-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-21 - Mulyungarie area - Junction Dam Palaeoproterozoic metasedimentary/volcanogenic base metal and precious metal mineral prospects. Project interim and final reports.
In 2008, as part of work being performed for it to earn a 51% interest in the Mundi Mundi Plains joint venture exploration licences, Teck Cominco identified two geophysical targets within South Australia on Kalkaroo EL 3328 which it thought were...-
Document
-
Yerda Well. Annual reports and final report to licence expiry/full surrender, for the period 20/1/2004 to 19/1/2009.
Exploration for possible buried economic iron oxide - associated copper-gold (IOCG) mineral deposit targets within the subject area of the north-western Gawler Ranges utilised existing and newly acquired regional gravity data to attempt to identify...-
Document
Published: 24 Mar 1909
-
Chitanilga Hill. Data release at licence renewal : second partial surrender report, for the period 12/6/2003 to 11/6/2008.
In October 2003, Minotaur Exploration completed part of a regional infill ground gravity survey over the now relinquished portion of EL 3100, along N-S lines at a station spacing of 1 km x 2 km. A significant gravity anomaly which coincides with an...-
Document
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Primrose Hill. First partial relinquishment report for the period 13/8/2007 to 12/8/2008.
In a search for possible economic buried IOCG type mineralisation within inferred Proterozoic basement, a new regional gravity survey incorporating the subject EL 3890 Primrose Hill and Minotaur's adjacent EL 3944 Sunny Creek was undertaken in July...-
Document
-
Primrose Hill. Annual and final reports to licence expiry/full surrender for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 60 km north of William Creek, looking for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within inferred concealed Proterozoic basement east of the Peake and Denison...-
Document
Published: 12 Oct 1909
-
Leighton. Annual and final reports to licence surrender for the period 19/11/2007 to 21/8/2009.
Basal Umberatana Group glacial tillitic sedimentary sequences and upper Burra Group interglacial arenaceous sediments were explored for possible economic stratabound gold mineralisation in an area located about 10-40 km north-west of Burra. In the...-
Document
-
Cooper Hill. Annual reports and final report to licence expiry/full surrender, for the period 4/7/2003 to 24/8/2009.
An area located approximately 90 km west-northwest of Ceduna, which was considered prospective for economic buried nickel, copper and cobalt mineralisation in Voisey's Bay type deposits that could possibly have formed in Proterozoic basement...-
Document
Published: 23 Oct 1909
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Lake Labyrinth (part of the Gawler Joint Venture Project). Data release made at the surrender of a subsequently renewed licence (EL 3252) : annual reports for the period 27/7/1994 to 26/7/1999.
Exploration for possible economic buried magmatic/epithermal/hydrothermal/metamorphic gold and copper deposits, which may have formed within Archaean and Proterozoic basement rocks in an area located approximately 24 km north-west of Kingoonya,...-
Document
-
Bond Hill. Annual reports to licence surrender for the period 17/5/2002 to 3/6/2005.
An area located between Lakes Acraman and Gairdner was taken up to explore for possible buried iron oxide - associated copper-gold deposits hosted by subcropping basement rocks of the Gawler Range Volcanics (GRV). The licensee had noted a lack of...-
Document
Published: 14 Apr 1905
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-22, Lake Gilles - Corunna North area (north-western margin of Spencer Domain) IOCG mineral prospects. Project final report.
Potential Carrapateena or Prominent Hill style IOCG targets represented by newly recognised gravity anomalies in the eastern Lake Gilles area were the reason for a PACE Initiative Year 4 drilling funds proposal submitted to PIRSA by InterMet...-
Document
-
Roxby Hill. Annual and final reports to licence surrender for the period 6/2/2006 to 13/11/2008.
In a search for possible economic iron oxide - associated copper-gold mineralisation buried under deep cover to the south-west of the Olympic Dam deposit, a semi-detailed gravity survey consisting of 302 stations was read at 800 m intervals on 1.6 km...-
Document
Published: 09 Mar 1909
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-34, Drew Hill JV area Curnamona Group base metal mineral prospects. Project final report.
During early 2005, the Drew Hill joint venture partners conducted a regional base metal exploration programme over their mineral tenements located approximately 20-70 km north-east of Olary. Possible epithermal iron oxide copper-gold (IOCG)...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-18, Super Nova IOCG mineral prospect. Project interim and final reports.
This PACE-subsidised drilling project aimed to discover a new copper-gold mineralised Iron Oxide Copper Gold (IOCG) magmatic centre, similar to that which forms the setting of the Olympic Dam deposit, but lying within the northern margin of the...-
Document
Published: 01 Dec 1905