-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Douglas Creek (part of the Peake and Denison IOCG Project). First partial surrender report for the period 15/11/2005 to 14/11/2006.
As part of a broad-scale search for giant iron oxide-associated copper-gold deposits being conducted by the Peake and Denison Project joint venture companies, new work done on the presently relinquished portion of EL 3446 has comprised part of a...-
Document
-
Trumpeter (part of the Mount Woods Joint Venture Project). Annual and final reports to licence surrender for the period 19/12/2000 to 29/11/2007.
Ground covering a major east-west trending shear zone in the north-eastern portion of the Mount Woods Inlier was taken up by Goldstream Mining to allow an evaluation of its IOCG - style mineralisation potential, possibly for Fe-Cu-Au occurrences of a...-
Document
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-24, M1 oreshoot deep exploratory diamond drilling, Challenger mine area. Project final report.
Dominion Gold Operations applied for PACE Initiative Year 2 funding from PIRSA in 2005 to assist with the drilling of a deep diamond hole at its Challenger gold mine. The hole 'Wildcat 2' (05CDDH0072) aimed to test for the continuation of the M1 ore...-
Document
-
Summary of the structural setting of the Perseverance mine area, Tarcoola.
There is no abstract created for this record-
Document
Published: 31 Jul 1993
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-14, Willow IOCG mineral prospect. Project interim and final reports.
Bimbowrie EL 3278 is located within the Palaeoproterozoic Olary Domain of the Curnamona Province, South Australia. The property is prospective for a variety of mineralisation styles including granite batholith primary (hard-rock) uranium, Broken Hill...-
Document
-
White Hill (part of Curdimurka Project). Data release at licence surrender (in lieu of final report), for the period 27/8/2007 to 16/4/2009.
153 ground gravity survey stations were read at 1500 m spacing across the licence as part of infill coverage to the larger regional PACE G2 Corridor Gravity Survey, the target being possible IOCG mineralisation formed along the northern margin of the...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-46, western Gawler Range Volcanic Province mineral prospects. Project interim and final reports.
An area of the Gawler Range Volcanic Province that straddles the southern portion of the Yarlbrinda Shear Zone, 80 km south of Kingoonya, and which contains mylonitised and sericite-altered Palaeoroterozoic intrusive rocks, was the target for three...-
Document
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Pinda Springs. Annual and final reports to licence expiry/full surrender for the period 20/1/2004 to 19/1/2009.
Exploration for possible economic stratabound or hydrothermal base and precious metal deposits associated with the Pinda Springs Diapir has addressed a north-easterly trending fault zone and lesser related faults that transect the diapir, on the...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
Umbum Creek (part of Peake and Denison JV Project). First partial surrender report for the period 16/4/2003 to 15/4/2005.
An area situated along the eastern, buried margin of the Proterozoic Peake and Denison Inliers is being explored for possible economic Olympic Dam type iron oxide - associated copper-gold(-uranium) deposits. Within the now relinquished portion of the...-
Document
-
Screech-Owl Creek (part of Lake Torrens Project). Final report at licence surrender for the period 14/6/2000 to 20/4/2006.
Possible economic Neoproterozoic stratiform / hydrothermal copper mineralisation hidden under Mesozoic and Recent sedimentary cover was targeted in an area located approximately 95 km north-east of Andamooka. Aeromagnetic data interpretation of some...-
Document
-
Blue Bush Dam. Information status at licence surrender, for the period 5/9/2002 to 31/12/2004 : no work performed.
There is no abstract created for this record-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Woorong Creek. First partial surrender report at licence renewal, for the period 1/6/2000 to 23/11/2006.
An area situated about 60 km west of Coober Pedy is being explored for possible economic iron oxide - associated copper-gold deposits hosted within Palaeoproterozoic basement rocks of the Mabel Creek Gravity High. A tectonic re-interpretation of the...-
Document
-
Glyde Hill. Combined first annual/final report to licence surrender for the period 29/8/2006 to 30/11/2006.
An area located immediately south of central Lake Gairdner was targeted by Newcrest for possible economic buried iron oxide - associated copper-gold (IOCG) style mineralisation associated with Mesoproterozoic lower Gawler Range Volcanics sequence...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document