-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Hope. Annual reports for the period 12/4/2002 to 14/3/2019.
Exploration of an area located on western Eyre Peninsula between Sheringa and Mount Hope is continuing, with the intent of discovering economic buried base and precious metal deposits of volcanogenic sediment-hosted massive sulphide (VHMS) style...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
Mount Hope. Progress reports to licence expiry/full surrender, for the period 2/9/1986 to 1/9/1988.
Pre-development feasibility studies of the Mount Hope kaolin deposit, located 75 km north-west from Port Lincoln, gave indications that the kaolin might extend beyond the boundaries of the nine Mineral Leases under which the deposit was held....-
Document
Published: 25 Jul 1988
-
Waddikee Rocks and Corrobinnie (part of the Eyre Peninsula Project). Joint second and sixth respectively partial surrenders report, for the overall period 17/10/1996 to 11/7/2016.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling,...-
Document
-
Data release [made at SA Director of Mines' discretion] : Caralue and Kimba (the Ellemby Project, prior to inclusion as part of the East Eyre Peninsula Project). Joint annual reports for the period 6/11/2007 to 5/11/2010.
Two adjacent areas which are respectively centred near and to the south-west of Kimba are being explored for buried basement-hosted gold and nickel mineralisation, and, following establishment of a joint venture, for possible IOCG type deposits and...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Malache Well. Annual and final report for the period 30/10/92 to 29/10/93.
Base metal exploration in the Malache Well area, 15 km west-northwest of Tooligie, comprised follow-up soil sampling of geochemically anomalous areas (Zn, Pb, Ba, Ni, Co) delineated by previous exploration, but failed to repeat the results.-
Document
-
Yaninee (part of the Eyre Peninsula Uranium Joint Venture Project). Fourth partial surrender report, for the period 27/11/2001 to 12/11/2013.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling...-
Document
-
Cocata (part of the Eyre Peninsula Uranium Joint Venture Project). Final report at licence full surrender, for the period 9/2/2007 to 22/9/2010.
An area located approximately 25 km west-southwest of Wudinna has been explored for possible economic epigenetic / hydrothermal gold and base metal deposits formed within buried Proterozoic basement rocks, as well as latterly for possible economic...-
Document
-
Corrobinnie (part of the Eyre Peninsula Uranium Joint Venture Project). Fourth partial surrender report, for the period 17/10/1996 to 12/11/2013.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements (that are still extant) is to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling...-
Document
-
Mount Ive, Corrobinnie and Lake Acraman (part of the Eyre Peninsula Joint Venture Project). Joint second partial surrender report for the period 19/4/2006 to 31/12/2010.
The exploration strategy for the Joint Venture's Eyre Peninsula Project tenements has been to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling have been used to identify...-
Document
-
Data release - as updated : Caralue. Annual reports and final report to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2013.
An area centred 40 km west of Kimba has been explored initially for basement gold and nickel mineralisation, and following a joint venture, for possible IOCG and palaeochannel uranium mineralisation. During the first year of tenure, reconnaissance...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
The Eyre Peninsula Joint Venture Project [Part]. Joint final report at the surrenders of remnant areas, for the period 18/12/1995 to 14/5/2015, combined with a 5th partial surrender report for EL 5120 Corrobinnie for the period 17/10/1996 to 8/5/2015.
A total of 771.7 square km of ground from the Eyre Peninsula Project mineral exploration tenement acreage has recently been relinquished or surrendered in the case of the four subject licences. During the tenure period, the exploration strategy for...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Sheringa. Annual reports to licence expiry/renewal, for the period 16/12/2003 to 31/3/2014.
An area centred ~ 28 km east of Elliston on western Eyre Peninsula is being explored for possible economic Archaean magmatic nickel mineralisation which could be present within any buried mafic intrusions that might be associated with the Polda Basin...-
Document
-
Taragoro. Progress reports to licence expiry/full surrender for the period 20/6/1969 to 19/6/1971.
A known surface radiometric anomaly, located in the Driver River valley near Rudall on Eyre Peninsula, was investigated by ground-based and airborne geophysical methods and by sampling of alluvial and lacustrine sediments from areas near the source of...-
Document
Published: 08 Sep 1970
-
Kimba. Progress and technical reports to licence expiry/renewal for the period 6/11/1969 to 5/11/1971.
Investigations previously carried out by Pechiney had indicated the presence of substantial reserves of kaolin clays in the Kelly Tank and Bunora - Balumbah areas located near and to the south of Kimba, which might have a potential for paper-coating...-
Document
Published: 17 Dec 1971
-
Kimba. First partial surrender report, for the period 6/11/2006 to 5/11/2013.
321 square km of the former area of EL 4938 has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’ resistance to mineral exploration....-
Document
Published: 23 Jan 2014