-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
RB 60/00082 Coober Pedy Opalfield.
Mapping of the Coober Pedy Opalfield has shown that opal occurrence, although erratic, is not entirely unpredictable. Several groups of workings are present in an area of about 150 square miles. The host rock is a distinctive pink and white...-
Document
Published: 30 Apr 1965
-
Prospect Hill. Progress reports and annual reports to licence expiry/renewal, for the period 23/11/1990 to 22/11/1994.
Continued evaluation of possible economic primary tin oxide mineralisation in the Prospect Hill area, 20 km north-west of Moolawatana Homestead, concentrated on infill channel geochemical sampling and mineragraphic/petrogenetic sampling of costeans...-
Document
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Coober Pedy. Investigation of alunite occurrence.
At the request of several interested parties from Coober Pedy, 17 channel and grab samples of alunite-bearing clays obtained from opal workings near the town were analysed for their alunite content and its purity. Recent inspections by the author of...-
Document
-
Lake Gairdner North (part of the West Roxby Project). Data release: annual reports for the period 23/7/2007 to 22/7/2012.
An area centred approximately 55 km west-southwest of Woomera was taken up to explore its IOCG mineralisation potential. Early field work consisted of the acquisition of infill gravity coverage over an irregular outline regional gravity low anomaly...-
Document
-
Talisker prospect. Progress reports to licence expiry for the period 21/4/1969 to 20/4/1970.
IP and resistivity surveys, 1:200 scale geological mapping, and soil and rock chip sampling were carried out over exploration grids covering bleached metasedimentary outcrops that might indicate possible buried lode extensions in the vicinity of the...-
Document
-
Mount Craig (part of the Hawker Project). Annual and final reports to licence expiry/full surrender for the period 15/11/2005 to 14/11/2010.
Copper Range's principal exploration targets in the Adelaide Fold Belt are secondary, near-surface oxide copper deposits that are structurally controlled and related to hydrothermal events focussed along faults late in the deformational history of the...-
Document
Published: 06 Apr 2011
-
Data release - as updated [made at SA Director of Mines' discretion] : Wild Horse Plain. Annual reports for the period 8/7/2005 to 23/2/2019, plus partial surrender reports to 23/2/2021.
An upland area located approximately 100 km south-west of Whyalla on the eastern Eyre Peninsula, and with its eastern boundary running parallel to the coast at a distance of 15 km from Cowell and Franklin Harbour, is being explored for uranium,...-
Document
Published: 11 Jan 2021
-
Kybunga (latterly a part of the Balaklava HMS Project - Iluka tenements Group 9). First annual report 3/5/2012 to 2/5/2013, plus a joint annual report and final report for Group 9 submitted at the five project licences' full surrender on 24/9/2015.
Ground within the northern onshore Saint Vincent Basin was taken up by Iluka Resources to re-appraise the heavy mineral sands (HMS) potential of buried Tertiary sediments there, after some unsuccessful exploration had previously been undertaken in the...-
Document
Published: 22 Sep 2015
-
Algebuckina. Annual reports to licence expiry/full surrender, for the period 3/8/2008 to 28/9/2014.
The only field work undertaken by Red Metal during its final six years of tenure of EL 3226/4307 Algebuckina was the assaying in 2011 of 88 soil and rock chip samples which it had collected from the vicinity of historically reported surface copper...-
Document
Published: 01 Oct 2014
-
Three Creeks area (part of the Hawker Project). Annual and final reports to licence expiry/full surrender for the period 5/6/2006 to 4/6/2010.
The Three Creeks EL 3567 covers, for the most part, the north-westerly plunging Yednalue Syncline. Lying to the south-east of the Worumba Anticline (a diapiric structure cored by disrupted Callanna Group), the syncline comprises Umberatana Group...-
Document
Published: 17 Sep 2010
-
Data release [made at SA Director of Mines' discretion] : Algebuckina. Annual reports for the period 3/8/2004 to 2/8/2008.
An area surrounding the Algebuckina Inlier of the Proterozoic Peake and Denison Ranges, which is centred approximately 50 km south-east of Oodnadatta, is being explored for possible roll-front style sedimentary uranium deposits that may have formed...-
Document
Published: 20 Oct 2008
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 2006