-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-19, Murninnie mine area (north-eastern Spencer Domain) IOCG mineral prospects. Project final report.
The Murninnie Cu-Bi-Au deposit and mine environs, located approximately 40 km south-west of Whyalla, have not been seriously explored in more than 50 years due to quarantining of the deposit under Private Mine title. The lode-style deposit is exposed...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Point Paterson. Annual and final reports to licence expiry/full surrender for the period 2/6/2003 to 1/6/2006.
Evaluation of the feasibility of re-establishing salt production facilities at the abandoned solar salt works on the tidal flats at Point Paterson, 15 km south-east of Port Augusta, has been undertaken by the current local SA major salt producer...-
Document
-
Mount Willoughby. Annual reports to licence expiry/full surrender for the period 11/1/2001 to 10/1/2005.
Exploration for opal, carried out in an area of the Stuart Range located approximately 130 km north-northwest of Coober Pedy, has included a compilation of geological and opal occurrence data, photogeological interpretation of aerial photographs,...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-06, Mingary area stratiform, Broken Hill type base metal mineral prospects. Project final report.
Historic drilling undertaken on the NSW side of the state border with SA, adjacent to EL 2820, has encountered quartz-gahnite, meta-iron formation and meta-amphibolite rock types that have been correlated with the highly base metal - prospective...-
Document
-
Weedina coal deposit, Arckaringa Basin. Mining proponent's submission to FEAC, including supporting geological data.
In June 1986 Cyprus Australia Coal Co., a wholly-owned subsidiary of a large American coal producer and marketer then holding exploration licences over the Weedina coal deposit in the far north of South Australia, submitted to the South Australian...-
Document
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
Investigation into public risks from potential landfill gas migration and abandoned underground clay mine workings in the Saint Agnes district of Adelaide.
Field investigations including drilling and soil gas sampling, carried out as part of a subsurface hazard assessment for a parcel of land at Saint Agnes, did not indicate any significant risks to an intended building development.-
Document
Published: 27 Feb 1903
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-25, eastern Mabel Creek High: Big North-West Proterozoic epithermal / hydrothermal IOCG mineral prospect. Project interim and final reports.
In its successful application to PIRSA for a grant of PACE Initiative Year 4 drilling project funding, Alliance Craton Explorer announced that it had generated an extremely attractive geophysical target with potential for Mesoproterozoic basement -...-
Document
Published: 25 Nov 1907
-
Koonunga limestone prospect (near Nuriootpa). Final technical and rehabilitation report on exploration drilling, for the period 6/6/2005 to 5/4/2006.
The Koonunga limestone prospect occurs within the Cambrian Kapunda Marble, which forms part of the Kanmantoo Trough metasedimentary sequence deposited on the eastern side of the Adelaide Geosyncline. The limestone outcrop of interest is located...-
Document
-
Nankabunyana Creek. Final report to licence surrender for the period 10/9/2001 to 19/4/2004.
Exploration for Neoproterozoic to Palaeozoic sediment-hosted base metal deposits and possible buried Olympic Dam style deposits was carried out over an area located approximately 20 km west of Copley, north of and along strike from the Ediacara Range....-
Document
Published: 23 Mar 1905
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 1 of 2 - a very long abstract is split between these two parts].
Exploration of a long-held tenement package in the northern Gawler Craton was directed primarily at gold and also at platinum group metals, in specific work programmes executed under separate early joint venture arrangements made with Gawler Gold and...-
Document
Published: 10 Jan 1907
-
Kanmantoo. Data release made in lieu of submitting a first partial surrender report at licence renewal [part] : progress reports for the period 28/4/1989 to 27/4/1992. [Index Part 1 of 3].
Exploration for gold in the eastern Adelaide Hills, in an area of Cambrian Kanmantoo Group sediments stretching from Kanmantoo in the south to Mount Rhine in the north, was undertaken initially by licence farminee East West Minerals utilising regional...-
Document
Published: 02 Oct 1992
-
Preliminary feasibility study for the Wintinna Coal Project.
This report sets out the results of a pre-feasibility study carried out for the Wintinna Coal Project in South Australia. Contained in it are a description of the facilities and preliminary cost estimates for the development of the project. The study...-
Document
-
Summary of the structural setting of the Perseverance mine area, Tarcoola.
There is no abstract created for this record-
Document
Published: 31 Jul 1993
-
Geological report on the Mount Mary mine.
Copper mineralisation at the Mount Mary workings is restricted to a large E-W trending fault that emanates from the Blinman Diapir. Minor cross-shear fractures along this fault are filled by quartz-siderite veins that carry malachite plus some...-
Document