosed Palaeoproterozoic Hutchison Group chemical sediments in the Corunna area, possibly hosted by geochemically anomalous carbonate and silicate facies...-
Document
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
Coulta. Progress reports and annual report to licence expiry/full surrender for the period 23/2/1978 to 22/3/1979.
Exploration for possible economic vein-style primary uranium deposits hosted within basement rocks in a licence area located 55 km west-northwest of Port Lincoln has consisted of detailed (1:10,000 scale) geological mapping over a 650 square km area,...-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 1903
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
RB 2006/00004 Crustal evolution of the Gawler Craton, South Australia: Application of the TerraneChron technique to detrital zircon from modern stream sediments.
This report presents the results of a Terranechron [registered brand name for this proprietary technique] study of detrital zircons from modern stream sediments of the Gawler Craton. The Terranechron approach involves obtaining uranium - lead decay...-
Document
Published: 01 Feb 2006
-
RB 2017/00011 A Mesoproterozoic advanced argillic alteration system: 40Ar/39Ar thermochronology from Nankivel Hill, Gawler Craton.
The Nankivel Dam prospect, located in north-western Eyre Peninsula, contains alunite, pyrophyllite, dickite, topaz and diaspore alteration of its rocks that is thought to be consistent with mineral assemblages found in advanced-argillic alteration...-
Document
Published: 01 May 2017
-
Aroha. Progress reports and final report to licence expiry/full surrender, for the period 27/5/1980 to 26/5/1982.
As part of Esso's continued exploration programme for buried Late Proterozoic stratiform uranium deposits in the Uno - Corunna area, detailed geochemical, petrological, thermoluminescence and lead isotope studies were performed on samples obtained by...-
Document
-
RB 2016/00001 SHRIMP U-Pb geochronology data for northern Eyre Peninsula, 2014–2016.
As part of the current mapping programme aiming to produce a second edition of the PORT AUGUSTA 1:250k geological map sheet, 8 rock samples from outcrops located on this map sheet area and on the adjoining WHYALLA 1:250k map sheet area were...-
Document
Published: 01 May 2017
-
Roxby Downs West. Annual reports and final report to licence full surrender, for the period 20/10/2005 to 13/5/2009.
EL 3428, located 17 km south-west of the Olympic Dam deposit and 5 km south of the Acropolis prospect, was taken up by Uranium Exploration Australia (UXA) primarily to explore for copper-uranium-gold-silver-rare earth element (Cu-Au-U-REE+/-Ag)...-
Document
Published: 05 Jun 1909
-
RB 82/00086 Geochronology of the Gawler Craton, South Australia.
During the past 15 years, a major investigation (553 Rb-Sr and 100 K-Ar analyses) were undertaken to determine the Archaean - Proterozoic stratigraphic, magmatic and tectonic history. The isotopic dates define 3 broad groupings, Sleafordian Orogeny (2...-
Document
Published: 01 Nov 1982
-
RB 2020/00026 PACE Copper Gawler Craton Airborne Survey, Region 6, Gairdner - enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Oct 2020
- ZIP,
-
Gawler Province regional geology 3D Model (3D version 1).
The Gawler Province 3D Geological Model is the second product of PIRSA's early 3D modelling trials conducted using 3D GeoModeller software. The work began with identifying the statigraphic units that were to be modelled. Due to the regional scale of...-
Model
- ZIP,