-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Middlecamp Hills. Annual reports for the period 30/6/2009 to 29/6/2019.
Two small areas have been taken up in the Cleve Uplands district to explore structurally interesting portions of the Lower and Upper Middleback Jaspilite stratigraphic units for possible economic buried copper, gold, manganese and iron ore...-
Document
Published: 06 Aug 1918
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-37 - Eurilla JV Project, north-central Eyre Peninsula - Jungle Dam Palaeoproterozoic hydrothermal vein-hosted primary uranium mineral prospects. Drilling final report.
In 2007, Lincoln Minerals discovered greenfields uranium mineralisation near Jungle Dam on its EL 3690, located about 45 km north-east of Kimba on the northern Eyre Peninsula. EL 3690 straddles a NNW-trending splay of the Kalinjala Shear Zone (~1720...-
Document
Published: 15 Aug 1911
-
Carpie Puntha Hill. Annual reports, first partial surrender report, and final report to licence surrender, for the period 12/11/2010 to 2/5/2014.
An area centred approximately 30 km south-east of Kimba has been explored for possible economic buried base metal and/or gold and/or uranium mineralisation that may have formed in Archaean to Palaeoprotrozoic basement rocks in this part of the...-
Document
Published: 11 Jun 1914
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Data release [made at SA Director of Mines’ discretion] : Waddikee. Annual reports to licence expiry/renewal, for the period 24/5/2005 to 23/5/2010.
An area centred ~20 km south-southwest of Kimba is being explored for possible buried Tanami style orogenic lode gold and also for Mount Isa / Broken Hill style base metals mineralisation, which could occur within reactive chemical and pelitic...-
Document
Published: 10 Aug 1910
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 1903
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Verran. Annual reports submitted until the commencement of joint venture project joint reporting, for the period 29/1/2010 to 28/1/2014.
An area located in the Cowell Hills is being explored for possible economic buried iron ore deposits. The desired commodity is DSO (Direct Shipping Ore) haematite mineralisation similar to that of the Middleback Range iron deposits, where pods of...-
Document
Published: 23 May 1914
-
Data release [made at SA Director of Mines’ discretion] : Wanilla. Annual reports submitted until the commencement of the multi-licence Southern Eyre Peninsula JV Project, for the period 28/10/2004 to 27/10/2006.
A narrow north-south aligned area centred approximately 25 km west-northwest of Port Lincoln, which is mainly covered by Quaternary ferricrete, has been taken up by Centrex Metals Ltd to explore for possible concealed economic deposits of iron ores...-
Document
-
Murninnie. Annual reports and final report to licence expiry/full surrender, for the period 19/4/2006 to 14/11/2013.
During August 2006, Australasia Gold acquired a 45% interest in the historic abandoned Murninnie copper mine (Private Mine 156) and a surrounding small exploration licence (EL 3542), which are located ~30 km south-southwest of Whyalla. In July 2007,...-
Document
Published: 13 Oct 1914
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-30 - Trafford Resources Ltd, Wilcherry Hill Project, Oxy's Bore prospect magnetic anomaly IOCG target. Drilling project final report.
Trafford Resources Ltd ('Trafford'), the owner since March 2007 of the seven exploration licences comprising the Wilcherry Hill Project, has as its primary focus exploration of these tenements for economic precious and base metal deposits. The...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mosely Nobs (part of the East Eyre Peninsula Project). Annual reports for the period 5/7/2006 to 4/7/2016.
A licence area now consisting of two separate small blocks located about 60 km west of Whyalla was taken up, along with other ground in the region, because it is thought to have potential for the discovery of uranium associated with Olympic Dam style...-
Document
-
Peterlumbo. First partial surrender report for the period 1/9/1999 to 31/8/2001.
Gold and copper were the targets of exploration in the Peterlumbo Hill area, 40 km north of Kimba. 581 calcrete samples collected at 400 m centres outlined broad anomalous areas at > 5 ppb Au. Limited rock chip sampling, and 200 m infill calcrete...-
Document
-
Rudall. Data release made in lieu of submitting a second partial surrender report : annual reports for the period 22/12/1995 to 22/1/2005; plus a (subsequently added) combined annual and final report to licence expiry/full surrender on 22/1/2006.
Exploration of three small licence subareas located near Cleve, Rudall and Verran has targeted possible Palaeoproterozoic stratiform or hydrothermal base and precious metal deposits hosted within Hutchison Group metasediments. Interpretation of 1979...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-36, Dingo Hill (Cariewerloo Basin) Palaeozoic / Mesoproterozoic unconformity - related uranium mineral prospects. Project interim and final reports.
The Dingo Hill prospect lies within the eastern Gawler Craton, approximately 90 km west of Port Augusta. EL 3579 licensee Hindmarsh Resources is exploring for possible economic secondary stratiform uranium mineralisation associated with regional...-
Document
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 1909
-
Woollinie. Progress reports and annual reports plus final report to licence full surrender, for the period 20/12/1991 to 20/11/1995.
Exploration for Broken Hill / Menninnie Dam type Pb-Zn, and later for iron oxide - associated Cu-Au, that was undertaken over an area located north of Kimba within and adjacent to the Pinkawillinie Conservation Park, comprised the acquisition during...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document