Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
RB 99/00032 Trial dewatering of the BHP dolomite quarry at Ardrossan, South Australia.
Trial dewatering of the quarry, which is excavated in fractured and well-bedded Cambrian dolomite, took place for at least 56 days during early 1994, but pumping was terminated when a further significant water level drawdown could not be achieved. Ten...-
Document
Published: 01 Dec 1999
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 9/8/2010 to 8/8/2015.
During licence Year 16, on its renewed EL 4534 over the period October to December 2010, South Australian Coal Limited (SA Coal) undertook a drilling campaign of 15 rotary mud partly cored vertical holes for 2871 m which included 2064.7 m of coring,...-
Document
Published: 01 Sep 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual report for the period 24/3/1995 to 8/8/2018.
During the twenty-first licence year, now under tenure as EL 5719 covering the same area as former EL 4534, no new work was done. During the twenty-second licence year SA Coal commenced field work on their IOCG style mineralisation exploration...-
Document
Published: 29 Aug 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Uley. Annual reports for the period 16/9/2005 to 12/10/2018.
A licence area located 20 km west-southwest of Port Lincoln, which covers the historically worked Uley graphite deposit and environs, was taken up to try to delineate sufficient mineral resources and, eventually, ore reserves of graphite in the Mining...-
Document
Published: 25 Mar 1919
-
Sedan. Annual reports to licence expiry/full surrender, for the period 13/2/1998 to 23/6/2011.
In a study made of the Palaeozoic magmatic province underlying the Murray Basin, all available geophysical, geological and geochemical data was evaluated by Shell's technical consultants, who identified six conceptual targets which could reasonably be...-
Document
Published: 01 Nov 1911
-
Willochra (part of the Radford Creek Project). Annual reports plus final report to licence full surrender, for the period 22/6/1994 to 8/1/2001.
Investigations conducted 30 km north-east of Quorn were directed at locating possible Mississippi Valley - style base metal mineralisation, and at following up previous reports of discovered microdiamonds and kimberlite indicator minerals. Initial...-
Document
-
Paratoo (was formerly part of the Grainger Project; recently made part of the Flinders Ranges JV Project). Annual reports from the time of cessation of previous joint venture(s) reporting, for the period 20/7/2007 to 1/11/2016.
During 2007-2008, the first year of the diamond exploration joint venture with the Filsell brothers in the Paratoo area, Flinders Mines' activities comprised: • acquiring part of a detailed helicopter-borne infill aerial magnetic ('helimag') survey,...-
Document
Published: 30 Jan 1919
-
RB 79/00155 Penrice quarry dewatering progress report no. 1, October 1978-October 1979.
ICI has been undertaking a limited dewatering programme at its Penrice Quarry since mid-1978 to allow quarrying of the 4th level (EL 327 m). Monitoring carried out for the programme has included recording of the groundwater levels in wells drilled...-
Document
Published: 01 Jan 1980
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document