-
Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Port Augusta Project. Joint annual reports for the period 8/5/2013 to 7/5/2018 and subsequent expiry/full surrender reports to 6/10/2023.
Two small adjacent areas located 25 km north of Port Augusta, on the south-eastern Stuart Shelf close to the Torrens Hinge Zone, are being explored for possible buried economic IOCG style mineralisation which could have formed within inferred deep and...-
Document
Published: 14 Jul 1918
-
Data release [made at SA Director of Mines' discretion] : Crystal Brook, Port Broughton, Port Pirie, Mundoora and Winninnowie (the Moonta North Project). Annual reports and combined annual reports for the period 19/10/2000 to 1/8/2008.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of exploration across a number of scattered Exploration Licences trending from Port Broughton in the south to...-
Document
Published: 18 Sep 1908
-
Mount Willoughby and Bloods Creek / Vaughan Hill, Mount Algoochinna, Mount Alice and Mount Randolph (the Alberga Diamond Project). Final report on surrendered ELs 2500 and 2502, plus partial surrender report for ELs 2495, 2496, 2498 and 2501.
Diamond exploration in a region north to north-west of Oodnadatta comprised heavy mineral and geochemical sampling over magnetic anomalies selected from aeromagnetic surveys and further defined by ground magnetometry. Certain of this ground was...-
Document
-
A new approach to mapping basin architecture using airborne magnetotelluric survey data - the Copper Coast Project trial. Final report, Project ADI RD02-306 [part of Accelerated Discovery Initiative Round 2, 2022].
IGO Ltd’s (IGO) Copper Coast Project is located along the eastern margin of the Gawler Craton in South Australia, and covers Proterozoic rocks of the Stuart Shelf, Torrens Hinge Zone and Adelaide Rift Complex, which form part of the Adelaide...-
Document
Published: 21 Mar 1922
-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 1918
-
Data release [made at SA Director of Mines' discretion] : Wilkatana Project. First annual report for the period 26/11/2015 to 25/11/2016 and annual reports for Kallioota to expiry 25/11/2022.
A large multi-licence project area skirting the south-eastern and southern sides of Lake Torrens is being explored for economic buried deposits of base metals. This area is considered prospective on the basis of known mineral occurrences, proximity to...-
Document
Published: 25 Nov 1922
-
Burt Lagoon, Kallioota, Emu Lookout, Mount Norwest and Hookina (the BHPB Lake Torrens Project). Joint annual reports and joint final report to licences' joint full surrender, for the period 27/6/2012 to 10/3/2015.
After BHP Billiton (BHPB) gained ownership of two of the subject exploration licences, and later was granted another three in its own right, the licence group as a whole (now called the Lake Torrens Project) continued to be explored primarily for...-
Document
Published: 01 Apr 1915
-
Parachilna, Hookina, Burt Lagoon and Kootaberra (part of the Wilkatana Project). Joint final report at licences' joint full surrender, for the period 26/11/2015 to 18/1/2018.
Following the completion of desktop studies of previous exploration data, and the conduct of a site visit to the Wilkatana Project area, it was decided that the metalliferous mineral prospectivity of basinal sediments underlying the four subject...-
Document
Published: 23 Jan 1918
-
Bute - Port Broughton area. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 7/6/1979 to 18/1/1991.
TARGET: Uranium and base metal deposits associated with Early to Middle Proterozoic basement geological structures and rock units in Spencer Gulf coastal areas east and south of Port Broughton. EXPLORATION: Aerial magnetic and radiometric surveys,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Stuart Shelf and Andamooka Opalfields (the Stuart Shelf Joint Venture Project) . Progress reports to licences' expiry/renewal, for the period 16/1/1981 to 16/6/1986. [ Index Part 3 of 3 ].
(Abstract continued): During the first quarter of 1985, diamond drillhole OFD3 was completed at TD 498 m at a site 2 km west of hole OFD2, to further investigate the magnetic high south of the Opal Field. This hole reached basement at 359 m depth,...-
Document
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 1906
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Melton. Progress reports to licence surrender, for the period 21/7/1980 to 24/5/1989.
A small area located about 20 km north-west of Port Wakefield was taken under licence by ETSA to try to secure limestone/dolomite material of suitable quality and in sufficient quantity to provide chemical additives for aiding the process of...-
Document
Published: 20 Apr 1989
-
Ediacara, Lake Torrens and Gaiger Bluff (the Torrens Project). Combined annual reports and combined final report to licences' joint surrender, for the period 30/7/2007 to 13/8/2010.
Three contiguous licence areas located 20-70 km east and north-east of Andamooka have been explored for possible epithermal/hydrothermal gold and base metal mineralisation of either IOCG style or stratabound/replacement type, hosted by inferred buried...-
Document
-
Lake Torrens Station and Hawker West (the Torrens Project). Joint annual reports, plus separate final reports to licences' respective full surrender, for the period 30/4/2003 to 1/6/2010.
Olympic Dam style copper-gold mineralisation was the target of exploration in two adjoining areas which lie about 100 km north-northeast of Port Augusta and 55 km west of Hawker, on alluvial plains adjacent to south-eastern Lake Torrens. All of the...-
Document
Published: 30 Nov 1910
-
Screech-Owl Creek (part of Lake Torrens Project). Final report at licence surrender for the period 14/6/2000 to 20/4/2006.
Possible economic Neoproterozoic stratiform / hydrothermal copper mineralisation hidden under Mesozoic and Recent sedimentary cover was targeted in an area located approximately 95 km north-east of Andamooka. Aeromagnetic data interpretation of some...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
Bute. Annual reports to licence expiry/full surrender, for the period 12/12/1998 to 16/3/2006.
Sustained recent attempts to locate economic Moonta - style copper mineralisation in Proterozoic basement in the vicinity of Bute township have been based on the presence there of a large regional aeromagnetic high, and on a past drilling discovery by...-
Document