-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Frome Downs Homestead. Progress and technical reports to licence expiry/renewal, for the period 1/1/1969 to 31/12/1970.
Reconnaissance shallow stratigraphic drilling with subsequent borehole geophysical electric and radioactivity logging in the south-western Frome Embayment (21 rotary mud partly cored holes, total 8841 feet), over areas lying adjacent to outcropping...-
Document
Published: 31 Dec 1970
-
Summary report on Honeymoon assessment programme (Phase 1), Honeymoon uranium deposit, South Australia.
This report summarises results of a rotary drilling and coring programme undertaken between 21/10/1978 and 16/2/1979 at the Honeymoon uranium deposit. 99 open plug holes totalling 12,452.7 m and 16 core holes totalling 1894 m were drilled in a...-
Document
-
Nuclear power : a discussion of major issues.
The Honeymoon joint venture partners, AAR Ltd, IOL Petroleum Ltd, Teton Exploration Drilling Co. Pty Ltd and Mount Isa Mines Ltd (MIM:MTA) hold title to a uranium deposit in the Lake Frome area of South Australia. It is proposed that the uranium...-
Document
-
Lake Frome [part of the Paralana Plains Uranium Project joint venture area]. Progress reports and technical reports to licence surrender/re-issue over a different area, for the period 22/4/1971 to 21/4/1973.
Exploration on SML 564 has consisted of a continuation of deep rotary mud open hole, plug and core drilling plus washing-out of existing, older Petromin "P...w" series drillholes to allow new generation downhole geophysical logging, aimed at further...-
Document
-
Report on recent exploration in SMLs 543, 544, Crocker Well prospect 22, Lake Frome, South Australia.
A 64 line km gravity survey, with stations located at 150 m spacing, was conducted to locate the position of the main Billeroo West palaeochannel within the northern part of SML 543, in order to assess the need to retain under exploration tenure the...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
South Eagle. Data release made at transfer of licence ownership : annual reports for the period 17/9/1997 to 16/9/2000.
The majority of mineral exploration undertaken in the South Eagle area, centred 40 km north-east of Olary, has targeted stratabound Pb-Zn-Ag, stratabound massive sulphide Cu-Zn-Co-Mn, and Cu-Au mineralisation that may have formed in Proterozoic rocks...-
Document
-
Honeymoon uranium : a summary of the proposed in-situ leach mining operation.
This report discusses technical aspects of the Honeymoon uranium deposit and the proposed in-situ leach mining method intended for extracting about 3000 tonnes of contained U3O8. Economic forecasts and mine development plans are presented as a way of...-
Document
-
Yarramba. Progress reports to licence expiry/renewal for the period 8/3/1976 to 7/3/1978.
Ongoing exploration for sedimentary uranium ore deposited in buried 1.5 - 6 km wide and 50 m thick Tertiary palaeochannels in the Yarramba area, located adjacent to the SA-NSW border 50 km northwest of Cockburn, included three detailed and...-
Document
Published: 17 Apr 1978
-
John Brown Well [part of Paralana Plains Joint Venture area]. Progress reports for the period 3/6/1971 to 2/6/1973.
Results of Western Nuclear's ongoing exploration/appraisal drilling of the north-western Lake Frome Plains for sedimentary uranium are presented (for 62 rotary plug holes, totalling 34,534 feet). Mineralised Tertiary palaeochannel sediments were...-
Document
-
Paralana Creek and Four Mile Creek [part of the Paralana Plains Joint Venture area]. Progress reports for the period 15/4/1968 to 14/4/1971.
A licence area covering the flat alluvial Paralana Plains extending out eastwards from the northern Flinders Ranges was taken up by the the consortium of Exoil NL, Petromin NL and Transoil NL to explore for possible economic buried occurrences of...-
Document
-
Report on drilling results, Beverley prospect, SML 564, Paralana Plains, SA.
Following the February 1972 farm-in of US-based company Western Uranium Ltd (WU) for 42 months to SML 564 in the Lake Frome area of South Australia, a drilling programme was undertaken by it to evaluate a series of buried fluvial uranium occurrences...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
Soil and groundwater investigation, Beverley prospect, SML 564. Report on Stage I feasibility study.
The Stage 1 feasibility study carried out during February-May, 1973 has included regional groundwater studies, pumping tests, logging and laboratory tests on drill cores, slope stability analyses, preliminary design of pit slopes and dewatering...-
Document
Published: 31 May 1973
-
Report on Honeymoon deposit coring programme, June 1975 - South Eagle portion of EL 132, SA.
This report summarises the drilling and coring operations conducted during June and July 1975 to obtain representative core samples of the Honeymoon sedimentary uranium deposit. The work was carried out to determine uranium content, associated...-
Document
Published: 21 Oct 1975
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Lake Frome Project. Individual licence annual reports, joint annual reports and final reports to various constituent licences' joint full surrenders, for the period 16/4/2009 to 5/6/2015.
An area centred ~36 km west of Quinyambie Homestead has been explored for possible buried economic sedimentary uranium mineralisation of palaeochannel hosted roll-front style that may have formed in relatively more distal Tertiary basinal sediments,...-
Document
Published: 30 Mar 1915