-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
RB 96/00015 Regional groundwater impacts of irrigation development in the eastern Riverland.
A regional groundwater model has been constructed of the Loxton Sands watertable aquifer in the eastern Riverland, over an area extending eastwards from Overland Corner to the State border. It is being used to quantify the salt load impacts on the...-
Document
Published: 01 Dec 1995
-
RB 96/00012 Dryland salinity investigation, Toolillie Gully. Progress report no. 1 - Drilling programme.
Dryland salinisation is degrading land and water resources of Lower Eyre Peninsula. It decreases land production capabilities, water quality, and the general aesthetics of the environment. Interdepartmental investigations into the occurrence and...-
Document
Published: 01 Apr 1996
-
RB 89/00074 Industrial and non metallic minerals - Operations in South Australia.
This data package discusses mining and processing operations of the major non metallic and industrial mineral commodities in South Australia and is of interest to those in the industry and to manufacturers and suppliers of a range of machinery and...-
Document
Published: 01 May 1989
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
False Bay (South). Progress report for the period 23/7/1970 to 22/7/1971.
No text - one plan only, depicting the location and engineering surveyor's details for a planned earth fill embankment, to be constructed within SML 449 on the seaward side of the proposed primary evaporation pond for a 360,000 tons per annum saltworks.-
Document
Published: 23 Jun 1970
-
Ashville gypsum deposits. Retention lease six-monthly combined reports for the period 14/9/1993 to 1/6/1996.
Activity on these deposits has consisted of one phase of trial mining of 600 cubic m of the best quality part of the Warnes deposit, stockpiling of the extracted gypsum-rich lakebed sediments, chemical analysis of 39 bulked samples of this stockpile...-
Document
-
Point Paterson. Annual and final reports to licence expiry/full surrender for the period 2/6/2003 to 1/6/2006.
Evaluation of the feasibility of re-establishing salt production facilities at the abandoned solar salt works on the tidal flats at Point Paterson, 15 km south-east of Port Augusta, has been undertaken by the current local SA major salt producer...-
Document
-
Point Paterson - Port Pirie area. Progress reports on work carried out prior to grant of a special mining lease, for the period June 1962 to November 1969.
The applicant proposes during the two year SML period to undertake a work and study programme to determine the economic feasibility of developing a seawater salt recovery complex on the areas applied for, which will be capable upon completion of the...-
Document
Published: 07 Nov 1969
-
Cocunda and Calca (Poochera Kaolin Project). Progress reports, annual reports, and final reports to licences' full surrender, for the period 12/5/1986 to 28/3/2002.
Kaolin, derived mainly from deep weathering of Hiltaba Suite granites, was the principal target of exploration in the area south and south-west from Poochera, near Streaky Bay on western Eyre Peninsula. Following a review made of historic drillhole...-
Document
-
Mount Neville. Information status at licence expiry, for the period 21/6/2006 to 20/6/2007 : no work performed.
There is no abstract created for this record-
Document
-
Results of limited quality testing on Lake Phillipson coal.
Analyst's reports presenting the results of small scale test work conducted on selected drill core samples of coal taken from the 'S' and 'T' seams in the West Basin deposit of the Lake Phillipson coal measures.-
Document
-
Reports on salt from southern Yorke Peninsula.
There is no abstract created for this record-
Document
Published: 01 Jan 1969
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Wilkinson. Annual reports plus final report to licence expiry/full surrender, for the period 4/1/1999 to 3/1/2002.
Possible potash and halite resources in evaporite - rich sediment sequences of the Tallaringa Trough, lying at depths that might be suitable for solution mining, were the initial targets of exploration in the Wilkinson Lakes area. Following a...-
Document
-
Evaporites in the Officer Basin.
The Officer Basin covers about 300,000 square km and is largely concealed beneath sediments of the Gibson and Great Victoria deserts in western and southern Australia. Approximately two-thirds of the Officer Basin lies in Western Australia....-
Document
Published: 07 Jan 1998
-
Lake Torrens. Progress reports to licence expiry/renewal for the period 13/4/1973 to 12/4/1975.
Continuing exploration by Delhi of the industrial salt potential of subsurface brines in the Lake Torrens basin aimed to ascertain the potential reserves of NaCl in the southern part of the lake, and to confirm the availability of suitable brine...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Preliminary report on saline minerals in Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1969
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984