-
Cultana. Annual reports to licence expiry/full surrender, for the period 13/9/2012 to 12/9/2017.
An area centred ~50 km south-west of Port Augusta has been explored for possible economic buried VHMS or porphyry style copper mineralisation and for primary uranium mineralisation hosted by basement rocks within this part of the southern portion of...-
Document
Published: 28 Nov 2017
-
Wompinie (part of the Drew Hill Joint Venture Project). Progress and annual reports plus final report to licence expiry/full surrender, for the period 24/11/1995 to 5/12/2008.
Exploration for Kalkaroo or Portia style copper-gold deposits, and for Broken Hill type stratiform lead-zinc-silver deposits, both possibly formed within the Palaeoproterozoic basement intrusive rocks and high grade metasediments in an area lying...-
Document
Published: 14 May 2009
-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 2009
-
Data release [made at SA Director of Mines' discretion] : Algebuckina. Annual reports for the period 3/8/2004 to 2/8/2008.
An area surrounding the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, is being explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 20 Oct 2008
-
Yellabinna. Annual reports and final report to licence expiry/full surrender, for the period 9/5/2005 to 10/10/2013.
An area with poor basement outcrop located approximately 110 km north-east of Ceduna and 40 km south-west of Tarcoola, which lies wholly within the eastern part of the Yellabinna Regional Reserve, is being explored primarily for possible economic...-
Document
Published: 28 Oct 2013
-
Whymlet (part of the Mintabyng Project). First partial surrender report, for the period 29/11/2012 to 2/6/2015.
In late November 2012, three adjoining areas in the central Gawler Craton were taken up by Woomera Exploration Limited (WEX), an unlisted public company, for the purpose of minerals exploration. Within the subject licence area which is centred ~30 km...-
Document
Published: 16 Jun 2015
-
Coomandook, Kingston (South-East), Padthaway and Coorong [East] (the Padthaway Project). Joint first partial surrender report, for the period 27/3/2014 to 26/3/2015.
A compilation and review of existing geological, geochemical and geophysical data has indicated that the Padthaway region is fertile for volcanogenic massive sulphide (VMS) style mineralisation. VMS terrains typically contain clusters of deposits,...-
Document
Published: 25 May 2015
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 2011
-
Data release - as updated [made at SA Director of Mines' discretion] : Bagot Well North, Tarnma, Bagot Well and Australia Plains (the Eudunda Group of tenements). Joint annual reports for the period 5/10/2009 to 4/8/2017.
As part of a renewed search for possible buried economic volcanogenic or epigenetic stratiform copper oxide or copper carbonate deposits, thought to be associated with poorly exposed fault structures and related hydrothermal alteration of Adelaidean...-
Document
Published: 19 Sep 2017
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). First partial surrender report, for the period 2/7/2007 to 1/7/2017.
Five small portions of the subject licence, with a combined total area of 143 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 2017
-
Data release [made at SA Director of Mines’ discretion] : Deception Hill. Annual reports, for the period 12/8/2015 to 11/8/2018.
An area centred ~25 km south-southwest of Tarcoola is being explored for possible buried epithermal/hydrothermal copper-gold and magmatic copper-nickel-PGE mineralisation which could have formed within Archaean and Proterozoic basement rocks. During...-
Document
Published: 09 Oct 2018
-
Warriner Creek and Trumpeter (part of the Lake Eyre Joint Venture Project). Annual reports plus later combined annual reports to licences' joint full surrender, for the period 20/12/1999 to 22/9/2010.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
Published: 05 Aug 2010
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 2016
-
Peltabinna Hill. Annual reports, plus final report to licence expiry/full surrender, for the period 2/5/2013 to 1/5/2017.
An area located along the south-south-western margin of the Gawler Ranges volcanic province has been explored for possible economic buried copper-gold and/or base metal mineralisation which might have been emplaced during the early stages of the...-
Document
Published: 29 May 2017
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 2015
-
Diesel Dam. First annual report plus final report to licence expiry/full surrender, for the period 16/11/2012 to 15/11/2014.
The Palaeoproterozoic Yarlbrinda Shear Zone is a broad and complex structure, which has both southwards and south-eastwards trending components that bifurcate near Tunkillia. The structure was a conduit for Mesoproterozoic hydrothermal fluids...-
Document
Published: 27 Jan 2015
-
Emu Lookout and Mount Norwest (the Northern Lake Torrens Project). Final report at licences' joint surrender, for the period 10/9/2012 to 18/3/2014.
As part of a regional brownfields exploration programme addressing the potential for discovering buried economic Olympic Dam style IOCG mineralisation, a desktop study was undertaken for the subject tenements which included the compilation and...-
Document
Published: 16 May 2014
-
Data release [made at SA Director of Mines' discretion] : Lake Gairdner North. Annual reports for the period 10/1/1997 to 2/12/2007.
Exploration for possible economic epithermal, shear-related Proterozoic gold deposits which could have formed in bedrock underlying the floor of Lake Gairdner North has consisted only of a consultant's prospectivity review and the planning of a Phase...-
Document
Published: 05 Apr 2008
-
Mount Boothby. Information status at licence expiry/full surrender, for the period 7/1/2014 to 20/2/2015 : no work performed.
There is no abstract created for this record-
Document
Published: 20 Feb 2015
-
Data release - as updated : Apoinga (latterly part of the Eudunda Group of tenements). Early annual reports for the period 5/11/2007 to 4/11/2009, plus final report at licence full surrender on 15/6/2017 [letter only].
EL 3972 Apoinga is located within the northern Mount Lofty Ranges, where bedrock comprises Proterozoic rocks of the Adelaide Fold Belt. The main prospect area within EL 3972 is the Tarnma Anticline, a N-S trending fold which is cored by Skillogalee...-
Document
Published: 20 Jul 2017