-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Harris. First annual report for the period 31/5/2010 to 30/5/2011.
An area extending for ~10 to ~60 km westwards from Kingoonya, comprising three separate sub-blocks, is being explored for buried Archaean greenstone belt - hosted primary metallic mineralisation. Work undertaken during the first year of tenure...-
Document
-
Data release [made at SA Director of Mines' discretion] : Deception Hill. First annual report for the period 1/6/2010 to 31/5/2011.
EL 4496 (Deception Hill) is centred approximately 15 km due south of Tarcoola, and extends from west to east for about 60 km. It is regarded by the licensee as being highly prospective for a range of commodities including gold and silver, nickel, iron...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mannum area. Annual technical reports for period ending 08/09/2018.
EL 5846 covers an area of 462 km2 and is located approximately 70km east of Adelaide. It is located within the Murray Basin, with a basement of poorly outcropping to deeply covered Neoproterozoic and Cambrian Kanmantoo Group sediments and...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Langhorne Creek, Bremer, Hartley and Currency Creek (the Fleurieu Project). Joint annual reports for the period 1/10/2008 to 30/9/2013.
In the sixth year of the project, the principal activity was the drilling of two inclined diamond holes for 633.5 m during October 2008 to investigate a possible northern buried extension of the known Rankine Trend mineralisation on EL 3641 ground...-
Document
-
Glenloth (part of the Tarcoola Joint Venture Project). First partial surrender report, for the period 11/7/2003 to 2/11/2009.
When exploring for nickel sulphide mineralisation within buried ultramafic rocks of the Archaean Lake Harris Greenstone Belt, over TEMPEST aerial EM anomalies lying ~16 km north-west of Yerda Outstation, Mithril Resources carried out a ground EM...-
Document
-
Mount Christie Siding (part of the Eucla Project). Annual reports and final report to licence expiry/full surrender, for the period 26/7/2005 to 20/3/2013.
The subject licence area, one of eight tenements which constitute Hindmarsh Resources Limited’s (Hindmarsh’s) Eucla [Basin] Project, has been explored for possible buried economic sedimentary uranium deposits that may have formed in Tertiary...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Glenloth area (the Tarcoola JV Project). Annual reports for the period 11/7/2008 to 2/11/2018.
A biogeochemical sampling survey consisting of 20 lines (407 samples) was undertaken by the JV partners during August 2009, targeting buried gold mineralisation. Black Oak and Pearl Bluebush were the dominant deep-rooted plant species sampled and, to...-
Document
-
Garford [Outstation], Indooroopilly Outstation and Half Moon Lake (the Challenger West Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 30/4/2003 to 13/10/2010.
The three licences comprising the Challenger West Project were taken up principally to explore for economic gold, which could possibly occur in strike extensions of known gold lodes formed within Archaean basement rocks that constitute the Challenger...-
Document
-
RB 2000/00003 Regolith studies related to the Birthday gold prospect, Gawler Craton, SA.
Our knowledge of geochemical dispersion of gold and gold pathfinders in the Gawler Craton (South Australia) is poor since there have been very few published research or orientation studies. In this study conducted at the Birthday gold prospect, the...-
Document
Published: 01 Mar 2000
-
RB 2008/00009 Southern Curnamona Province, Regolith Tour Guide.
This tour guide presents information about fourteen sites of interest to regolith geologists that have been identified within the southern Curnamona Province in places where the regolith is well exposed in the Olary and Barrier Ranges. The sites...-
Document
Published: 01 Aug 2008
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 2009
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 2018
-
Copley and Wearing Gorge areas. Joint annual reports to licences' surrender, for the period 18/6/2007 to 1/11/2011.
Several small areas in the vicinity of the Mount Coffin Diapir, which covers ~5 square km within the north-central Flinders Ranges immediately to the south-east of Copley, have been explored with the hope of finding additional copper resources near...-
Document
Published: 05 Sep 2011
-
EL 6176 - Wheal Ellen Mine area. Annual technical reports for period 28/06/2018 to expiry 27/06/2023.
Hillgrove Resources Ltd (Hillgrove) is exploring for base metals and associated gold mineralisation in the Cambro-Ordovician basement rocks of south-east South Australia. EL 6176 is one of 8 licences held by Hillgrove in this region. The licence is...-
Document
Published: 10 Jul 2023
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 2009
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 2015
-
Centre Hill (the Kingoonya JV Project). Annual reports to licence expiry/full surrender, for the period 7/3/2006 to 10/5/2012.
An area extending for approximately 80-115 km south-east of Tarcoola has been explored for possible economic mesothermal gold±copper mineralisation formed in Mesoproterozoic igneous basement, possible unconformity - related uranium mineralisation at...-
Document
Published: 12 Jul 2012